Status Report for the Week of February 4, 2008
TECHNICAL ASSISTANCE
Technical Assistance to Region V: On January 17, 2008, Dr. John Wilson
(GWERD) provided RPM William Ryan with review comments on a contingent
remedial work plan for the Bendix Superfund Site in St. Joseph, MI. A
number of issues were discussed in detail including sample collection
within a slotted auger, well specifications and construction, and
decontamination procedures for equipment as well as drilling fluids and
purge water. Suggestions were also offered concerning the monitoring
program, specifically with regard to sampling frequency and those wells
which are proposed for removal from the long-term monitoring schedule.
In general, the work plan was found to be technically sound.
(08-R05-001)
(J. Wilson(GWERD)580-436-8543)
Technical Assistance to Region IX: In a continuing technical assistance
effort at the Montrose Superfund Site in Torrence, CA, Dr. Eva Davis
(GWERD) provided RPM Jeff Dhont with a clarification of information
presented by Montrose during the meeting held November 14-15, 2007, in
San Francisco, CA. In the memo of January 29, 2008, Dr. Davis discussed
the viability of steam injection and listed sites where the technology
has been successfully used. In addition to commenting on the
presentation of thermal case studies, the extrapolation of
two-dimensional laboratory experiments to field conditions was discussed
along with a review of the pertinent literature.
(95-R09-015)
(E. Davis(GWERD)580-436-8548)
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)