Status Report for the Week of February 4, 2008

TECHNICAL ASSISTANCE

Technical Assistance to Region V: On January 17, 2008, Dr. John Wilson (GWERD) provided RPM William Ryan with review comments on a contingent remedial work plan for the Bendix Superfund Site in St. Joseph, MI. A number of issues were discussed in detail including sample collection within a slotted auger, well specifications and construction, and decontamination procedures for equipment as well as drilling fluids and purge water. Suggestions were also offered concerning the monitoring program, specifically with regard to sampling frequency and those wells which are proposed for removal from the long-term monitoring schedule. In general, the work plan was found to be technically sound. (08-R05-001)
(J. Wilson(GWERD)580-436-8543)

Technical Assistance to Region IX: In a continuing technical assistance effort at the Montrose Superfund Site in Torrence, CA, Dr. Eva Davis (GWERD) provided RPM Jeff Dhont with a clarification of information presented by Montrose during the meeting held November 14-15, 2007, in San Francisco, CA. In the memo of January 29, 2008, Dr. Davis discussed the viability of steam injection and listed sites where the technology has been successfully used. In addition to commenting on the presentation of thermal case studies, the extrapolation of two-dimensional laboratory experiments to field conditions was discussed along with a review of the pertinent literature. (95-R09-015)
(E. Davis(GWERD)580-436-8548)


Local Navigation


Jump to main content.