Approval and Promulgation of Implementation Plans; Georgia: Approval of Revisions to the Georgia State Implementation Plan
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: July 11, 2002 (Volume 67, Number 133)]
[Proposed Rules]
[Page 45947-45948]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr11jy02-21]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[GA-49-200232(b); FRL-7244-8]
Approval and Promulgation of Implementation Plans; Georgia:
Approval of Revisions to the Georgia State Implementation Plan
AGENCY: Environmental Protection Agency (EPA).
ACTION: Proposed rule.
-----------------------------------------------------------------------
SUMMARY: The EPA is proposing to approve the State Implementation Plan
(SIP) revision submitted by the State of Georgia through the Georgia
Environmental Protection Division (GAEPD) on November 17, 1999. The
revision pertains to William L. Bonnell's Air Quality Permit. This
permit revision went through a thirty day comment period and was the
subject of a public hearing on September 8, 1999. No comments were
received on the permit revisions. The revised permit became State
effective on October 7, 1999. In the Final Rules section of this
Federal Register, the EPA is approving the State's SIP revisions as a
direct final rule without prior proposal because the Agency views these
as a noncontroversial submittals and anticipates no adverse comments. A
detailed rationale for the approval is set forth in the direct final
rule. If no adverse comments are received in response to this action,
no further activity is contemplated. If EPA receives adverse comments,
the direct final rule will be withdrawn and all public comments
received will be addressed in a subsequent final rule based on this
proposed rule. The EPA will not institute a second comment period on
this document. Any parties interested in
[[Page 45948]]
commenting on this document should do so at this time.
DATES: Written comments must be received on or before August 12, 2002.
ADDRESSES: All comments should be addressed to: Scott M. Martin at the
EPA, Region 4 Air Planning Branch, 61 Forsyth Street, SW, Atlanta,
Georgia 30303-8960.
Copies of the State submittal are available at the following
addresses for inspection during normal business hours:
Environmental Protection Agency, Region 4, Air Planning Branch, 61
Forsyth Street, SW, Atlanta, Georgia 30303-8960.
Air Protection Branch, Georgia Environmental Protection Division,
Georgia Department of Natural Resources, 4244 International Parkway,
Suite 120, Atlanta, Georgia 30354. Telephone (404) 363-7000.
FOR FURTHER INFORMATION CONTACT: Scott Martin at (404) 562-9036. E-
mail: martin.scott@epa.gov.
SUPPLEMENTARY INFORMATION: For additional information see the direct
final rule which is published in the Rules section of this Federal
Register.
Dated: June 28, 2002.
Winston A. Smith,
Acting Regional Administrator, Region 4.
[FR Doc. 02-17456 Filed 7-10-02; 8:45 am]
BILLING CODE 6560-50-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)