Jump to main content.


Funding Resources

Funding Resources
CT DG Backup Rates
Type of Incentive Utility Rates
Eligible States CT
Eligible Technology Backpressure Turbine, Boiler, Combustion Turbine, Condensing Turbine, Extracting Turbine, Fuel Cell, Microturbine, Other, Reciprocating Engine, Heat Recovery Generator, Stirling Engine
Eligible Fuel # 2 Fuel Oil, # 6 Fuel Oil, Biogas, Biomass, Coal, Hydrogen, LFG, Municipal Solid Waste, Natural Gas, Other, Tire-Derived Fuel, Waste heat Recovery
Eligible Project Size All (MW)
Critical Information Under the capital grant program, the electric cost associated with power used when base load customer-side generation is out of service can be reduced. This is done by eliminating backup rates and demand ratchets for customers who install these projects.
Start Date 3/27/2006
End Date

 

Minimum Efficiency (%)

 

Additional Information Generation that will be interconnected to the distribution system must comply with certain standards. Further, some projects are required to participate in the ISO-NE's Demand Response Programs.
Web Site http://www.state.ct.us/dpuc/dg.htmExit EPA
Additional Web Site http://www.ct.gov/dpuc/cwp/view.asp?a=3356&q=419794Exit EPA
Primary Contact Rita King
157 Church Street
New Haven, CT 06510
U.S.A.
Rita King (rita.king@uinet.com)
(203) 499-2285