Massachusetts
EPA New England Issued Permits

This page contains information on EPA New England issued individual facility-specific permits and general permits that cover multiple facilities within a specific category and geographic area. Please note that storm water permit information is available at our Storm Water Topics Page.

In Massachusetts NPDES permits are issued by EPA New England. Below you will find permits listed in the following categories

To view attachments common to many permits use the "EPA Permit Forms & Attachments" link in the left hand navigation.

Specific individual permits may include additional attachments and supporting documentation that are not available electronically. As required by law, EPA maintains an administrative record for each permit it issues at our regional office. To view the administrative record (the legally binding hard copy of the permit) or to obtain hard copies of additional attachments for a specific permit please contact:

Olga Vergara (vergara.olga@epa.gov)
(617) 918-1519

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.

Permits of Interest

40 CFR Parts 9, 122, and 412 Revised National Pollutant Discharge Elimination System Permit Regulation and Effluent Limitations Guidelines for Concentrated Animal Feeding Operations in Response to the Waterkeeper Decision; Final Rule (PDF) (70 pp, 1.3MB)

Brayton Point Station Final NPDES Permit

Chelsea River (Creek) Bulk Petroleum Storage Facilities Final NPDES Permits

General Electric, Pittsfield Mass., Draft NPDES Permit

Logan International Airport Final NPDES Permit

Mirant Canal Station Final NPDES Permit

Mirant Kendall Station Final NPDES Permit

MWRA Permit

MWRA Outfall Monitoring

Offshore Deepwater Liquified Natural Gas (LNG) Ports

Worcester Municipal Separate Storm Sewer System (MS4)

Top of Page


Final-issuance General Permits

Construction Dewatering

Noncontact Cooling Water General Permit (NCCWGP)

POTW General Permit

Reject Water from Reverse Osmosis Units (PDF) (50 pp, 99K)

Remediation & Miscellaneous Contaminated Sites General Permit (RGP)

Storm Water Discharges from Small Municipal Separate Storm Sewer Systems (MS4s) (PDF) (56 pp, 264K)

Potable Water Treatment Facility General Permit (PWTF GP)

Top of Page


Draft General Permits

Hydroelectric Generating Facilities

The Notice of Availability of the draft NPDES General Permit for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) was published in the Federal Register on November 28, 2003 (see 68 Fed. Reg. 66826). The public comment period closed on January 16, 2004. EPA New England is reviewing and evaluating all the public comments and is working on a final permit decision.

The draft general permit is for specific discharges at hydroelectric generating facilities located in Massachusetts and New Hampshire and Indian Country lands in Massachusetts. These discharges are equipment cooling water, equipment and floor drain water, equipment backwash water, and specific equipment maintenance waters. The permit establishes notice of intent requirements, effluent limitations, standards, prohibitions, and best management practices. The river flow over the dam or through the turbines is not regulated by the general permit.

The EPA contact is Bill Wandle (wandle.bill@epa.gov or 617-918-1605).

Top of Page

Serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont, & Tribal Nations