Chelsea Sandwich, LLC (MA0003280)
The
Chelsea Sandwich facility, which is located in Chelsea, Massachusetts,
is engaged in the receipt, storage, and distribution of petroleum
products. The spectrum of fuels handled by this facility consists
of distillate (e.g., diesel, kerosene, and No.2 Fuel Oil) and residual
products (e.g., No.6 Fuel Oil) as well as various product additives.
Petroleum products are received in bulk quantities at the terminal’s
marine vessel dock. Product is then transferred to aboveground
storage tanks located within the facility’s two tank farm
areas. Final distribution of product is conducted primarily at
the facility’s truck loading rack and on occasion at the
vessel dock when product is shipped off-site. The NPDES discharge
consists of: 1) treated storm water runoff from pervious and impervious
areas at the facility including the tank farm and loading rack;
2) ground water undergoing treatment as a result of a previous
fuel oil spill; 3) a small volume of boiler blow-down water; and
4) occasionally water used for the hydrostatic testing of repaired
tanks. The storm water, boiler blow-down, and hydrostatic test
water discharges are to the Chelsea River through Outfall 001.
This permit also establishes an internal waste stream (Outfall
002) which will discharge treated ground water into the storm water
conveyance system upstream of Outfall 001.
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.
Chelsea Sandwich, LLC Final Permit (15 pp., 694 KB)
Permit Attachments
- Part II - General Conditions (PDF) (25 pp., 142 KB)
- Chelsea Sandwich Fact Sheet (PDF) (32 pp., 168 KB)
Fact Sheet Attachments:
- Fact Sheet Figure No. 1 - Site Location Map (PDF) (1 p., 236 KB)
- Fact Sheet Figure No. 2 - Terminal Plot Plan (PDF) (1 p., 1.85 MB)
- Fact Sheet Attachment A - Summary of Discharge Monitoring Report (DMR) Results (1998 To 2003) (PDF) (15 pp., 307 KB)
- Fact Sheet Attachment B - Summary of Ground Water Monitoring Date (2003 To 2004)
- November 2003
- November 14 (PDF) (20 pp., 891 KB)
- November 17 (PDF) (24 pp., 993 KB)
- November 19 (PDF) (27 pp., 104 KB)
- December 2003 (PDF) (19 pp., 582 KB)
- March 2004 (PDF) (7 pp., 192 KB)
- April 2004
- Attachment B 1 (PDF) (7 pp., 189 KB)
- Attachment B 2 (PDF) (8 pp., 200 KB)
- May 2004 (PDF) (7 pp., 189 KB)
- June 2004
- June 4 (PDF) (7 pp., 207 KB)
- June 28 (PDF) (25 pp., 719 KB)
- August 2004 (PDF) (8 pp., 195 KB)
- Fact Sheet Attachment C - Summary of Discharge Monitoring Report (DMR) Results (2001 to 2003) for Polynuclear Aromatic Compounds (PDF) (2 pp., 38 KB)
- Fact Sheet Attachment D - Endangered Species List (PDF) (6 pp., 292 KB)
- Fact Sheet Attachment E - Essential Fish Habitat Designation (PDF) (7 pp., 683 KB)
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)