Funding Resources
Funding Resources
| OH Net Metering Standards | |
|---|---|
| Type of Incentive | Net Metering |
| Eligible States | OH |
| Eligible Utility | All electric dist utilities and competitive retail electric service providers |
| Eligible Technology | Fuel Cell, Microturbine, Other |
| Eligible Fuel | Biogas, Biomass, Other |
| Eligible Project Size | No limit specified |
| Critical Information | Eligible Renewable/Other Technologies: Solar Thermal Electric, Photovoltaics, Landfill Gas, Wind, Biomass, Hydroelectric, Fuel Cells, Microturbines. System Size Limit: No limit specified (system must be sized to match some or all of customer's load). Overall Enrollment Limit: none. Net Excess: Credited at utility's unbundled generation rate to customer's next bill; customer may request refund of NEG credits accumulated over a 12-month period. |
| Start Date | 7/6/1999 |
| End Date |
|
| Minimum Efficiency (%) |
|
| Additional Information | Net-metered systems must meet safety standards specified by the National Electrical Code (NEC), the Institute of Electrical and Electronics Engineers (IEEE), and Underwriters Laboratories (UL). Utilities may not require customer-generators to comply with additional safety and performance standards. |
| Web Site |
http://www.puco.ohio.gov/ PUCO/Consumer/Information.cfm?id=8510![]() |
| Additional Web Site |
http://www.dsireusa.org/library/includes/ incentive2.cfm?Incentive_Code=OH02R&state=OH&CurrentPageID=1&RE=1&EE=1 ![]() |
| Primary Contact |
Jon Whitis 180 East Broad Street Columbus, OH 43215-3793 U.S.A. Jon Whitis (jon.whitis@puc.state.oh.us) (614) 466-0349 |
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)
