Jump to main content.


Federal Facilities National Priorities List (NPL) / Measures

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more. If you need assistance accessing any of the PDFs, please contact Jyl Lapachin at (703) 603-0046 or lapachin.jyl@epa.gov.

On this page


National Priorities List

Federal Facility
NPL Site Locations
Map of EPA's Regions

You can view the different NPL Site locations by region or agency at Federal Facilities National Priorities List (NPL) and Base Realignment and Closure (BRAC) Sites Where You Live.

The National Priorities List (NPL) is a published list of top priority sites among the known releases or threatened releases of hazardous substances, pollutants, or contaminants throughout the United States that are eligible for extensive, long-term clean-up actions under the Superfund program. The NPL is intended primarily to guide the EPA in determining which sites warrant further investigation.

EPA has developed an assessment and scoring system called the Hazard Ranking System (HRS) to evaluate the dangers posed by hazardous waste sites. Information collected during the assessment is used to calculate an HRS score. Sites with a preliminary HRS score of 28.50 or greater may be eligible for listing on the NPL.

Top of page


Federal Facility Program Snapshots

The Fiscal Year 2012 National Priorities List Program Snapshot (PDF) (13 pp, 181K) contains the most recent data regarding federal facilities on the NPL. Check out the Program Snapshots Archive for past data.

NPL Federal Facilities by Agency
(Final and Deleted)

Army: 25% (43); DLA: 3% (5); Air Force: 21% (37); Navy: 31% (54); National Guard: 1% (1); DoE: 12% (21); Other: 6% (11); Corps of Engineers: 1% (1)

*Other Federal Agencies include: Coast Guard (1), DOI (2), DOT (1), EPA (1), FAA (1), NASA (2), SBA (1), USDA (2)
All data from 10/12/2012 CERCLIS 3. NPL cleanup data includes both Superfund and RCRA activity at Superfund Federal Facilities.

Top of page


Federal Facility NPL Program Accomplishments

Action Nationally FY05 Nationally FY06 Nationally FY07 Nationally FY08 Nationally FY09 Nationally FY10 Nationally FY11 Nationally FY 12 Nationally FY 13
Remedial Investigation / Feasibility Study Starts 17 31 37 33 24 52 28 52 41
Decision Documents 113 108 110 92 110 107 90 77 70
Final Record of Decisions 5 6 1 3 4 5 0 2 4
Remedial Action Starts 53 57 49 56 46 39 51 38 40
Remedial Action Completions 57 70 62 58 59 50 59 59 51
Construction Completions 4 8 4 2 4 4 1 1 1
Five-Year Reviews 27 26 32 26 35 28 42 39 28

Top of page


EPA's Strategic Plan

As required by the Government Performance and Results Act (GPRA), EPA has produced the 2011-2015 EPA Strategic Plan. The Plan outlines EPA's mission and long-term goals, describes how EPA programs relate to those goals, and provides a framework for EPA's focus on the results of work. The Federal facilities remedial and reuse program can be found within the Superfund program under "Goal 3: Land Preservation and Restoration."

Top of page


EPA Programmatic & Financial Reports

The EPA Programmatic & Financial Reports describe to Congress, the President, and the public the Agency's performance and its progress in addressing management challenges.

Top of page


Federal Facility ICI Accomplishments

EPA's Office of Solid Waste and Emergency Response (OSWER) in partnership with the Office of Enforcement and Compliance Assurance (OECA) has launched a three-year strategy, the Integrated Cleanup Initiative (ICI or the Initiative), to identify and implement improvements to the Agency's land cleanup programs. The goal of the Initiative is to better use the Agency's land cleanup authorities to accelerate cleanups where possible, address a greater number of contaminated sites, and put these sites back into productive use while protecting human health and the environment. Check out the status of FFRRO's ICI Accomplishments.

Top of page


Superfund Program Implementation Manual (SPIM)

The SPIM defines program-management priorities, procedures, and practices for Superfund, including the Federal facilities program. The SPIM provides a link between the Government Performance and Results Act, EPA's Strategic Plan, and the Superfund program's internal processes for setting priorities, meeting program goals, and tracking performance. The SPIM for Fiscal Year 2012 is now available online.

Top of page


Environmental Indicators

Environmental Indicators are used to measure program performance and communicate tangible progress made in protecting human health and the environment.

Top of page


Construction Completions at NPL Sites

EPA tracks construction completions to simplify its system of categorizing sites and better communicate the successful completion of cleanup activities. In addition, partial deletions help to promote the economic redevelopment of Superfund sites and better communicate the completion of successful partial cleanups.

Top of page


Sitewide Ready for Anticipated Reuse and Cross-Program Revitalization Measure

In 2006, the Federal Facilities Restoration and Reuse Office and the Office of Superfund Remediation and Technology Innovation jointly developed a performance measure, titled Sitewide Ready for Anticipated Reuse (SW RAU), to report the Superfund program’s accomplishments in making land ready for reuse at construction complete sites. This SW RAU measure was developed to comply with EPA's responsibility to report long-term, outcome-based accomplishments under the Government Performance and Results Act. The introduction of this measure also reflects the high priority that EPA places on land reuse and revitalization as an integral part of the Agency’s cleanup mission for the Superfund program, as well as its attention to post-construction activities at NPL sites.

EPA recognized that there was a need to establish a similar, consistent set of measures applied across all of the Office of Solid Waste and Emergency Response cleanup programs to track the efforts the Agency was making in preparing sites to be returned to use. All 10 EPA Regions began collecting information for a set of Cross-Program Revitalization Measure (CPRM) indicators and performance measures in October 2007. This information is updated regularly. There are no annual targets in place for the CPRM performance measures at this time.

Top of page


FY 2008 Program Evaluation

FFRRO recently underwent a program evaluation designed to address two key areas of concern:

  1. Identify potential reasons why certain site cleanup milestone targets are not met under current planning and implementation processes;
  2. Identify processes/recommendations that regions can put in place to more effectively establish and meet targets.

An Evaluation of Planning and Data Processes for Cleanup Milestones for the Federal Facilities Response Program: Final Report (PDF) (99 pp, 587K)

Top of page

Web page maintained by the Federal Facilities Restoration and Reuse Office
Send comments to: comments_ffrro@epa.gov


Local Navigation


Jump to main content.