Jump to main content.


EF/ PCS Logo Column Name: FINAL_LIMITS_IND



Description: A facility is considered to be on final effluent limits when the permittee has completed all necessary construction to achieve the ultimate effluent limitation in the permit reflecting secondary treatment, best practicable control technology (BPT), best available technology (BAT), or more stringent limitations, such as state required limitations or water quality based limitations, or less stringent limitations established by a variance or a waiver. Refer to the Office of Water Evaluation Guide f or the complete definition.

Envirofacts Table Name(s):
Data Source:

Properties:

Definition Source: Permit Compliance System Data Element Dictionary, June 2, 1997 Remarks: Refer to table PCS_CODE_DESC, TABLE_ID 310, for codes and descriptions.



Return To:


Local Navigation


Jump to main content.