Jump to main content.


Massachusetts
NPDES Draft Permits List

This page features draft NPDES permits. Please note there is a slight lag time from the time a permit is drafted to when we are able to post it on the web site. If you do not see the draft permit that you are looking for, please contact either Shelly Puleo (puleo.shelly@epa.gov or (617) 918-1545) or Olga Vergara (vergara.olga@epa.gov or (617) 918-1519), and they will send you a copy of the draft permit.

To view attachments common to many permits use the "EPA Permit Forms & Attachments" link in the left hand navigation.

Notes:
POTW = publicly owned treatment works facility
WPCF = water pollution control facility
WWTF = wastewater treatment facility
WWTP = wastewater treatment plant

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.

Comment Period Dates City - Town (Watershed) Facility Name
12/10/09 - 01/08/10 Everett Exxon Mobil Everett Terminal (PDF) (15 pp, 185K)
10/16/09 – 11/14/09 West Groton Hollingsworth & Vose Company (PDF) (6 pp, 103K)
9/23/09 – 10/22/09 Turner Falls Australis Aquaculture, LLC (PDF) (11 pp, 128K)
9/22/09 – 10/21/09 Amesbury Town of Amesbury Water Pollution Abatement Facility (PDF) (12 pp, 47K)
9/16/09 – 10/15/09 Pittsfield Pittsfield Sand and Gravel (PDF) (11 pp, 81K)
8/31/09 – 9/29/09 Westborough Westborough WWTP MODIFICATION (PDF) (2 pp, 12K)
8/25/09 – 9/23/09 Weston Pine Brook Country Club (PDF) (9 pp, 999K)
7/24/09 – 8/22/09 Cambridge City of Cambridge – Combined Sewer Overflows (PDF) (27 pp, 879K)
7/21/09 – 8/19/09 Worcester St. Gobain Abrasives, Inc. and St. Gobain Ceramics and Plastics, Inc. (PDF) (13 pp, 140K)
7/22/09 - 8/20/09
(Extended: 8/20/09 - 9/21/09)
Fitchburg Fitchburg East WTF (PDF) (20 pp, 1.39MB)
Extension of Public Notice (PDF) (2 pp, 72K)
7/16/09 – 8/14/09 Quincy Twin River Technologies US Inc. (PDF) (13 pp, 97K)
7/15/09 – 8/13/09 Billerica Entegris, Inc. (PDF) (5 pp, 21K)
7/10/09 – 8/18/09 Russell Russell Biomass, LLC (PDF) (23 pp, 98K)
6/19/09 – 7/18/09 Hull Hull WPCF (PDF) (10 pp, 942K)
5/28/09 – 6/27/09 Cambridge Shire Human Genetics Therapies, Inc. (PDF) (24 pp, 1.4MB)
5/20/09 – 6/18/09 Rockport Town of Rockport WWTP (PDF) (13 pp, 505K)
5/12/09 – 6/10/09 Saugus Wheelabrator Saugus, Inc. (PDF) (11 pp, 39K)
4/29/09 – 5/28/09 Dartmouth Town of Dartmouth WWTF (12 pp, 518K)
4/14/09 – 5/13/09 Dennis Aquacultural Research Corporation (PDF) (20 pp, 991K)
2/24/09 – 3/25/09 Allston Genzyme Corporation (PDF) (5 pp, 21K)
2/19/09 – 3/20/09 Mass Bay Neptune Deepwater Port (Permit Mod.) (PDF) (22 pp, 1.2MB)
1/30/09 – 2/28/09 Millbury Upper Blackstone Pollution Abatement District (MODIFICATION) (PDF) (2 pp, 45K)
1/6/09 - 2/4/09 Baldwinville Seaman Paper Company of MA (PDF) (13 pp, 104K)
12/12/08 - 1/15/09
(Extended to 1/29/09)
Sandwich Mirant Canal, LLC (PDF) (22 pp, 60K)
9/25/08 - 10/24/08 Lowell Lowell Cogeneration Company L.P. (PDF) (10 pp, 39K)
8/25/08 - 9/23/08 Braintree Potter Station (PDF) (10 pp, 83K)
7/3/08 - 8/1/08 Medway Charles River Pollution Control District (PDF) (14 pp, 61K)
9/29/08 - 10/14/08 Worcester City of Worcester
4/1/08 - 4/30/08 Northampton City of Northampton WWTP (PDF) (15 pp, 107K)
3/27/08 - 4/25/08 (Extended to 6/6/08) Salem South Essex WWTF (PDF) (13 pp, 154K)
3/25/08 - 4/23/08 Northfield Town of Northfield WWTF (PDF) (13 pp, 129K)
3/10/08 - 4/17/08 Cambridge Mirant Kendall LLC (PDF) (41 pp, 162K)
2/23/07 - 3/24/07 Taunton Taunton WWTP (PDF) (17 pp, 229K)
2/14/07 - 3/15/07 Boston Boston Water and Sewer Commission (MODIFICATION) (PDF) (6 pp, 395K)
8/18/06 - 9/16/06 Hadley Amherst WWTF (PDF) (11 pp, 185K)
7/25/06 - 9/8/06 Boston Massachusetts Port Authority and the Co-Permittees of Logan International Airport (PDF) (48 pp, 415K)
3/3/06 - 4/28/06 Norfolk MCI-Norfolk WPCF (PDF) (2 pp, 2K)

Other Draft Permit Lists

Serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont, & Tribal Nations


Local Navigation


Jump to main content.