On-Plant Consolidation Areas

Jump to Report Index
 
map
 

Hill 78 Consolidation Area
This approximately 6-acre area currently rises approximately 15 feet above grade, and is located near the center of the GE facility. This area includes the former Hill 78 landfill, which was originally created in the early 1940s as an on-site disposal area for excavated soils generated within the GE facility and was capped in 1991 with a geotextile layer and either one foot of crushed stone or soil. This area will be utilized as an on-plant consolidation area for certain materials excavated or otherwise removed as part of various Removal Actions at the Pittsfield/Housatonic River Site.

Building 71 Consolidation Area
This approximately 5-acre area is also located within the central portion of the GE facility. It is located immediately to the east of the Hill 78 Consolidation Area. With the exception of the Building 71, this area is unpaved and is generally bounded by paved parking areas to the north and east, by the Hill 78 Consolidation Area to the west, and U.S. Generating Company facilities to the south. This area will be utilized as an on-plant consolidation area for certain materials excavated or otherwise removed as part of various Removal Actions at the Pittsfield/Housatonic River Site.

Serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont, & Tribal Nations


Local Navigation


Jump to main content.