Jump to main content.


What's New on the GE/Housatonic River Project Web Site

Jump to Report Index

(updated November 2009)

What's New in the Repositories

Web Site Additions:

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.

November 6, 2009 - addition(s) to GE Plant Area - Reports

NPDES Permit and Support Documents

Letter from Carroll (GE) to Janson (USEPA), October 26, 2009, Re: NPDES Permit No. MA003891 Attachment C - Best Management Practices Plan, BMP A.1.A - Debris Removal from Manholes and Catch Basins and BMP A.1.C - Pipeline Cleaning and Inspection (PDF) (2 pp., 159 KB)

October 30, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

Post-Removal Inspection Reports

Letter (with enclosure) from Mooney (GE) to Tagliaferro (USEPA), August 27, 2009, Re: Summer 2009 Re-Vegetation Monitoring Report 1 1/2 Mile Reach Removal Action (PDF) (82 pp., 8.69 MB)

October 30, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter (with enclosure) from Gates (GE) to Tagliaferro (USEPA), October 23, 2009, Re: Newell Street Area II Final Completion Report for the Newell Street Area II Removal Action (PDF) (2365 pp., 158 MB)

October 29, 2009 - addition(s) to Former Filled Oxbows - Reports

Former Filled Oxbows J and K

Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 22, 2009, Re: Former Oxbow Areas J and K Summary of September 2009 Inspection Activities (PDF) (29 pp., 726 KB)

October 29, 2009 - addition(s) to GE Plant Area - Reports

City Recreational Area

Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 20, 2009, Re: East Street Area 2-South Summary of August/September 2009 Inspection Activities - City Recreational Area (PDF) (6 pp., 191 KB)

October 28, 2009 - addition(s) to Allendale - Reports

EPA Allendale School PCB Air Sampling Results for 2009 (PDF) (1 p., 20 KB)

October 26, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

Post-Removal Inspection Reports

Letter from Tagliaferro (USEPA) to Mooney (GE), October 13, 2009, Re: 2009 Inspection of Riverbank Soil Restoration, Riprap, Aquatic Habitat Enhancement Structures, and Critical Ancillary Items Report 1 1/2 Mile Reach Removal Action (PDF) (2 pp., 25 KB)

October 26, 2009 - addition(s) to Groundwater - Reports

GMA - 4, Hill 78 Area

Letter from Fisher (USEPA), to Gates (GE), October 20, 2009, Re: Conditional Approval of General Electric's August 28, 2009 submittal titled Groundwater Management Area 4, Groundwater Quality Monitoring Interim Report for Spring 2009 (PDF) (2 pp., 33 KB)

GMA - 5, Oxbow Areas A and C

Letter from Fisher (USEPA) to Gates (GE), October 20, 2009, Re: Conditional Approval of General Electric's July 10, 2009 submittal title Groundwater Management Area 5, Long-Term Monitoring Program Monitoring Event Evaluation Report for Spring 2009 (PDF) (2 pp., 33 KB)

October 26, 2009 - addition(s) to OPCA - Reports

OPCA Reports

Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 29, 2009, Re: Building 71 and Hill 78 On-Plant Consolidation Areas Summary of August 2009 Post-Closure Inspection Activities (PDF) (12 pp., 1.42 MB)

October 19, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2009

September 2009 (PDF) (155 pp., 2.23 MB)

October 16, 2009 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 9, 2009, Re: Lyman Street Area Summary of September 2009 Inspection Activities (PDF) (34 pp., 1.01 MB)

October 16, 2009 - addition(s) to GE Plant Area - Reports

Hill 78 Area - Remainder

Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 8, 2009, Re: Hill 78 Area-Remainder Summary of September 2009 Post-Remediation Inspection Activities (PDF) (5 pp., 686 KB)

October 13, 2009 - addition(s) to Floodplain Properties Reports

Phase 2 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 1, 2009, Re: Floodplain Residential and Non-Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River Summary of September 2009 Inspection Activities for the Remediated Phase 2 Floodplain Properties (PDF) (17 pp., 3.51 MB)

Phase 3 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 1, 2009, Re: Floodplain Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River Summary of September 2009 Inspection Activities for the Phase 3 Floodplain Properties (PDF) (18 pp., 2.71 MB)

Phase 4 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 1, 2009, Re: Floodplain Residential and Non-Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River Summary of September 2009 Inspection Activities for the Group 4 C Floodplain Properties (PDF) (32 pp., 1.99 MB)

October 8, 2009 - addition(s) to GE Plant Area - Reports

NPDES Permit and Support Documents

Attachment C - Best Management Practices Plan BMP A.1.B & A.2.A - Debris Removal From Oil/Water Separators (OWS) and Short-Term OWS Enhancements (PDF) (3 pp., 191 KB)

October 1, 2009 - addition(s) to Former Filled Oxbows - Reports

Former Filled Oxbows A and C

Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2009, Re: Former Oxbow Areas A and C Summary of August 2009 Inspection Activities (PDF) (19 pp., 1.15 MB)

Newell Street Area I

Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2009, Re: Newell Street Area I Summary of August 2009 Inspection Activities (PDF) (24 pp., 342 KB)

Newell Street Area II

Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2009, Re: Newell Street Area II Summary of August 2009 Inspection Activities (PDF) (72 pp., 1.72 MB)

October 1, 2009 - addition(s) to GE Plant Area - Reports

20s and 30s Complexes

Letter from James Gagnon, O'Reilly, Talbot & Okum Associates, Inc, to John Ziegler (MADEP), September 22, 2009, Re: Building Demolition Barrier Areas Willam Stanley Business Park - 20s and 30s Complexes East Street Pittsfield, MA (PDF) (7 pp., 1.13 MB)

East Street Area 2 - North

Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2009, Re: East Street Area 2-North Summary of August 2009 Inspection Activities (PDF) (5 pp., 476 MB)

September 28, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

Public Presentations

Overview of Upper 2-Mile Reach - Housatonic River Restoration, September 2009 (PDF) (46 pp., 3.65 MB)

September 25, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

General

Letter (with attachments) from Mooney (GE) to Tagliaferro (USEPA), September 16, 2009, Re: 1 1/2-Mile Reach 2009 Inspection of Riverbank Soil Restoration, Riprap, Aquatic Habitat Enhancement Structures, and Critical Ancillary Items (PDF) (27 pp., 3.01 MB)

September 25, 2009 - addition(s) to GE Plant Area - Reports

NPDES Permit and Support Documents

Letter from Carroll (GE) to Janson (USEPA), August 28, 2009, Re: General Electric Company, Pittsfield, MA NPDES Permit No. MA0003891, Attachment C - Best Management Practices Plan BMP A.1.C - Pipeline Cleaning and Inspection (PDF) (114 pp., 56.57 MB)

September 24, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

General

Letter from Tagliaferro (USEPA) to Mooney (GE), September 17, 2009, Re: Summer 2009 Re-Vegetation Monitoring Report 1 1/2 Mile Reach Removal Action (PDF) (2 pp., 26 KB)

September 24, 2009 - addition(s) to Housatonic River ½ Mile - Reports

Inspection Reports

Letter (with Attachment) from Mooney (GE) to Tagliaferro (USEPA), September 17, 2009, RE: Upper 1/2-Mile Reach of the Housatonic River 2009 Inspection of Restored Bank Vegetation and Aquatic Habitat Enhancement Structures (PDF) (28 pp., 1.87 MB)

September 22, 2009 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with enclosure) from Tagliaferro (USEPA) to Gates (GE), September 14, 2009, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for Removal Action for the Lyman Street Area Removal Action, dated August 2009 (PDF) (3 pp., 101 KB)

September 18, 2009 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Pollution Report (POLREP) #2 and Final - Lyman Street Area Removal Action Area (RAA), September 16, 2009 (PDF) (6 pp., 91 KB)

Letter from Tor (MDEP) to Tagliaferro (USEPA), September 10, 2009, Re: Approval of Final Completion Report for the Lyman Street Removal Action (PDF) (1 p., 241 KB)

Letter from Young (MEOEEA) to Gates (GE), September 2, 2008, Re: Certification of Completion of Installation of Restoration Work; Newell Street Area II and Lyman Street Area (PDF) (2 pp., 63 KB)

September 18, 2009 - addition(s) to GE Plant Area - Reports

East Street Area 2 - North

Letter (with attachment) from Carroll (GE) to Tagliaferro (USEPA), September 11, 2009, Re: East Street Area 2- North 19s Complex Demolition and Site Restoration Program Follow-up to Notification of Ambient Air Particulate Results Exceeding Action Level (PDF) (5 pp., 225 KB)

September 18, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2009

August 2009 (PDF) (140 pp., 2.37 MB)

September 15, 2009 - addition(s) to Meetings and Events

GE-Housatonic River Citizens Coordinating Council (CCC), September 23, 2009, Lenox, MA

Agenda (PDF) (1 p., 24 KB)

September 15, 2009 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter from Fisher (USEPA) to Gates (GE), September 8, 2009, Re: Conditional Approval of General Electric's June 19, 2009 submittal titled Groundwater Management Area 1, Proposed Modifications to Monitoring Well Network (PDF) (2 pp., 28 KB)

September 10, 2009 - addition(s) to GE Plant Area - Reports

NPDES Permit and Support Documents

Stormwater Pollution Prevention Plan, June 2009, Prepared for General Electric Company by ARCADIS, Syracuse New York (PDF) (114 pp., 6.86 MB)

September 9, 2009 - addition(s) to GE Plant Area - Reports

East Street Area 2 - North

Letter (with attachments) from Carroll (GE) to Tagliaferro (USEPA), September 3, 2009, Re: East Street Area 2-North 19s Complex Demolition and Site Restoration Program Analytical Results from August 27-28, 2009 Follow-Up PCB Ambient Air Sampling Event (PDF) (3 pp., 62 KB)

September 9, 2009 - addition(s) to Silver Lake - Reports

Soils Adjacent to the Silver Lake

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), July 2, 2009, Re: Silver Lake Area Responses to Trustee Comments Regarding Natural Resource Restoration/Enhancement Measures for Banks of Silver Lake (PDF) (21 pp., 1.64 MB)

September 4, 2009 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with Enclosure) from Gates (GE) to Fisher (USEPA), August 28, 2009, Re: Groundwater Management Area 1 NAPL Monitoring Report for Spring 2009 (PDF) (173 pp., 8.04 MB)

GMA - 3, Unkamet Brook Area

Letter (with enclosure) from Gates (GE) to Tagliaferro (USEPA), August 28, 2009, Re: Groundwater Management Area 3 Groundwater Quality and NAPL Monitoring Interim Report for Spring 2009 (PDF) (230 pp., 4.74 MB)

GMA - 4, Hill 78 Area

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), August 28, 2009, Re: Groundwater Management Area 4 Groundwater Quality Monitoring Interim Report for Spring 2009 (PDF) (201 pp., 4.63 MB)

September 4, 2009 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (wirh Enclosure) from Gates (GE) to Tagliaferro (USEPA), August 27, 2009, Re: Lyman Street Area Final Completion Report for the Lyman Street Area Removal Action (PDF) (1621 pp., 78.54 MB)

Newell Street Area II

Letter (with attachments) from Gates (GE) to Young (MEOEEA), August 26, 2009, Re: Newell Street Area II Summary of July 2009 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (13 pp., 1.75 MB)

September 4, 2009 - addition(s) to GE Plant Area - Reports

East Street Area 2 - North

Letter (with attachment) from Carroll (GE) to Tagliaferro (USEPA), August 28, 2009, Re: East Street Area 2-North 19s Complex Demolition and Site Restoration Program Follow-up to Notification of Ambient Air PCB Results Exceeding Action Level (PDF) (10 pp., 239 KB)

September 3, 2009 - addition(s) to Rest of River - Reports

General

Letter from Klee (GE) to Amey Marrella (CTDEP), August 26, 2009, Re: Thank you reply to August 6, 2009 letter regarding the CT visit (PDF) (2 pp., 98 KB)

Letter from Amey Marrella (CTDEP), to Klee (GE), August 6, 2009, Re: Visit to Connecticut Department of Environmental Protection (PDF) (2 pp., 113 KB)

September 2, 2009 - addition(s) to Rest of River - Reports

Corrective Measures Study Proposal

Letter (with enclosure) from Silfer (GE) to Svirsky (USEPA), August 31, 2009, Re: Rest of River Work Plan for Evaluation of Additional Remedial Alternative (PDF) (84 pp., 28.20 MB)

August 31, 2009 - addition(s) to GE Plant Area - Reports

20s Complex

Letter (with attachments) from Carroll (GE) to Ziegler (MDEP) and Tagliaferro (USEPA), August 24, 2009, Re: 20s Complex Summary of Annual ERE Inspection for 2009 (PDF) (5 pp., 157 KB)

30s Complex

Letter (with attachment) from Carroll (GE) to Ziegler (MDEP0 and Tagliaferro (USEPA), August 24, 2009, Re: 30s Complex Summary of Annual ERE Inspection for 2009 (PDF) (5 pp., 162 KB)

40s Complex

Letter (with attachment) from Carroll (GE) to Tagliaferro (USEPA), August 24, 2009, Re: 40s Complex Summary of Annual Inspection of Temporary Stockpile Area (PDF) (4 pp., 87 KB)

August 28, 2009 - addition(s) to OPCA - Reports

OPCA Reports

Letter (with enclosures) from Silfer (GE) to Cavagnero (USEPA), September 8, 1999, Re: On-Plant Consolidation Areas - Supplemental Addendum to June 1999 Detailed Work Plan (PDF) (15 pp., 580 KB)

August 28, 2009 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Gates (GE) to Young (MEOEEA), August 20, 2009, Re: Lyman Street Area Summary of July 2009 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (12 pp., 1.68 MB)

August 24, 2009 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), August 14, 2009, Re: Plant Site 1 Groundwater Management Area Sheen Observation Follow-up Notification (PDF) (4 pp., 527 KB)

August 21, 2009 - addition(s) to Rest of River - Reports

Community Updates

GE/Housatonic River Site Community Update Fact Sheet, August 2009 (PDF) (4 pp., 939 KB)

August 19, 2009 - addition(s) to Silver Lake - Reports

Silver Lake Sediment

Letter from Svirsky, (USEPA) to Silfer (GE), August 11, 2009, Re: Conditional Approval of GE's Revised Conceptual Removal Design/Removal Action Work Plan for Silver Lake Sediments (PDF) (10 pp., 409 KB)

August 17, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2009

July 2009 (PDF) (157 pp., 1.84 MB)

August 17, 2009 - addition(s) to OPCA - Reports

OPCA PCB Ambient Air Sampling Results

Comparison of EPA and GE OPCA Replicate PCB Air Sample Results Through June 2009 (PDF) (1 p., 21 KB)

August 13, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter (with attachments) from Gates (GE) to Fisher (USEPA), August 7, 2009, Re: Newell Street Area II Summary of July 2009 Inspection Activities at the Vermont/Ontario Street Area (PDF) (5 pp., 335 KB)

August 12, 2009 - addition(s) to GE Plant Area - Reports

NPDES Permit and Support Documents

Final Permit Modification - Effective October1, 2009

August 7, 2009 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), July 30, 2009, Re: Groundwater Management Area 1 Groundwater Quality Monitoring Interim Report for Spring 2009 (PDF) (167 pp., 5.84 MB)

July 31, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter from Lovely (USEPA) to Silfer (GE), May 16, 2006, Re: Approval of General Electric's Newell Street Area II Proposal for Engineered Barrier Modifications (PDF) (2 pp., 49 KB)

July 31, 2009 - addition(s) to GE Plant Area - Reports

20s, 30s, and 40s Complexes

Semi-Annual Inspection Building Demolition Barrier Areas June 2009, 20s and 30s Complexes William Stanley Business Park, report prepared for Pittsfield Economic Development Authority by O'Reilly, Talbot & Okun Associates, Inc. July 8, 2009 (PDF) (25 pp., 17.07 MB)

July 27, 2009 - addition(s) to Silver Lake - Reports

Soils Adjacent to the Silver Lake

Letter (with attachments) from Tagliaferro (USEPA) to Carroll (GE) and Hines (PEDA), July 13, 2009, Re: Conditional Approval of Activities Related to the Installation of a Box Culvert Silver Lake Removal Action Area (PDF) (12 pp., 1.73 MB)

July 27, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter (with attachments) form Gates (GE) to Tagliaferro (USEPA), June 4, 2009, Re: Newell Street Area II Performance of EPA-Approved Supplemental Remediation Activities for Vermont/Ontario Street Area (PDF) (15 pp., 2.08 MB)

Letter from Young (EOEEA) to Gates (GE), September 2, 2008, Re: Certification of Completion of Installation of Restoration Work Newell Street Area II and Lyman Street Area (PDF) (2 pp., 63 KB)

July 27, 2009 - addition(s) to GE Plant Area - Reports

NPDES Permit and Support Documents

Attachment C--Best Management Plan; BMP A.1.A--Sediment and Debris Removal from Manholes and Catch Basins (July 15, 2009) (PDF) (2 pp., 318 KB)

East Street Area 2 - South

Letter from Fisher (GE) to Gates (USEPA), July 15, 2009, Re: Conditional Approval of General Electric's April 21, 2009 submittal titled East Street Area 2-South Second Addendum to Conceptual Removal Design/Removal Action Work Plan (PDF) (3 pp., 38 KB)

July 27, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

General

Letter from Tagliaferro (USEPA) to Mooney (GE), June 29, 2009, Re: 2008 Annual Monitoring Report - Revised May 2009 (PDF) (2 pp., 91 KB)

July 21, 2009 - addition(s) to Groundwater - Reports

GMA - 5, Oxbow Areas A and C

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), July 10, 2009, Re: Groundwater Management Area 5 Long-Term Monitoring Program Monitoring Event Evaluation Report for Spring 2009 (PDF) (97 pp., 1.77 MB)

July 21, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

General

Letter from Tagliaferro (USEPA) to Mooney (GE), July 13, 2009, Re; Spring 2009 Re-Vegetation Monitoring Report (PDF) (4 pp., 40 KB)

July 20, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

General

Letter from Tagliaferro (USEPA) to Mooney (GE), April 27, 2009, Re; 2008 Annual Monitoring Report 1 1/2 Mile Reach Removal Action (PDF) (5 pp., 38 KB)

July 20, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2009

June 2009 (PDF) (222 pp., 4.51 MB)

July 15, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

General

Spring 2009 Re-Vegetation Monitoring Report 1 1/2 Mile Reach Removal Action, June 10, 2009 (PDF) (43 pp., 7.27 MB)

July 14, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter (with attachments) from Gates (GE) to Young (MEOEEA), July 1, 2009, Re: Newell Street Area II Summary of June 2009 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (12 pp., 1.01 MB)

July 13, 2009 - addition(s) to GE Plant Area - Reports

Hill 78 Area - Remainder

Letter (with attachment) from Gates (GE) to Fisher (USEPA), July 2, 2009, Re: Hill 78 Area-Remainder Summary of June 2009 Post-Remediation Inspection Activities (PDF) (5 pp., 657 KB)

July 13, 2009 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Gates (GE) to Young (MEOEEA), July 1, 2009, Re: Lyman Street Area Summary of June 2009 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (14 pp., 1.59 MB)

July 6, 2009 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter(with attachments) from Gates (GE) to Fisher (USEPA), June 19, 2009, Re: Groundwater Management Area 1 Proposed Modifications to Monitoring Well Network (PDF) (6 pp., 2.65 MB)

June 30, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter from Fisher (USEPA) to Gates (GE), June 8, 2009, RE: Conditional Approval of General Electric's June 4, 2009 submittal titled Performance of EPA-Approved Supplemental Remediation Activities for Vermont/Ontario Street Area (PDF) (2 pp., 207 KB)

Former Filled Oxbows J and K

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 10, 2009, Re: Former Oxbow Areas J and K Summary of May 2009 Vegetation Inspection Activities (PDF) (29 pp., 705 KB)

June 30, 2009 - addition(s) to Rest of River - Reports

General - CSTAG Correspondence

CSTAG Updated Recommendations on the Housatonic Rest of River Site - June 15, 2009 (PDF) (5 pp., 50 KB)

June 29, 2009 - addition(s) to OPCA - Reports

OPCA Reports

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 18, 2009, Re: Building 71 and Hill 78 On-Plant Consolidation Areas Summary of May 2009 Post-Closure Inspection Activities (PDF) (12 pp., 2.81 MB)

June 29, 2009 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter(with attachments) from Gates (GE) to Tagliaferro (USEPA), June 16, 2009, Re: Lyman Street Area Summary of May 2009 Inspection Activities (PDF) (29 pp., 719 KB)

June 29, 2009 - addition(s) to Housatonic River ½ Mile - Reports

Inspection Reports

Letter from Mooney (GE) to Tagliaferro (USEPA), June 18, 2009, Re: 2009 Bank Erosion Inspection Upper 1/2-Mile Reach Removal Action (PDF) (2 pp., 125 KB)

June 23, 2009 - addition(s) to GE Plant Area - Reports

East Street Area 2 - North

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 11, 2009, Re: East Street Area 2-North Summary of May 2009 Inspection Activities (PDF) (6 pp., 533 KB)

June 23, 2009 - addition(s) to Former Filled Oxbows - Reports

Former Filled Oxbows A and C

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 11, 2009, Re: Former Oxbow Areas A and C Summary of May 2009 Vegetation Inspection Activities (PDF) (17 pp., 2.72 MB)

Newell Street Area I

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 11, 2009, Re: Newell Street Area I Summary of May 2009 Engineered Barrier Inspection Activities (PDF) (24 pp., 329 KB)

Newell Street Area II

Letter (with attachments) from Gates (GE) to Fisher (USEPA), June 11, 2009, Re: Newell Street Area II Summary of May 2009 Inspection Activities (PDF) (65 pp., 937 KB)

June 15, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2009

May 2009 (PDF) (603 pp., 2.19 MB)

June 15, 2009 - addition(s) to Floodplain Properties Reports

Phase 2 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 4, 2009, Re: Floodplain Residential and Non-Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River, Summary of May 2009 Vegetation Inspection Activities for the Remediated Phase 2 Floodplain Properties (PDF) (17 pp., 5.70 MB)

Phase 3 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), June 2, 2009, Re: Floodplain Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River, Summary of May 2009 Vegetation Inspection Activities for the Phase 3 Floodplain Properties (PDF) (17 pp., 2.70 MB)

June 15, 2009 - addition(s) to GE Plant Area - Reports

East Street Area 1 - North

Grant of Envrionmental Restriction and Easements, Parcels J10-8-1, J10-8-2, J10-8-3, J10-8-4, J10-8-5, J10-8-6, Recorded September 27, 2005 (PDF) (52 pp., 4.28 MB)

20s Complex

Grant of Environmental Restriction and Easement - 20's Complex, February 2005 (PDF) (107 pp., 4.74 MB)

30s Complex

Grant of Envrionmental Restriction and Easement - 30's Complex, February 2005 (PDF) (81 pp., 3.60 MB)

June 11, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

General

Overview of Upper 2-Mile Reach Restoration, June 9, 2009 (PDF) (33 pp., 2.64 MB)

June 5, 2009 - addition(s) to GE Plant Area - Reports

East Street Area 1 - North

Letters from Carroll (GE) to U.S. Sprint, Western Massachusetts Electric Company, and Massachusetts Highway Department (Encumbrance Holders of Parcel K11-1-15), April 28, 2005, RE: Conditional Solution Notification (PDF) (6 pp., 1.98 MB)

Letter from Carroll (GE) to CSXT (Property Owner of Parcel K11--1-15), April 30, 2004; RE: Conditional Solution Notification (PDF) (5 pp., 978 KB)

Letter from Carroll (GE) to Callahan Outdoor Advertising, Inc. (Encumbrance Holder of Parcel K10-14-1), April 16, 2004, RE: Conditional Solution Notification (PDF) (7 pp., 1.72 MB)

June 4, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

General

2008 Annual Monitoring Report - Revised, May 2009 (PDF) (63 pp., 5.24 MB)

June 3, 2009 - addition to GE Plant Area - Reports

NPDES Draft Permit and Support Documents

NPDES - Part 1.B Conveyance Survey Report (PDF) (76 pp., 33 MB)

June 1, 2009 - addition(s) to Floodplain Properties Reports

Phase 4 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), May 21, 2009, Re: Floodplain Residential and Non-Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River, Summay of April/May 2009 Inspection Activities for the Group 4C Floodplain Properties (PDF) (38 pp., 3.08 MB)

May 29, 2009 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter from Fisher (USEPA) to Gates (GE), May 21, 2009, Re: Conditional Approval of General Electric's February 27, 2009 submittal titled Groundwater Management Area 1, NAPL Monitoring Report for Fall 2008 (PDF) (3 pp., 31 KB)

GMA - 4, Hill 78 Area

Letter from Fisher (USEPA) to Gates (GE), May 21, 2009, Re: Conditional Approval of General Electric's February 27, 2009 submittal titled Groundwater Management Area 4, Groundwater Quality Monitoring Interim Report for Fall 2008 (PDF) (4 pp., 92 KB)

May 29, 2009 - addition(s) to GE Plant Area - Reports

20s, 30s, and 40s Complexes

Letter (with Attachments) from Novotny (GE) to Tagliaferro (USEPA), June 21, 2005, Re: Requested Data from 20s and 30s Complexes (PDF) (32 pp., 399 KB)

East Street Area 1 - North

Letter from Carroll (GE) to property owner of Parcel K10-14-1, April 16, 2004, Re: Conditional Solution Notification (PDF) (7 pp., 397 KB)

Letter (with attachment) from Carroll (GE) to CSXT (Easement Holder) on Property at 1277 East Street (Parcel K10-14-1). April 16, 2004, Re: Conditional Solution Notification (PDF) (7 pp., 1.73 MB)

Letter from Nalipinski (USEPA) to the Property Owner at 1277 East Street (Parcel K10-14-1), April 7, 2004, Re: Conditional Solution Notification (PDF) (4 pp., 858 KB)

May 19, 2009 - addition(s) to Rest of River - Reports

Corrective Measures Study - Public Comments

Informal Public Comments for GE's Response to EPA's Interim Comments on the Corrective Measures Study for the Rest of The River, 2009 (PDF) (90 pp., 5.98 MB)

May 18, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2009

April 2009 (PDF) (508 pp., 2.43 MB)

May 6, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter from Fisher (USEPA) to Gates (GE), April 28, 2009, Re: Conditional Approval of General Electric's April 14, 2009 submittal titled Newell Street Area II, Third Addendum to Final Removal Design/Removal Action Work Plan (PDF) (2 pp., 25 KB)

May 6, 2009 - addition(s) to Allendale - Reports

EPA Allendale School PCB Air Sampling Results, through March 2009 (PDF) (1 p., 15 KB)

May 6, 2009 - addition(s) to OPCA - Reports

OPCA PCB Ambient Air Sampling Results

Comparison of EPA and GE OPCA Replicated Air Sampling results for 2009 (PDF) (1 p., 15 KB)

April 27, 2009 - addition(s) to GE Plant Area - Reports

East Street Area 2 - South

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), April 21, 2009, Re: East Street Area 2-South Second Addendum to Conceptual Removal Design/Removal Action Work Plan (PDF) (482 pp., 38.91 MB)

April 27, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), April 14, 2009, Re: Newel Street Area II Third Addendum to Final Removal Design/Removal Action Work Plan (PDF) (45 pp., 2.54 MB)

April 24, 2009 - addition(s) to Silver Lake - Reports

Silver Lake Sediment

General Electric Revised Conceptual Removal Design/Removal Action Work Plan For Silver Lake Sediments, Originally Submitted July 2008, Revised April 2009 (PDF) (89 pp., 9.65 MB)

April 17, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2009

March 2009 (PDF) (923 pp., 7.06 MB)

April 17, 2009 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter from Fisher (USEPA) to Gates (GE), April 8, 2009, Re: Conditional Approval of General Electric's January 31, 2009 submittal titled Plant Site 1 Groundwater Management Area, Groundwater Quality Monitoring Interim Report for Fall 2008 (PDF) (3 pp., 32 KB)

GMA - 2, Oxbow Areas J and K

Letter from Fisher (USEPA) to Gates (GE), April 8, 2009, Re: Conditional Approval of General Electrics"s February 6, 2009 submittal titled Groundwater Management Area 2, Long-Term Monitoring Program Monitoring Event Evaluation Report for Fall 2008 (PDF) (3 pp., 32 KB)

GMA - 3, Unkamet Brook Area

Letter from Fisher (USEPA) to Gates (GE), April 8, 2009, Re: Conditional Approval of General Electric's February 27, 2009 submittal titled Groundwater Management Area 3, Groundwater Quality and NAPL Monitoring Interim Report for Fall 2008 (PDF) (3 pp., 86 KB)

GMA - 5, Oxbow Areas A and C

Letter from Fisher (USEPA) to Gates (GE), April 8, 2009, Re: Conditional Approval of General Electric's February 13, 2009 submittal titled Groundwater Management Area 5, Long-Term Monitoring Program Monitoring Event Evaluation Report for Fall 2008 (PDF) (3 pp., 87 KB)

April 16, 2009 - addition(s) to Rest of River - Reports

Corrective Measures Study - Related Correspondence

Letter from Svirsky (USEPA) to Silfer (GE), April 14, 2009, Re: GE-Pittsfield/Housatonic River Site: Rest of River Corrective Measures Study: Submittal of an Addendum to the CMS Proposal (PDF) (4 pp., 40 KB)

Letter from McLaren (GE) to Conway (USEPA), April 10, 2009, Re: Additional Rest of River Corrective Measures Study Sediment Alternative Proposed by EPA and the GE Draft Work Plan for an Additional Alternative (PDF) (2 pp., 98 KB)

April 9, 2009 - addition(s) to Housatonic River ½ Mile - Reports

Annual Monitoring Reports

Letter from Tagliaferro (USEPA) to Silfer (GE), April 6, 2009, Re: Conditional Approval of GE's 2008 Annual Monitoring Report Upper 1/2-Mile Reach of the Housatonic GE-Pittsfield/Housatonic River Site (PDF) (3 pp., 28 KB)

April 7, 2009 - addition(s) to Rest of River - Reports

Corrective Measures Study - Related Correspondence

Letter from Svirsky (USEPA) to Silfer (GE), April 1, 2009, Re: GE-Pittsfield/Housatonic River Site: Addendum to the Corrective Measures Study (CMS) Proposal and Subsequent Submittal of a Revised CMS (PDF) (4 pp., 141 KB)

April 3, 2009 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter (with report) from Gates (GE) to Svirsky (USEPA), March 26, 2009, Re: Unkamet Brook Area Conceptual Removal Design/Removal Action Work Plan for Unkamet Brook Area-Remainder

What's New at the Repositories
(the following PDFs are posted for 6 months)

Documents submitted to the Repositories between

Resources

Press Releases

Public Events & Meetings

Top of Page

Serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont, & Tribal Nations


Local Navigation


Jump to main content.