- Special Waste Home
- Cement Kiln Dust
- Crude Oil and Gas
- Fossil Fuel Combustion
- Mineral Processing
- Mining
Coal Combustion Residuals Impoundment Reports
Highlights
- CCR Impoundment Reports | Frequent Questions
- ICR Responses | Frequent Questions
- March 9, 2009 Coal Ash Information Request Letter
- Additional Information Regarding AEP's Philip Sporn Power Plant in New Haven, WV
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.
As part of the U.S. Environmental Protection Agency’s ongoing national effort to assess the management of coal combustion residuals, EPA is releasing the final contractor reports assessing the structural integrity of impoundments and similar management units containing coal combustion residuals, commonly referred to as “coal ash,” at facilities. Most of the impoundments have a “high” or “significant” hazard potential rating. The hazard potential rating is not related to the stability of those impoundments but to the potential for harm should the impoundment fail. For example, a “significant” hazard potential rating means impoundment failure can cause economic loss, environmental damage, or damage to infrastructure.
EPA has assessed all of the known units with a dam hazard potential rating of “high” or “significant” as reported in the responses provided by electric utilities to EPA's information requests and additional units identified during the field assessments. (EPA has not yet assessed TVA units – these will be done on a separate schedule.) EPA, will release additional reports as they become available. Posted below are the final reports.
The reports being released now have been completed by contractors who are experts in the area of dam integrity, reflect the best professional judgment of the engineering firm, and are signed and stamped by a professional engineer. The reports are based on a visual assessment of the site, interviews with site personnel, and the review of geotechnical reports and studies related to the design, construction and operation of those impoundments, if available. The engineering firms also reviewed past state/federal inspections of the impoundments. EPA contractors were not authorized to conduct any physical drilling, coring or sampling while on site; however, they did review studies which may have included such information. These reports include complex engineering evaluations and use terms which may be unfamiliar to the general public. Also, the contractors were asked to rate the impoundments as “satisfactory,” “fair,” “poor,” or “unsatisfactory,” terms commonly used in the field of dam safety. Expert experience has shown that only impoundments rated as “unsatisfactory” pose immediate safety threats. None of the impoundments assessed received an “unsatisfactory” rating. Impoundment ratings noted in the reports should be taken in the proper context, since a unit may be found to be structurally sound while it may receive a fair or poor rating based on other factors.
Draft copies of these reports have been reviewed by the facilities and the states for factual accuracy and their comments on the draft reports have also been posted. EPA continues to review the reports and the technical recommendations, and is working with the facilities to ensure that the recommendations are implemented.
EPA has provided a copy of the final report to each facility and has requested that the facility implement the recommendations in the reports and provide plans for taking action. Should facilities fail to take sufficient measures, EPA will take additional action, if the circumstances warrant, and will be devoting special attention to those facilities receiving a “poor” rating.
Ratings summary for the assessments:
| First Round | Second Round | |
|---|---|---|
Satisfactory
| 22 |
31 |
Fair
| 15 |
9 |
Poor
| 6 |
0 |
Unsatisfactory
| 0 |
0 |
Total number of units
| 43 |
40 |
Note: Progress Energy has withdrawn their claims of confidential business information (CBI). The CBI claims made by Alabama Power Company, Duke Energy Corporation, First Energy Generation Corporation, Georgia Power Company, Gulf Power Company, and Mississippi Power Company are still under deliberation and have yet to be accepted or denied by the EPA. Until these claims are resolved, the agency has redacted (removed) the following information from the coal ash survey results and survey responses from these companies. References to this information has also been removed in the coal ash reports.
| Company that Claims CBI | Survey Question(s) Claimed Confidential |
|---|---|
| Alabama Power Company | 5, 6, 7, 8 |
| Duke Energy Corporation | 8 |
| First Energy Generation Corporation - Little Blue Run Dam | 8 |
| Georgia Power Company | 5, 6, 7, 8 |
| Gulf Power Company | 5, 8 |
| Mississippi Power Company | 5, 6, 7, 8 |
Reports
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z- Alabama Power Company - William Crawford Gorgas Electric Generating Plant
- Cover Letter (PDF) (3 pp, 874K)
- Comments (PDF) (10 pp, 188K)
- Draft Report (PDF) (67 pp, 18MB)
- Final Report (PDF) (69 pp, 21MB)
- Company Response/Action Plan (PDF) (2 pp, 46K)
- American Electric Power - Cardinal Power Plant
- Cover Letter (PDF) (4 pp, 25K)
- Comments (PDF) (6 pp, 54K)
- Draft Report (PDF) (149 pp, 56MB)
- Final Report (PDF) (149 pp, 55MB)
- American Electric Power - General James Gavin Power Plant
- Cover Letter (PDF) (4 pp, 1.5MB)
- Comments (PDF) (19 pp, 195K)
- Draft Report (PDF) (109 pp, 18MB)
- Final Report (PDF) (111 pp, 19MB)
- Company Response/Action Plan (PDF) (8 pp, 266K)
- American Electric Power - John E Amos Power Plant
- Cover Letter (PDF) (4 pp, 31K)
- Comments (PDF) (2 pp, 22K)
- Draft Report Bottom Ash (PDF) (43 pp, 3MB)
- Final Report Bottom Ash (PDF) (37 pp, 22MB)
- Draft Report Fly Ash (PDF) (35 pp, 2MB)
- Final Report Fly Ash (PDF) (45 pp, 3MB)
- Supplemental Information (PDF) (978 pp, 65MB)
- American Electric Power - Mitchell Power Plant
- Cover Letter (PDF) (3 pp, 20K)
- Comments (PDF) (2 pp, 22K)
- Draft Report (PDF) (160 pp, 35MB)
- Final Report (PDF) (159 pp, 27MB)
- American Electric Power - Mountaineer Power Plant
- Cover Letter (PDF) (3 pp, 21K)
- Comments (PDF) (2 pp, 19K)
- Draft Report (PDF) (39 pp, 7MB)
- Final Report (PDF) (39 pp, 4MB)
- American Electric Power - Philip Sporn Generating Plant
- Additional Information Regarding AEP's Philip Sporn Power Plant in New Haven, West Virginia
- Cover Letter (PDF) (1 pp, 16K)
- Comments (PDF) (7 pp, 91K)
- Draft Report (PDF) (88 pp, 8M)
- Final Report (PDF) (97 pp, 7M)
- AEP Response to Recommendations (PDF) (173 pp, 10M)
- AEP Supplemental information (PDF) (10 pp, 760K)
- Evaluation of AEP Response (PDF) (6 pp, 75K)
- Information Request Letter (PDF) (10 pp, 456K)
- Information Request Letter Modification (PDF) (1 pp, 39K)
- American Electric Power - Tanner Creek Facility
- Cover Letter (PDF) (3 pp, 914K)
- Comments - Bottom Ash and Fly Ash (PDF) (3 pp, 28K)
- Draft Report Bottom Ash (PDF) (40 pp, 27MB)
- Final Report Bottom Ash (PDF) (40 pp, 6MB)
- Draft Report Fly Ash (PDF) (54 pp, 31MB)
- Final Report Fly Ash (PDF) (44 pp, 7MB)
- Company Response/Action Plan (PDF) (2 pp, 290K)
- Arizona Electric Power Coop Inc. - Apache Power Station
- Comments (PDF) (22 pp, 4.5MB)
- Draft Report (PDF) (157 pp, 24MB)
- Final Report (PDF) (159 pp, 24MB)'
- Supplemental Information (PDF) (14 pp, 4MB)
- Arizona Public Service Co. - Cholla Power Station
- Cover Letter (PDF) (4 pp, 23K)
- Comments (PDF) (7 pp, 468K)
- Draft Report (PDF) (167 pp, 29MB)
- Final Report (PDF) (150pp, 28MB)
- Arizona Public Service Co. - Four Corners Power Station
- Cover Letter (PDF) (3 pp, 948K)
- Comments (PDF) (13 pp, 754K)
- Draft Report (PDF) (43 pp, 434K)
- Final Report (PDF) (125 pp, 13MB)
- Company Response/Action Plan (PDF) (4 pp, 119K)
- Big Rivers - Reid/Green/HMPL
- Cover Letter (PDF) (4 pp, 24K)
- Comments (PDF) (7 pp, 110K)
- Draft Report (PDF) (55 pp, 5MB)
- Final Report (PDF) (55 pp, 5MB)
- Duke Energy Carolinas - Allen Steam Station
- Cover Letter (PDF) (3 pp, 856K)
- Comments (PDF) (5 pp, 93K)
- Draft Report (PDF) (68 pp, 3MB)
- Final Report (PDF) (71 pp, 14MB)
- Company Response/Action Plan (PDF) (3 pp, 424K)
- Duke Energy Carolinas - Belews Creek Steam Station
- Cover Letter (PDF) (4pp, 24K)
- Comments (PDF) (6 pp, 283K)
- Draft Report (PDF) (70 pp, 2MB)
- Final Report (PDF) (70 pp, 2MB)
- Duke Energy Carolinas - Buck Steam Station
- Cover Letter (PDF) (7pp, 2MB)
- Comments (PDF) (12 pp, 169K)
- Draft Report (PDF) ( 156 pp, 10MB)
- Final Report (PDF) (158 pp, 10MB)
- Company Response/Action Plan (PDF) (7 pp, 82K)
- Duke Energy Carolinas - Dan River Steam Station
- Cover Letter (PDF) (4 pp, 1MB)
- Comments (PDF) (4 pp, 27K)
- Draft Report (PDF) (111 pp, 31MB)
- Final Report (PDF) (133pp, 42MB)
- Company Response/Action Plan (PDF) (4 pp, 663K)
- Duke Energy Carolinas - Marshall Steam Station
- Cover Letter (PDF) (4 pp, 976K)
- Comments (PDF) (6 pp, 138K)
- Draft Report (PDF) (67 pp, 27MB)
- Final Report (PDF) (68 pp, 25MB)
- Company Response/Action Plan (PDF) (4 pp, 170K)
- Duke Energy Carolinas - Riverbend Power Station
- Cover Letter (PDF) (4 pp, 1MB)
- Comments (PDF) (13 pp, 63)
- Draft Report (PDF) (91 pp, 10MB)
- Final Report Annotation Memo (1 pp, 7K)
- Final Report (PDF) (92 pp, 5MB)
- Company Response/Action Plan (PDF) (5 pp, 125K)
- Dynegy Midwest Generation, Inc.- Havana Power Station
- Cover Letter (PDF) (2 pp, 436K)
- Comments (PDF) (10 pp, 2MB)
- Comments on Final Report (PDF) (1 pg, 25K)
- State Comments (PDF) (5 pp, 13K)
- Draft Report (PDF) (26 pp, 2MB)
- Final Report (PDF) (32 pp, 4MB)
- Final Report Appendices (PDF) (414 pp, 38MB)
- Company Response/Action Plan (PDF) (2 pp, 27K)
- Dynegy Midwest Generation, Inc.- Wood River Power Station
- Cover Letter (PDF) (2 pp, 433K)
- Comments (PDF) (27 pp, 804K)
- Draft Report (PDF) (25 pp, 464K)
- Final Report (PDF) (31 pp, 617K)
- Final Report Appendices (PDF) (666 pp, 66MB)
- Company Response/Action Plan (PDF) (1 pp, 7K)
- E.ON - Louisville Gas & Electric Co. - Mill Creek Station
- Cover Letter (PDF) (4 pp, 23K)
- Comments (6 pp, 104K)
- Draft Report (44 pp, 4MB)
- Final Report(44 pp, 4MB)
- Cover Letter (PDF) (3 pp, 20K)
- Comments (PDF) (1 pp, 14K)
- Draft Report (PDF) (78 pp, 8MB)
- Final Report (PDF) (79 pp, 5MB)
- Supplemental Checklists (PDF) (28 pp, 265K)
- Supplemental Inspections (PDF) (101 pp, 16MB)
- Georgia Power - Plant Bowen
- Cover Letter (PDF) (3 pp, 834K)
- Comments (21 pp, 513K)
- Draft Report (93 pp, 12MB)
- Final Report (59 pp, 3MB)
- Company Response/Action Plan (PDF) (3 pp, 139K)
- Indiana-Kentucky Electric Corp. - Clifty Creek Power Station
- Cover Letter (PDF) (5 pp, 2MB)
- Comments Bottom Ash Pond (PDF) (9 pp, 138K)
- Comments Fly Ash Pond (PDF) (10 pp, 138K)
- Draft Report Bottom Ash Pond (PDF) (60 pp, 8MB)
- Final Report Bottom Ash Pond (PDF) (62 pp, 9MB)
- Draft Report Fly Ash Pond (PDF) (65 pp, 8MB)
- Final Report Fly Ash Pond (PDF) (66 pp, 9MB)
- Company Response/Action Plan (PDF) (5 pp, 80K)
- Louisville Gas and Electric Power - Trimble County Generating Station
- Cover Letter (PDF) (4 pp, 1MB)
- Comments (PDF) (19 pp, 100K)
- Draft Report (PDF) (63 pp, 40MB)
- Final Report (PDF) (63 pp, 9MB)
- Company Response/Action Plan (PDF) (2 pp, 521K)
- Northern States - Sherburne County Power Station
- Cover Letter (PDF) (4 pp, 23K)
- Comments (PDF) (10 pp, 839K)
- Draft Report (PDF) (151 pp, 16MB)
- Final Report (PDF) (149 pp, 9MB)
- PacifiCorp Energy - Jim Bridger Power Station
- Cover Letter (PDF) (4 pp, 1MB)
- Comments (PDF) (9 pp, 418K)
- Draft Report (PDF) (42 pp, 400K)
- Final Report (PDF) (121 pp, 18MB)
- Company Response/Action Plan (PDF) (5 pp, 68K)
- PacifiCorp Energy - Naughton Power Station
- Cover Letter (PDF) (4 pp, 23K)
- Comments (PDF) (9 pp, 116K)
- Draft Report (PDF) (152 pp, 31MB)
- Final Report (PDF) (152 pp, 31MB)
- PPL Montana, LLC - Martins Creek Electric Station
- Cover Letter (PDF) (5 pp, 25K)
- Comments (PDF) (4 pp, 25K)
- Draft Report (PDF) (109 pp, 14MB)
- Final Report (PDF) (109 pp, 28MB)
- Supplemental Information (PDF) (941 pp, 70MB)
- PPL Montana, LLC - Colstrip Steam Electric Station
- Cover Letter (PDF) (5 pp, 2MB)
- Comments (PDF) (21 pp, 4MB)
- Draft Report (PDF) (57 pp, 502K)
- Final Report (PDF) (171 pp, 14MB)
- Company Response/Action Plan (PDF) (35 pp, 157K)
- Progress Energy - Asheville Power Station
- Cover Letter (PDF) (4 pp, 1MB)
- Comments (PDF) (1 pg, 11K)
- Draft Report (PDF) (30 pp, 380K)
- Draft Report Appendices (142 pp, 47MB)
- Final Report (PDF) (36 pp, 565K)
- Final Report Appendices (142 pp, 47MB)
- Company Response/Action Plan (PDF) (4 pp, 104K)
- Progress Energy - Cape Fear Power Station
- Cover Letter (PDF) (5 pp, 2MB)
- Comments (PDF) (16 pp, 1MB)
- Draft Report (PDF) (150 pp, 32MB)
- Final Report (PDF) (152 pp, 33MB)
- Company Response/Action Plan (PDF) (8 pp, 390K)
- Progress Energy - Mayo Power Station
- Cover Letter (PDF) (3 pp, 736K)
- Comments (PDF) (2 pp, 911K)
- Draft Report (PDF) (23 pp, 138K)
- Draft Report Appendices (PDF) (121 pp, 18MB)
- Final Report (PDF) (29 pp, 312K)
- Final Report Appendices (PDF) (127 pp, 18MB)
- Company Response/Action Plan (PDF) (3 pp, 74K)
- Progress Energy - Roxboro Power Station
- Cover Letter (PDF) (3 pp, 21K)
- Comments (PDF) (17 pp, 2MB)
- Draft Report (PDF) (89 pp, 8MB)
- Final Report (PDF) (88 pp, 7MB)
- Supplemental Information (PDF) (29 pp, 316K)
- Cover Letter (PDF) (4 pp, 25K)
- Comments (PDF) (5 pp, 166K)
- Draft Report (PDF) (100 pp, 46MB)
- Final Report (PDF) (109 pp, 47MB)
- Tri-State Generation and Transmission Association Inc. - Escalante Power Station
- Cover Letter (PDF) (2 pp, 494K)
- Comments (PDF) (52 pp, 14MB)
- Draft Report (PDF) (52 pp, 14MB)
- Final Report (PDF) (53 pp, 14MB)
- Company Response/Action Plan (PDF) (1 pp, 7K)
- Vectren - AB Brown Power Station
- Cover Letter (PDF) (4 pp, 1.3MB)
- Comments - Upper and Lower Ash (PDF) (5pp, 606K)
- Draft Report Lower Ash (PDF) (37 pp, 7.8MB)
- Final Report Lower Ash (PDF) (38 pp, 13MB)
- Draft Report Upper Ash (PDF) (35 pp, 16MB)
- Final Report Upper Ash (PDF) (36 pp, 16MB)
- Company Response/Action Plan (PDF) (3 pp, 541K)
- Westar Energy - Jeffrey Energy Center
- Cover Letter (PDF) (5 pp, 1MB)
- Comments (PDF) (49 pp, 992K)
- State Comments (PDF) (2pp, 82K)
- Draft Report (PDF) (47 pp, 452K)
- Final Report (PDF) (116 pp, 10MB)
- Company Response/Action Plan (PDF) (2 pp, 489K)
A
Top of Page | Top of Report Results
B
Top of Page | Top of Report Results
C - no entries
Top of Page | Top of Report Results
D
Top of Page | Top of Report Results
E
Top of Page | Top of Report Results
F
First Energy Generation Corporation - Bruce Mansfield Power PlantTop of Page | Top of Report Results
G
Top of Page | Top of Report Results
H - no entries
Top of Page | Top of Report Results
I
Top of Page | Top of Report Results
J - no entries
Top of Page | Top of Report Results
K - no entries
Top of Page | Top of Report Results
L
Top of Page | Top of Report Results
M - no entries
Top of Page | Top of Report Results
N
Top of Page | Top of Report Results
O - no entries
Top of Page | Top of Report Results
P
Top of Page | Top of Report Results
Q - no entries
Top of Page | Top of Report Results
R - no entries
Top of Page | Top of Report Results
S
Salt River Project - Coronado Power StationTop of Page | Top of Report Results
T
Top of Page | Top of Report Results
U - no entries
Top of Page | Top of Report Results
V
Top of Page | Top of Report Results
W
Top of Page | Top of Report Results
X - no entries
Top of Page | Top of Report Results
Y - no entries
Top of Page | Top of Report Results
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)