Documents
see also Questions & Answers
See also Fact Sheets
EPA documents| Pollution/Situation Reports (Sitreps) | Michigan documents | Enbridge documents
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.
EPA Documents
April 2012
- US EPA letter - Approval, with modifications, of Enbridge's report of findings for background sediment concentrations, investigation for upstream sample areas (PDF) (2pp, 1.0MB) - Apr. 11, 2012
- US EPA letter - Approval, with modifications, of Enbridge's report of findings air monitoring and sampling: August through October 2011 (PDF) (3pp, 971K) - Apr. 11, 2012
February 2012
- US EPA letter - Disapproval of Enbridge's report of findings for background sediment concentrations, investigation for upstream sample areas dated 1/9/2012 (PDF) (6pp, 362K) - Feb. 23, 2012
December 2011
- Full Consolidated Work Plan for Activities through 2012
(376pp, 51.2MB) Dec. 21, 2011
- Report only, no attachments (79pp, 1.7MB) Dec. 21, 2011
- Attachments and images only (297pp, 49.5MB) Dec. 21, 2011
- US EPA letter - Disapproval of Enbridge's Report of Findings for Background Sediment Concentrations, Investigation for Upstream Sample Areas dated 11/19/2011 (PDF) (11pp, 86K) - Dec. 19, 2011
- US EPA letter - Approval, with modifications, of Enbridge's Report of Findings 2011 Air Monitoring and Sampling (PDF) (2pp, 680K) - Dec. 15, 2011
November 2011
- U.S. EPA Letter - Required Modification to Enbridge Energy, Limited Partnership's Oct. 20, 2011 Submittal in response to the Administrative Order issued by U.S. EPA on July 27, 2010 and Supplement to the Administrative Order issued by U.S. EPA on Sep. 23, 2010, pursuant to §311(c) of the Clean Water Act (Docket No. CWA 1321-5-10-001) (PDF) (79pp, 1.31MB) - Nov. 17, 2011
- US EPA letter - Approval with modifications of Enbridge's Revised Response to July 20, 2011 EPA letter Regarding Site Meteorological Data (PDF) (2pp, 351K) Nov. 4, 2011
October 2011
- US EPA letter - Approval with modifications of Enbridge's October 13, 2011 requested modification of the 2011 Air Monitoring and Sampling Addendum dated June 21, 2011 for indefinite suspension of all Community Air Sampling and Monitoring activities, Work Area Monitoring, and elimination of River Opening Sampling (PDF) (2pp, 726K) Oct. 26, 2011
- Enbridge's October 13, 2011 requested modification of the 2011 Air Monitoring and Sampling Addendum dated June 21, 2011 for indefinite suspension of all Community Air Sampling and Monitoring activities, Work Area Monitoring, and elimination of River Opening Sampling (PDF) (27pp, 226K) - Oct. 13, 2011
- U.S. EPA Letter - Modifications to Work Plans for Oil Recovery Activities to be Conducted from Fall 2011 through Fall 2012 and Supplement to the Administrative Order issued by U.S. EPA on Sep. 23, 2010 (PDF) (6pp, 361K) - Oct. 6, 2011
September 2011
- US EPA letter - Approval of Enbridge's September 9, 2011 requested modification of the 2011 Air Monitoring and Sampling Addendum dated June 21, 2011 (Turn-around time) (PDF) (2pp, 570K) - Sep. 20, 2011
- US EPA letter - Approval with modifications of Enbridge's 2011 Odor Investigation Summary Report (PDF) (2pp, 755K) - Sep. 20, 2011
- Enbridge's request for modification of the 2011 Air Monitoring and Sampling Addendum dated June 21, 2011 (Turn-around time) (PDF) (2pp, 43K) - Sep. 9, 2011
August 2011
- U.S. EPA Letter - Directive for Additional Hydrodynamic Assessment (PDF) (8pp, 621K)- Aug. 31, 2011
- U.S. EPA Letter - Private and public drinking water well sampling (PDF) (2pp, 504K) - Aug. 31, 2011
EPA transfers responsibility for directing Enbridge in driinking water well sampling to MDEQ - U.S. EPA Letter -Schedule of Oil Recovery Activities at Overbank Wetland Areas (PDF) (4pp, 281K) Aug. 30, 2011
- U.S. EPA Letter -Notice of Enbridge Failure to Comply with Oil Recovery Directive Deadline for Summer 2011 (PDF) (2pp, 207K) Aug. 30, 2011
- U.S. EPA Letter -Disapproval of Enbridge's July 27, 2011 submittal (PDF) (9pp, 631K) - Aug. 23, 2011
- US EPA letter - Notice of Approval of Enbridge's Quantification of Submerged Oil Work Plan (PDF) (2pp, 590K) - Aug. 12, 2011
- U.S. EPA Letter - Schedule Modification Denial Letter (PDF) (1pg, 473K) - Aug. 3, 2011
- Cover letter extension of response date to July 20 U.S. EPA Notice of potential non-compliance to Enbridge (Air Monitoring and Sampling data) (PDF) (4pp, 696K) - Aug. 2, 2011
- Final Community Involvement Plan, Enbridge Oil Spill Site, Marshall, Michigan (PDF) (55pp, 301K) - July 2011
July 2011
- U.S. EPA Letter – Disapproval of 2011 Summer Strategic Work Plan and Dredging Supplement (PDF) (7pp, 773K) - July 27, 2011
- U.S. EPA Letter – Disapproval of Oil Quantification Plan (PDF) (5pp, 716K) - July 27, 2011
- U.S. EPA Notice of potential non-compliance to Enbridge (Air Monitoring and Sampling data) (PDF) (2pp, 260K) - July 20, 2011
- Approval of Enbridge's July 1, 2011, submittal (Response Management Plan) (PDF) (2pp, 96K) - July 19, 2011
- Directive to modify work plan and quantify submerged oil (PDF) (2pp, 161K) - July 15, 2011
- Enbridge response to U.S. EPA Notice of Potential Non-compliance June 28, 2011 - Inadequate Enbridge Response Management (PDF) (12pp, 199K) - July 1, 2011
June 2011
- Letter: Notice of potential non-compliance in response to the Administrative Order issued by U.S. EPA on July 27, 2010 - inadequate Enbridge response management (PDF) (2pp, 312K) - June 28, 2011
- Notice of EPA determination of Enbridge non-compliance (PDF) (2pp, 467K) - June 27, 2011
U.S. EPA oversight personnel observed and documented the discharge of sediment and oil sheen generated by submerged oil recovery operations in Talmadge Creek to the Kalamazoo River. - Letter: Notice of oil recovery directive for summer 2011 (PDF) (2pp, 345 K) - June 17, 2011
- Letter: Conditional approval of air monitoring and sampling plan (PDF) (4pp, 325K) June 17, 2011
- Letter: Notice of Conditional Approval of Enbridge's May 25, 2011 Request (PDF) (3pp, 310K) - June 17, 2011
- Letter: Approval of Enbridge's June 10, 2011 submittal (PDF) (1pg, 256K) - June 16, 2011
second supplement to the response plan for downstream impacted areas and the source area response plan, commonly referred to as the Work Plan for Supplemental Poling in Morrow Lake - U.S. EPA notice of conditional approval of Enbridge's June 4, 2011 submittal (PDF) (2pp, 180K)
proposed schedule extension for submission of spring 2011 reassessment activities report - June 13, 2011
May 2011
- Letter: Conditional Approval of Enbridge's May 12, 2011 submittal (PDF) (2pp, 383K) - May 18, 2011
Schedule extension for submission of a report documenting reassessment activities performed in spring 2011 - Letter: Conditional approval of Enbridge's Waste Treatment Transportation and Disposal Plan final revision submitted May 13, 2011 (PDF) (3pp, 269K) - May 17, 2011
- Letter: Conditional approval of Enbridge April 28, 2011 submittal and and disapproval of Enbridge May 2, 2011 submittal (PDF) (10pp, 634K) - May 12, 2011
Transfer of Operations from Site A to Frac Tank City and Disapproval of Waste Treatment, Transportation and Disposal Plan - U.S. EPA Notice of Approval of Enbridge's April 29, 2011 submittal (PDF) (1pg, 97K) - May 10, 2011
regarding adverse weather conditions and the associated impact on the Kalamazoo River, and overbank areas targeted for 2011 reassessment activities - Letter: Transmittal of Imagery Data in support of the Enbridge Line 6B MP 608 Pipeline Release, Marshall Michigan (PDF) (1pg, 34K) - May 4, 2011
April 2011
- EPA notice of conditional approval with modifications of Enbridge's March 31 submittal (PDF) (3pp, 248K) - April 5, 2011
March 2011
- Letter: Conditional Approval of the Aerial Imagery Work Plan (PDF) (3pp, 478K) - March 29, 2011
- Letter: Disapproval of Enbridge's Overbank and Poling Reassessment Work Plan Submitted March 14, 2011 (PDF) (4pp, 768K) - March 29, 2011
- Letter: Disapproval of Enbridge's aerial imagery work plan or source area response plan submitted March 14, 2011 (PDF) (5pp, 517K) - March 25, 2011
- Letter: Conditional approval of Enbridge's Feb. 28, 2011 submittal (PDF) (3pp, 286K) - March 3, 2011
Supplement to Operations and Maintenance Work Plan Referred to as 2011 Spring Containment Plan
February 2011
- U.S. EPA Notice of Written Approval of Enbridge's Dec. 10, 2010 Supplement to Operations and Maintenance Work Plan ("Winter Containment Plan") (PDF) (2pp, 106K) - Feb. 10, 2011
December 2010
October 2010
- Slideshow: Enbridge Line 6B Incident (PDF) (63pp, 4.5MB) - presented Oct. 14, 2010
- U.S. EPA Notice of Conditional Approval with Modifications of Enbridge's Sep. 27, 2010, submittal (PDF) (17pp, 204K) - Oct. 5, 2010
- U.S. EPA Notice of Disapproval of Enbridge's Sep. 27, 2010, submittal (PDF) (6pp, 156K) - Oct. 5, 2010
Supplement to source area response plan and supplement to response plan for downstream impacted areas
September 2010
- Supplement to order for compliance under section 311(c) of the Clean Water Act - Docket No. CWA-1321-5-10-001 (PDF) (3pp, 558K) - Sep. 23, 2010
- Testimony of EPA Administrator Lisa P. Jackson before the House Committee on Transportation and Infrastructure : Enbridge Pipeline Oil Spill near Marshall, Michigan (PDF) (6pp, 28K) Sep. 15, 2010
- Slideshow to accompany Administrator Jackson's testimony (PDF) (7pp, 904K) - Sep. 15, 2010
August 2010
- Letter: Supplemental Notice of Required Modifications of Enbridge Energy, Limited Partnership's Response Plan for Downstream Impact Area (PDF) (2pp, 210 K) Aug. 27, 2010
- U.S. EPA Supplemental Notice of Approval With Modifications of Enbridge's Pipeline Repair Workplan, submitted July 27, 2010 (PDF) (2pp, 53K) - Aug. 4, 2010
- U.S. EPA Notice of approval with modifications of Enbridge's Aug. 15, 2010 submission (PDF) (5pp, 57K) - Aug. 17, 2010
- U.S. EPA Notice of Disapproval of Enbridge's Aug. 2, 2010 submittal (Revised Aug. 14, 2010) (PDF) (7pp, 203K) - Aug. 15, 2010 - Sampling and Analysis Plan (SAP) and Quality Assurance Project Plan (QAPP)
- Notice of Disapproval of SAP and QAPP (PDF) (13pp, 213K) Aug. 11, 2010
- Decision Memo: Incident Progress from Emergency to Recovery Phase (PDF) (3pp, 71K) Aug. 10, 2010
- Notice of Disapproval of Source Release Area Remediation Plan - (PDF) (8pp, 158K) Aug. 10, 2010
- Notice of Disapproval of CERCLA Remediation Plan for Downstream Impacted Areas (PDF) (17pp, 812K) Aug. 10, 2010
July 2010
- Notice of Disapproval - Initial Plan Review (PDF) (5pp, 947K) July 31, 2010
- Removal Administrative Order (PDF) (5pp, 171K) July 27, 2010
Pollution/Situation Reports (Sitreps)
- Sitrep 1 (PDF) (5pp, 28K) July 27, 2010
- Sitrep 2 (PDF) (6pp, 30K) July 27, 2010
- Sitrep 3 (PDF) (5pp, 30K) July 28, 2010
- Sitrep 4 (PDF) (7pp, 200K) July 29, 2010
- Sitrep 5 (PDF) (8pp, 77K) July 30, 2010
- Sitrep 6 (PDF) (9pp, 83K) July 31, 2010
- Sitrep 7 (PDF) (9pp, 78K) Aug. 1, 2010
- Sitrep 8 (PDF) (11pp, 151K) Aug. 2, 2010
- Sitrep 9 (PDF) (13pp, 302K) Aug. 3, 2010
- Sitrep 10 (PDF) (12pp, 340K) Aug. 4, 2010
- Sitrep 11 (PDF) (5pp, 240K) Aug. 5, 2010
- Sitrep 12 (PDF) (14pp, 335K) Aug. 6, 2010
- Sitrep 13 (PDF) (14pp, 364K) Aug. 7, 2010
- Sitrep 14 (PDF) (13pp, 480K) Aug. 8, 2010
- Sitrep 15 (PDF) (15pp, 1.12MB) Aug. 9, 2010
- Sitrep 16 (PDF) (15pp, 524K) Aug. 10, 2010
- Sitrep 17 (PDF) (15pp, 555K) Aug. 11, 2010
- Sitrep 18 (PDF) (15pp, 30K) Aug. 12, 2010
- Sitrep 19 (PDF) (5pp, 30K) Aug. 13, 2010
- Sitrep 20 (PDF) (17pp, 1.27MB) Aug. 14, 2010
- Sitrep 21 (PDF) (17pp, 1.1MB) Aug. 15, 2010
- Sitrep 22 (PDF) (17pp, 1.12MB) Aug. 16, 2010
- Sitrep 23 (PDF) (19pp, 1.15MB) Aug. 17, 2010
- Sitrep 24 (PDF) (18pp, 630K) Aug. 18, 2010
- Sitrep 25 (PDF) (17pp, 983K) August 19, 2010
- Sitrep 26 (PDF) (17pp, 2.03MB) Aug. 20, 2010
- Sitrep 27 (PDF) (23pp, 1.54MB) Aug. 21, 2010
- Sitrep 28 (PDF) (23pp, 2.01MB) Aug. 22, 2010
- Sitrep 29 (PDF) (23pp, 1.6MB) Aug. 23, 2010
- Sitrep 30 (PDF) (23pp, 1.55MB) Aug. 24, 2010
- Sitrep 31 (PDF) (23pp, 1.59MB) Aug. 25, 2010
- Sitrep 32 (PDF) (24pp, 1.63MB) Aug. 26, 2010
- Sitrep 33 (PDF) (25pp, 1.68MB) Aug. 27, 2010
- Sitrep 34 (PDF) (25pp, 1.59MB) Aug. 28, 2010
- Sitrep 35 (PDF) (26pp, 1.61MB) Aug. 29, 2010
- Sitrep 36 (PDF) (26pp, 1.25MB) Aug. 30, 2010
- Sitrep 37 (PDF) (26pp, 1.27MB) Aug. 31, 2010
- Sitrep 38 (PDF) (26pp, 902K) Sep. 1, 2010
- Sitrep 39 (PDF) (28pp, 1.01MB) Sep. 2, 2010
- Sitrep 40 (PDF) (28pp, 1.63MB) Sep. 3, 2010
- Sitrep 41 (PDF) (30pp, 1.81MB) Sep. 4, 2010
- Sitrep 42 (PDF) (28pp, 1.88MB) Sep. 5, 2010
- Sitrep 43 (PDF) (34pp, 1.64MB) Sep. 6, 2010
- Sitrep 44 (PDF) (31pp, 1.89MB) Sep. 7, 2010
- Sitrep 45 (PDF) (30pp, 1.86MB) Sep. 8, 2010
- Sitrep 46 (PDF) (30pp, 1.91MB) Sep. 9, 2010
- Sitrep 47 (PDF) (31pp, 1.27MB) Sep. 11, 2010
- Sitrep 48 (PDF) (31pp, 1.59MB) Sep. 12, 2010
- Sitrep 49 (PDF) (30pp, 1.94MB) Sep. 13, 2010
- Sitrep 50 (PDF) (30pp, 2.22MB) Sep. 14, 2010
- Sitrep 51 (PDF) (30pp, 2.04MB) Sep. 15, 2010
- Sitrep 52 (PDF) (20pp, 555K) Sep. 17, 2010
- Sitrep 53 (PDF) (19pp, 353K) Sep. 19, 2010
- Sitrep 54 (PDF) (18pp, 339K) Sep. 21, 2010
- Sitrep 55 (PDF) (18pp, 359K) Sep. 23, 2010
- Sitrep 56 (PDF) (18pp, 877K) Sep. 25, 2010
- Sitrep 57 (PDF) (17pp, 865K) Sep. 27, 2010
- Sitrep 58 (PDF) (16pp, 820K) Sep. 29, 2010
- Sitrep 59 (PDF) (17pp, 1.05MB) Oct. 1, 2010
- Sitrep 60 (PDF) (18pp, 397K) Oct. 3, 2010
- Sitrep 61 (PDF) (19pp, 1.12MB) Oct. 5, 2010
- Sitrep 62 (PDF) (18pp, 1.04MB) Oct. 7, 2010
- Sitrep 63 (PDF) (14pp, 1.51MB) Oct. 9, 2010
- Sitrep 64 (PDF) (14pp, 1.04MB) Oct. 11, 2010
- Sitrep 65 (PDF) (15pp, 1.20MB) Oct. 13, 2010
- Sitrep 66 (PDF) (14pp, 1.09MB) Oct. 15, 2010
- Sitrep 67 (PDF) (14pp, 1.01MB) Oct. 17, 2010
- Sitrep 68 (PDF) (13pp, 1.161MB) Oct. 19, 2010
- Sitrep 69 (PDF) (11pp, 354K) Oct. 21, 2010
- Sitrep 70 (PDF) (11pp, 619K) Oct. 23, 2010
- Sitrep 71 (PDF) (11pp, 595K) Oct. 25, 2010
- Sitrep 72 (PDF) (10pp, 173K) Oct. 27, 2010
- Sitrep 73 (PDF) (10pp, 182K) Nov. 1, 2010
- Sitrep 74 (PDF) (10pp, 286K) Nov. 8, 2010
- Sitrep 75 (PDF) (10pp, 182K) Nov. 15, 2010
- Sitrep 76 (PDF) (10pp, 246K) Nov. 22, 2010
- Sitrep 77 (PDF) (9pp, 286K) Nov. 29, 2010
- Sitrep 78 (PDF) (9pp, 207K) Dec. 7, 2010
- Sitrep 79 (PDF) (9pp, 212K) Dec. 14, 2010
- Sitrep 80 (PDF) (9pp, 212K) Dec. 21, 2010
- Sitrep 81 (PDF) (9pp, 254K) Jan. 12, 2011
- Sitrep 82 (PDF) (9pp, 200K) Jan. 18, 2011
- Sitrep 83 (PDF) (9pp, 425K) Jan. 25, 2011
- Sitrep 84 (PDF) (9pp, 245K) Feb. 1, 2011
- Sitrep 85 (PDF) (10pp, 294K) Feb. 8, 2011
- Sitrep 86 (PDF) (9pp, 237K) Feb. 15, 2011
- Sitrep 87 (PDF) (9pp, 208K) Feb. 22, 2011
- Sitrep 88 (PDF) (9pp, 650K) March 1, 2011
- Sitrep 89 (PDF) (9pp, 191K) March 8, 2011
- Sitrep 90 (PDF) (9pp, 210K) March 15, 2011
- Sitrep 91 (PDF) (9pp, 180K) March 22, 2011
- Sitrep 92 (PDF) (8pp, 1.33MB) March 31, 2011
- Sitrep 93 (PDF) (8pp, 2.59MB) April 5, 2011
- Sitrep 94 (PDF) (8pp, 2.21MB) April 12, 2011
- Sitrep 95 (PDF) (8pp, 2141MB) April 19, 2011
- Sitrep 96 (PDF) (9pp,169K) April 27, 2011
- Sitrep 97 (PDF) (8pp, 233K) May 3, 2011
- Sitrep 98 (PDF) (9pp, 229K) May 10, 2011
- Sitrep 99 (PDF) (10pp, 202K) May 17, 2011
- Sitrep 100 (PDF) (10pp, 178K) May 23, 2011
- Sitrep 101 (PDF) (10pp, 280K) May 30, 2011
- Sitrep 102 (PDF) (10pp, 311K) June 7, 2011
- Sitrep 103 (PDF) (10pp, 278K) June 13, 2011
- Sitrep 104 (PDF) (10pp, 306K) June 20, 2011
- Sitrep 105 (PDF) (12pp, 213K) June 27, 2011
- Sitrep 106 (PDF) (11pp, 217K) July 4, 2011
- Sitrep 107 (PDF) (11pp, 318K) July 12, 2011
- Sitrep 108 (PDF) (10pp, 226K) July 19, 2011
- Sitrep 109 (PDF) (10pp, 226K) July 26, 2011
- Sitrep 110 (PDF) (10pp, 162K) Aug. 3, 2011
- Sitrep 111 (PDF) (10pp, 175K) Aug. 10, 2011
- Sitrep 112 (PDF) (10pp, 161K) Aug. 18, 2011
- Sitrep 113 (PDF) (10pp, 199K) Aug. 24, 2011
- Sitrep 114 (PDF) (11pp, 242K) Aug. 31, 2011
- Sitrep 115 (PDF) (13pp, 1.02MB) Sep. 16, 2011
- Sitrep 116 (PDF) (13pp, 224K) Sep. 23, 2011
- Sitrep 117 (PDF) (13pp,169K) Sep. 30, 2011
- Sitrep 118 (PDF) (12pp, 284K) Oct. 5, 2011
- Sitrep 119 (PDF) (12pp, 227K) Oct. 13, 2011
- Sitrep 120 (PDF) (14pp, 189K) Oct. 20, 2011
- Sitrep 121 (PDF) (14pp, 167K) Oct. 26, 2011
- Sitrep 122 (PDF) (13pp, 268K) Nov. 3, 2011
- Sitrep 123 (PDF) (13pp, 189K) Nov. 9, 2011
- Sitrep 124 (PDF) (12pp, 163K) Nov. 17, 2011
- Sitrep 125 (PDF) (14pp, 187K) Dec. 2, 2011
- Sitrep 126 (PDF) (13pp, 190K) Dec. 14, 2011
- Sitrep 127 (PDF) (12pp, 258K) Dec. 19, 2011
- Sitrep 128 (PDF) (13pp, 227K) Jan. 10, 2012
- Sitrep 129 (PDF) (12pp, 1.34MB) Jan. 19, 2012
- Sitrep 130 (PDF) (12pp, 2.0MB) Jan. 25, 2012
- Sitrep 131 (PDF) (12pp, 1.9MB) Jan. 31, 2012
- Sitrep 132 (PDF) (13pp, 167K) Feb. 9, 2012
- Sitrep 133 (PDF) (13pp, 213K) Feb. 15, 2012
- Sitrep 134 (PDF) (14pp, 207K) Feb. 23, 2012
- Sitrep 135 (PDF) (14pp, 207K) Mar. 5, 2012
- Sitrep 136 (PDF) (14pp, 406K) Mar. 12, 2012
- Sitrep 137 (PDF) (14pp, 204K) Mar. 19, 2012
- Sitrep 138 (PDF) (14pp, 205K) Mar. 23, 2012
- Sitrep 139 (PDF) (14pp, 205K) Apr. 3, 2012
- Sitrep 141 (PDF) (14pp, 170K) Apr. 20, 2012
- Sitrep 142 (PDF) (14pp, 304K) Apr. 25, 2012
- Sitrep 143 (PDF) (14pp, 196K) May 3, 2012
- Sitrep 144 (PDF) (14pp, 376K) May 9, 2012
- Sitrep 145 (PDF) (13pp, 357K) May 179, 2012
- Sitrep 146 (PDF) (13pp, 292K) May 9, 2012
Michigan Documents
Michigan Department of Community Health, Public Health Assessment, Initial Public Comment Release (PDF) (37pp, 355K) August 2011
Enbridge Documents
Correspondence
- Letter to follow up on August deadline concerns (PDF) (2pp, 21K) Aug. 29, 2011 letter about Aug. 31, 2011 oil recovery deadline
- Enbridge status update on Quantification of Submerged Oil Report (PDF) (1pg, 335K) - Aug. 26, 2011
- Response to July 20, 2011 U.S. EPA Letter Regarding Site Meteorological Data (PDF) (202pp, 8.13MB) - Aug. 4, 2011
Workplans
- Consolidated Work Plan for Activities through 2012 (PDF) (316pp, 38MB) Oct. 20, 2011
- 2011 Air monitoring and sampling addendum to the sampling and analysis plan (PDF) (238pp, 4.1MB) - June 21, 2011
- Transfer of Operations from Site A to Frac Tank City (PDF) (7pp, 760K) - Prepared April 18, 2011 - Resubmitted May 13, 2011
- Soil Staging, Decontamination and River Access Site Closure Plan (PDF) (102pp, 27.4MB) - Jan. 11, 2011
Operations and Maintenance
- Operations and Maintenance Work Plan (PDF) (49pp, 2.1MB) - October 2010
A supplement to the Source Area Response Plan and to the Response Plan for Downstream Impacted Areas- Winter Containment Plan (PDF) (8pp, 697K) - Dec. 8, 2010
A supplement to the O & M plan - 2011 Containment Plan (PDF) (17pp, 4.5MB) - March 4, 2011
A supplement to the O & M plan
- Winter Containment Plan (PDF) (8pp, 697K) - Dec. 8, 2010
Sampling and Analysis Plan supplements
- Air Sampling and Monitoring Plan Ceresco Dam Dredging Operations (PDF) (12pp, 486K) - Oct. 7, 2010
- Ceresco Dam River Dredging (PDF) (11pp, 31K) Oct. 7, 2010
- Drinking Water Well Supplement (PDF) (18pp, 66K) - Oct. 7, 2010
- Work Plan for Evaluating the Potential Impact of Released Oil on Groundwater used for Drinking Water (PDF) (22pp, 65K) Oct. 7, 2010
Supplements to the Response Plan for Downstream Impacted Areas and to the Source Area Response Plan
- Supplemental Modification to the Response Plan for Downstream Impact Area (the Plan) Strategy and Tactics for Permanent Recovery of Submerged Oil & Oil-Contaminated Sediment (PDF) (45pp, 3.5 MB) - Sep. 11, 2010
- Work Plan for Permanent Recovery of Submerged Oil and Oil-Contaminated Sediments at Priority Locations and
Ceresco Dam Dredging (PDF) (24pp, 93K) - Oct. 7, 2010
Strategy and Tactics for Permanent Recovery of Submerged Oil & Oil-Contaminated Sediment - Aerial Imagery Work Plan (PDF) (13pp, 566K) March 30, 2011
- Overbank and Polling Reassessment Work Plan (PDF) (73pp, 11.1MB) - Revised April 6, 2011
Evaluation of Potential Impact of Released Oil on Groundwater used for Drinking Water (Hydrogeological Evaluation Report) (PDF) (118pp, 14MB) - Prepared on Oct. 30, 2010
Final Approved Enbridge Work Plans Submitted to EPA - Posted Aug. 19, 2010
- Part 1: Workplan Cover Sheet (PDF) (1p, 254K) Aug. 18, 2010
- Part 2: Health and Safety Plan (PDF) (72pp, 34MB) Aug. 18, 2010
- Part 3: Pipeline Repair Workplan (PDF) (373pp, 33MB) Aug. 18, 2010
- Part 4: Sampling and Analysis Plan (PDF) (228pp, 73MB) Aug. 18, 2010
- Part 5: Quality Assurance Project Plan (PDF) (174pp, 26MB) Aug. 18, 2010
- Part 6: Oil Recovery and Containment Workplan (PDF) (16pp, 12MB) Aug. 18, 2010
- Part 7: Source Area Response Plan (PDF) (207pp, 33MB) Aug. 19, 2010
- Part 8: Response Plan for Downstream Impacted Areas (PDF) (49pp, 20MB) Aug. 18, 2010
- Part 9: Oil Recovery and Oil Debris (PDF) (79pp, 36MB) Aug. 18, 2010
- Part 10: Waste Treatment, Transportation and Disposal Plan (PDF) (28pp, 7.6MB) Aug. 18, 2010
- Part 11: Frac Tank Secondary Containment Plan (PDF) (18pp, 5.45MB) Aug. 18, 2010
Pipeline Backfill Plan - Aug. 17, 2010 (PDF) (14pp, 1.3 MB)
Disapproved Enbridge work plans
EPA is no longer posting disapproved plans after Aug. 5, 2010.
- U.S.Department of Transportation Pipeline and Hazardous Materials Safety Administration (PHMSA) Letter to Enbridge Energy: Restart Plan for Line 6B Disapproved (PDF) (3pp, 131K) - Aug. 9, 2010
- Operational Health and Safety Plan - Aug. 4, 2010 (PDF) (229pp, 68.5MB) and Pipeline Repair Workplan - Aug. 5, 2010 (PDF) (363pp, 72.0MB) - - EPA disapproved these documents; approved versions are above.
- Enbridge Work Plan - July 29, 2010 (PDF) (147pp, 1.2MB) - July 29, 2010 - EPA disapproved this document on July 31, 2010
- Revised response of Enbridge to EPA request for information (PDF) (1pg, 33K) July 29, 2010
- Initial Response of Enbridge Energy Partners, L.P. to Removal Administrative Order (PDF) (3pp, 465K) July 28, 2010