Air Monitoring During Full Scale Dredging
(Fall 2004) - New Bedford Harbor Superfund Site
The first season of full scale dredging in the upper (northern)
reaches of New Bedford Harbor began in September 2004. As part
of this dredging of PCB-contaminated sediments, a comprehensive
air monitoring program is being implemented to ensure that any
airborne PCBs that result from the dredging, desanding, dewatering
or water treatment operations are well below levels of concern.
A total of ten air monitoring locations will be used throughout
the two to three month dredging program in 2004, as described below.
Three air monitoring stations will be located at the desanding
facility at the foot of Sawyer Street in New Bedford, and three
additional air monitoring stations will be located at the dewatering
facility on Hervey Tichon Avenue in New Bedford (in the North Terminal
area of the harbor). An air monitoring unit will also be located
on one of the dredging barges. These seven stations (plus a co-located
sampler at one of them to address quality control) will be used
to measure airborne PCBs at the three potential source locations
associated with the harbor cleanup (i.e., the dredging, the desanding
facility and the dewatering/water treatment facility)
Three additional air monitoring stations will be placed downwind
of these three potential source areas in locations that include
residential and commercial areas.
The data from these ten locations will be used for two purposes.
First and foremost, the data will be compared to risk-based safe
levels to ensure that airborne PCBs are below levels of concern.
Since the adverse impacts associated with PCBs depend on long term
(or chronic) periods of exposure rather than short term (or acute)
individual episodes of exposure, this assessment will include a
tracking effort to compare the cumulative exposure to airborne
PCBs over the duration of the dredging program to long term acceptable
levels.
The second use of the airborne PCB data will be to verify and
improve the computer modeling that is being used for the site.
Once verified, this modeling will continue to be used to identify
potential impacts from the dredging and dewatering operations and,
similarly, those locations best suited for air sampling to ensure
the protection of human health.
| Sample
Location |
Date |
Airborne
PCB Levels* |
| New Bedford - Former
Aerovox facility (shoreline) |
09/08/04 |
1,000
ng/m3 |
| New Bedford - Former
Aerovox facility (shoreline) |
09/08/04 |
1,100
ng/m3 |
| New Bedford - Dredge
(in river) |
09/08/04 |
720
ng/m3 |
| New Bedford - Manomet
Street (near shoreline) |
09/08/04 |
170
ng/m3 |
| New Bedford - Coffin
Avenue (near shoreline) |
09/08/04 |
150
ng/m3 |
| New Bedford - Sawyer
Street desanding facility |
09/08/04 |
28
ng/m3 |
| New Bedford - Sawyer
Street desanding facility |
09/08/04 |
37
ng/m3 |
| New Bedford - Sawyer
Street desanding facility |
09/08/04 |
56
ng/m3 |
| New Bedford - North
Terminal dewatering facility |
09/08/04 |
19
ng/m3 |
| New Bedford - North
Terminal dewatering facility |
09/08/04 |
16
ng/m3 |
| New Bedford - North
Terminal dewatering facility |
09/08/04 |
47
ng/m3 |
| New Bedford - Former
Aerovox facility (shoreline) |
09/14/04 |
1,449
ng/m3 |
| New Bedford - Dredge
(in river) |
09/14/04 |
98
ng/m3 |
| New Bedford - Manomet
Street (near shoreline) |
09/14/04 |
223
ng/m3 |
| New Bedford - Coffin
Avenue (near shoreline) |
09/14/04 |
48
ng/m3 |
| New Bedford - Sawyer
Street desanding facility |
09/14/04 |
64
ng/m3 |
| New Bedford - Sawyer
Street desanding facility |
09/14/04 |
64
ng/m3 |
| New Bedford - Sawyer
Street desanding facility |
09/14/04 |
86
ng/m3 |
| New Bedford - North
Terminal dewatering facility |
09/14/04 |
38
ng/m3 |
| New Bedford - North
Terminal dewatering facility |
09/14/04 |
39
ng/m3 |
| New Bedford - North
Terminal dewatering facility |
09/14/04 |
61
ng/m3 |
| New Bedford - Former
Aerovox facility (shoreline) |
09/22/04 |
590
ng/m3 |
| New Bedford - Dredge
(in river) |
09/22/04 |
1,200
ng/m3 |
| New Bedford - Manomet
Street (near shoreline) |
09/22/04 |
97
ng/m3 |
| New Bedford - Coffin
Avenue (near shoreline) |
09/22/04 |
5
ng/m3 |
| New Bedford - Coffin
Avenue - duplicate |
09/22/04 |
5
ng/m3 |
| New Bedford - Sawyer
Street desanding facility |
09/22/04 |
7
ng/m3 |
| New Bedford - Sawyer
Street desanding facility |
09/22/04 |
10
ng/m3 |
| New Bedford - Sawyer
Street desanding facility |
09/22/04 |
17
ng/m3 |
| New Bedford - North
Terminal dewatering facility |
09/22/04 |
6
ng/m3 |
| New Bedford - North
Terminal dewatering facility |
09/22/04 |
5
ng/m3 |
| New Bedford - North
Terminal dewatering facility |
09/22/04 |
19
ng/m3 |
| |
Sample
Location |
Date |
Airborne
PCB Levels |
| Former Aerovox facility
(shoreline) |
09/27/04 |
790
ng/m3 |
| Dredge (in river) |
09/27/04 |
2,700 ng/m3 |
| Manomet Street (near
shoreline) |
09/27/04 |
420 ng/m3 |
| Coffin Avenue (near
shoreline) |
09/27/04 |
340 ng/m3 |
| Sawyer Street desanding
facility |
09/27/04 |
35
ng/m3 |
| Sawyer Street desanding
facility |
09/27/04 |
170
ng/m3 |
| Sawyer Street desanding
facility |
09/27/04 |
210
ng/m3 |
| North Terminal dewatering
facility |
09/27/04 |
80
ng/m3 |
| North Terminal dewatering
facility |
09/27/04 |
75
ng/m3 |
| North Terminal dewatering
facility |
09/27/04 |
120
ng/m3 |
| Former Aerovox facility
(shoreline) |
10/18/04 |
560
ng/m3 |
| Dredge (in river) |
10/18/04 |
700
ng/m3 |
| Manomet Street (near
shoreline) |
10/18/04 |
260
ng/m3 |
| Coffin Avenue (near
shoreline) |
10/18/04 |
36
ng/m3 |
| Sawyer Street desanding
facility |
10/18/04 |
47
ng/m3 |
| Sawyer Street desanding
facility |
10/18/04 |
48
ng/m3 |
| Sawyer Street desanding
facility |
10/18/04 |
66
ng/m3 |
| North Terminal dewatering
facility |
10/18/04 |
17
ng/m3 |
| North Terminal dewatering
facility |
10/18/04 |
74
ng/m3 |
| North Terminal dewatering
facility |
10/18/04 |
100
ng/m3 |
| * Airborne
PCB concentration (in billionths of grams per cubic
meter of air, or ng/m3) |
|