Clean Air Act Interim Approval of the Alternate Permit Program; Territory of Guam
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: January 9, 2003 (Volume 68, Number 6)]
[Rules and Regulations]
[Page 1162-1167]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09ja03-7]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 69
[GU02-01; FRL-7433-5]
Clean Air Act Interim Approval of the Alternate Permit Program;
Territory of Guam
AGENCY: Environmental Protection Agency (EPA).
ACTION: Direct final rule.
-----------------------------------------------------------------------
SUMMARY: The EPA is taking direct final action to grant interim
approval of the alternate permit program submitted by the Territory of
Guam (Guam). In EPA's November 13, 1996 direct final rule, EPA granted
Guam, as well as owners and operators of certain sources within Guam,
an exemption from Title V requirements on the condition that Guam
promulgate and administer an approved alternative permit program. EPA
granted these conditional exemptions under the authority of section 325
of the Clean Air Act (Act). Interim approval of Guam's alternate permit
program will allow sources to be permitted under an approved alternate
permit program while also requiring Guam to make additional submissions
to fulfill all of the requirements of the conditional exemption.
DATES: The direct final rule for Guam is effective on April 9, 2003
unless adverse
[[Page 1163]]
or critical comments are received by March 10, 2003. If EPA receives
such comments, EPA will publish a timely withdrawal in the Federal
Register informing the public that this rule will not take effect.
ADDRESSES: Mail comments to Gerardo Rios, Chief of the Permits Office
(AIR-3), U.S. Environmental Protection Agency, Region IX, 75 Hawthorne
Street, San Francisco, CA 94105-3901.
Copies of the submitted program and other supporting information
used in evaluating the alternate permit program are available for
inspection during normal business hours at the following location:
Pacific Insular Area Program, U.S. EPA-Region IX (CMD-5), U.S. EPA-
Region IX, 75 Hawthorne Street, San Francisco, California 94105.
FOR FURTHER INFORMATION CONTACT: Ben Machol, EPA Region IX, at (415)
972-3770, (Machol.Ben@epa.gov), Pacific Insular Area Program, or Robert
Baker, at (415) 972-3979, Permits Office, Air Division, at the EPA-
Region IX address listed above.
SUPPLEMENTARY INFORMATION:
I. Background
II. Final Action and Implications
A. Interim Approval of Guam's Exemption Request
B. Expiration and Revocation of the Exemption in 40 CFR 69.13(a)
C. Other Terms of Conditional Exemption Continue Unchanged
D. Interaction of Part 71 and Part 69
III. Administrative Requirements
I. Background
Section 325(a) of the Act authorizes the Administrator of EPA, upon
petition by the Governor, to exempt any person or source or class of
persons in Guam, from any requirement of the Act except for
requirements of section 110 and Part D of subchapter I of the Act
(where necessary to attain and maintain the National Ambient Air
Quality Standards), and section 112. An exemption may be granted if the
Administrator finds that compliance with such requirement is not
feasible or is unreasonable due to unique geographical, meteorological,
or economic factors of such territory, or such other local factors as
the Administrator deems significant.
The Governor of Guam submitted a petition pursuant to section
325(a) of the Act for an exemption from Title V of the Act. Title V
requires states, including Guam, to adopt and submit to EPA a Title V
operating permit program for major sources and certain other stationary
sources. If any state does not adopt an operating permit program, Title
V requires EPA to apply certain sanctions within that area and to
promulgate, administer, and enforce a federal operating permit program
for such area. EPA proposed regulations to implement a federal
operating permit program on April 27, 1995 (60 FR 20804) and
promulgated the final rule on July 1, 1996, at 40 CFR part 71 (61 FR
34202) (part 71). Title V requires that sources located in states that
do not adopt a Title V permitting program obtain a federal operating
permit from the EPA. Guam requested an exemption from the Title V
program, but committed to achieving several of the goals of Title V by
developing an alternate operating permit program.
On November 13, 1996, EPA issued a direct final rule (61 FR 58289),
codified at 40 CFR 69.13 (the conditional exemption) in which EPA
granted the government of Guam an exemption from the requirement to
adopt a Title V program on the condition that Guam adopt and implement
a local alternate operating permit program. EPA also granted owners or
operators of certain sources on Guam a conditional exemption from the
requirement to apply for a federal Title V operating permit under part
71. These certain owners and operators of sources are exempted from
Title V requirements so long as they obtain, by January 13, 2003, an
operating permit under an alternate operating program approved by EPA.
That rulemaking did not waive part 71 permitting requirements for
owners or operators of solid waste incinerators required to obtain a
Title V operating permit under section 129(e) of the Act or of major
sources under section 112 of the Act required to obtain Title V
permits. That rulemaking also does not waive or exempt the government
of Guam, or owners or operators of sources located in Guam, from
complying with all other applicable Clean Air Act provisions.
On January 13, 1999, Guam submitted an alternate permit program,
consisting of Guam's Air Pollution Control Standards and Regulations
(Guam's Regulations), along with supporting documents and authorizing
legislation. Guam's Regulations set forth (1) the requirements for
Guam's proposed alternate permit program, which applies to sources that
would be subject to Title V without the exception provided in the
conditional exemption; and (2) the requirements for Guam's purely local
air permit program, which applies to sources that are not subject to
requirements of Title V of the Act. The entire alternate permit program
was also submitted as a SIP revision, including matters not required to
be submitted as a SIP.
On July 12, 1999, Guam sent a clarifying letter, withdrawing the
SIP submission and setting forth which parts of Guam's Air Pollution
Control Standards and Regulations are to be considered part of the
alternate permit program, and further stating that the SIP revision
would be submitted to EPA after all comments were received from EPA.
II. Final Action and Implications
A. Interim Approval of Guam's Alternate Permit Program
EPA is granting interim approval of the alternate permit program
submitted by Guam. EPA is publishing this rule without prior proposal
because we view this as a noncontroversial amendment and anticipate no
adverse comment. However, in the ``Proposed Rules'' section of today's
Federal Register publication, we are publishing a separate document
that will serve as the proposal to grant interim approval to Guam's
part 69 program if adverse comments are filed. This rule will be
effective on April 9, 2003 without further notice unless we receive
adverse comment by March 10, 2003. If EPA receives adverse comment, we
will publish a timely withdrawal in the Federal Register informing the
public that the rule will not take effect. We will address all public
comments in a subsequent final rule based on the proposed rule. We will
not institute a second comment period on this action. Any parties
interested in commenting must do so at this time.
1. Alternate Permit Program Meets Most, But Not All, of the Conditional
Exemption Requirements
The alternate permit program submitted by Guam meets most of the
requirements of the conditional exemption. The technical support
document contains a more detailed discussion of the criteria and EPA's
evaluation.
(a). Fees
40 CFR 69.13(b)(2) requires that the program shall provide for the
collection of fees from permitted sources or other revenues in an
amount that will pay for the cost of operation of the program, and that
it ensure that funds are used solely to support the program. Guam's
alternate permit program provides for the collection of fees from
permitted sources, in an amount that will pay for the cost of operation
of the program, and it ensures that the funds will be used solely to
support the program activities authorized under Guam's Air Pollution
Control Act. But Guam's alternate
[[Page 1164]]
permit program treats fees in a manner which EPA would not allow under
a Title V program, because a unified fund is established for fees which
are collected under the alternate permit program submitted to EPA
(approved program fees) and fees which are collected under the
completely local air permit program (local air program fees), and money
from this unified fund will be commingled for use on both the approved
program and the local program.
A Title V operating permit program is not allowed to commingle fees
between the Title V program and the non-federal local program because
non-federal local program fees are often used as part of the state
matching grant required to receive federal funds. See the July 21, 1994
Memorandum from Mary D. Nichols, Assistant Administrator for Air and
Radiation, ``Transition to Funding Portions of State and Local Air
Programs with Permit Fees Rather than Federal Grants,'' which can be
found at http://www.epa.gov/ttn/oarpg/t5/memoranda/grantmem.pdf.
The Administrator has exercised her authority under Section 325 of
the Act and granted Guam a conditional exemption from the Title V
requirements. In addition, the Administrator has the authority to waive
the Title V requirement concerning commingled fees because Congress
made different rules for grants and matching fees in ``Insular Areas''
such as Guam, American Samoa, and CNMI. Congress authorized grants to
be consolidated, and for agencies to waive any requirements for
matching funds otherwise required by law to be provided by the Insular
Area involved. See 48 U.S.C. 1469a (2002). More specifically, Congress
authorized the Administrator of EPA to modify the maintenance or level
of effort requirements for assistance grants. See Act August 27, 1986,
Public Law 99-396, section 12(a), 100 Stat. 841.
EPA believes that it is appropriate to allow Guam's consolidated
treatment of funds for the following reasons. The unique situation of
the territories has prompted Congress to allow consolidation of grants
and waiver of matching fund requirements in Insular Territories such as
Guam, in recognition of factors which are relevant here. One purpose of
granting a section 325 conditional exemption was to allow for the
development of a streamlined part 69 program which would be protective
of air quality and designed in a manner appropriate to the unique
conditions of Guam. Guam EPA (GEPA) shall be implementing the 40 CFR
part 69 alternate permit program and the purely local program as a
combined program. Maintaining the federal program separate from the
local activities authorized under Guam's Air Pollution Control Act
would require burdensome recordkeeping and reporting procedures, and
the increased burden would be an unnecessary drain on the resources of
GEPA which would not contribute to better air quality. Most critical,
Guam's law and regulations require that fees collected under the
combined program can only be used to support the program activities
authorized under Guam's Air Pollution Control Act. Taking all of these
factors into consideration, EPA finds that Guam's program, meets the
requirements of 40 CFR 69.13(b)(2).
(b). Scope
EPA notes that Guam's Regulations Section 1102.11 (Variances) is
not part of the approved alternate permit program. Variances are not
available for the part 69 program. We also note that section 1102.11 by
its very terms would not apply to the alternate permit program because
section 1102.11(b) states ``Under no circumstances shall a variance
from any federal regulations or federally enforceable air pollution
control permit terms or conditions be granted.'' All owners or
operators of a source wishing to qualify for the exemption from the
permitting requirements of 40 CFR part 71 must obtain an operating
permit under Guam's approved alternate permit program.
(c). Regular Inspections
40 CFR 69.13(b)(8) requires a system of regular inspections of
permitted sources. Section 1104.13 of Guam's Regulations provides that
sources required to obtain a permit are subject to regular inspections
for compliance. 40 CFR 69.13(b)(8) also requires a system to identify
unpermitted major sources, and guidelines for appropriate responses to
violations. The submission packet by Guam included a program
description discussing inspection, compliance, enforcement and
penalties.
A system of regular inspections requires that Guam provide adequate
inspector staff and training and develop appropriate internal
procedures to inspect all permitted sources. EPA also expects that Guam
will develop appropriate guidelines for responding to violations that
are discovered. EPA will continue to assist Guam by providing guidance
and manuals for inspecting permitted sources. EPA reserves the right to
revoke the exemption in its entirety through rulemaking if Guam does
not provide adequate inspector staff and training and develop
appropriate internal procedures to inspect permitted sources so that it
is adequately administering and enforcing the alternate operating
permit program.
2. Alternate Permit Program Does Not Meet All Requirements
Two key requirements of the conditional exemption were not met by
Guam's submission.
(a). EPA Ability To Reopen for Cause
40 CFR 69.13(b)(10) requires that the program allow EPA to reopen a
permit for cause. If EPA provides Guam with written notice that a
permit must be reopened for cause, Guam must issue a revised permit
within 180 days (including public notice and comment) that sufficiently
addresses EPA's concerns. If Guam fails to issue a permit that resolves
EPA's concerns within 180 days, then EPA will terminate, modify, or
revoke and reissue the permit under part 71 after providing the
permittee and the public with notice and opportunity for comment. The
language in Guam's submission does not match this requirement that Guam
must issue a permit that resolves EPA's concerns within 180 days, or
EPA will terminate, modify or revoke and reissue the permit under part
71.
Section 1104.16 of Guam's Regulations states that EPA has authority
to act under 40 CFR part 71 if EPA lodges an objection concerning GEPA
issuing a permit, permit renewal or permit amendment and that objection
is not resolved within 180 days, but section 1104.16 does not clearly
cover the situation where a permit is reopened and the action is to
terminate or suspend the permit.
Under sections 1104.18(f) and 1104.18(g) of Guam's Regulations, it
can take up to 360 days to terminate, suspend, reopen or amend the
permit in accordance with EPA's objection. Under section 1104.18(f),
GEPA has up to 180 days to submit a proposed determination. Under
section 1104.18(g), if EPA then objects, GEPA has up to 180 additional
days to terminate, suspend, reopen or amend the permit in accordance
with EPA's objection. Further, in the case of termination or suspension
of a permit, sections 1104.18 does not clearly specify that EPA shall
itself have authority to act under part 71. For final approval of the
alternate permit program, section 1104.18 must be amended to conform
with the requirements of 40 CFR 69.13(b)(10).
[[Page 1165]]
(b). SIP Revision
Forty CFR 69.13(c) states that Guam shall no later than March 15,
1999 submit a revision to its SIP that provides that a person shall not
violate a permit condition or term in an operating permit that has been
issued under an EPA approved alternate operating permit program adopted
by Guam pursuant the exemption authorized in 40 CFR 69.13.
Guam submitted a revision to its SIP by the applicable deadline
but, at EPA's request, GEPA issued a clarification letter on July 12,
1999 in which it withdrew the SIP submission. EPA agreed at that time
to defer action on the required SIP language until GEPA received
comments from EPA on the revision. EPA has now provided comments on the
alternate permit program, and Guam can thus proceed in properly
adopting and submitting a SIP revision which meets the requirements of
40 CFR 69.13(c).
(c). Other Changes
Major deficiencies are discussed above. In addition, EPA has
recommended that GEPA take certain steps to clarify the regulatory
language and strengthen the program. The technical support document
contains a more detailed discussion of these recommended changes.
3. Reason for Interim Approval of Program
The alternate operating permit program submitted by Guam meets most
of the requirements of the conditional exemption from Title V
requirements, but the deficiencies discussed above must be corrected
before EPA can grant full approval of the alternate permit program. EPA
is confident that these deficiencies can be corrected by Guam, but
there remains a question of timing. If the owner or operator of any
source has not obtained an operating permit under an alternate
operating permit program approved by EPA for Guam by January 13, 2003,
the exemption for such source shall expire and the source shall become
subject to the permitting requirements of 40 CFR part 71 on that date.
To ensure that there is adequate time to review and issue permit
applications under an EPA-approved program before the January 13, 2003
deadline, EPA has decided to grant interim approval of the program.
This interim approval will allow Guam to simultaneously move forward
with permitting sources while correcting the deficiencies identified
above. If Guam has not corrected the deficiencies in the alternate
permit program within two years, then the interim approval of the
alternate program shall expire and the owner or operators of such
sources shall become subject to the permitting requirements of 40 CFR
part 71 on that date.
B. Expiration and Revocation of the Conditional Exemption in 40 CFR
69.13(a)
The conditional exemption set forth circumstances under which the
exemption shall expire or may be revoked. Those circumstances set forth
in the conditional exemption continue unchanged. Guam's alternate
program, which is receiving interim approval pursuant to today's rule,
will be implemented within the framework of the conditional exemption
as follows:
(1) If Guam does not submit a revised alternate operating permit
program within 18 months of the effective date of this interim
approval, then interim approval of the alternate permit program shall
expire with no further rulemaking and 40 CFR Part 71 shall become
effective for all subject sources in Guam.
(2) If Guam submits revisions within 18 months of the effective
date of this interim approval, the interim approval will continue for
an additional 6 months while EPA reviews the amended program to
determine if it qualifies for full approval. Unless EPA approves the
amended program, the interim approval will expire with no further
rulemaking two years after the effective date of this interim approval.
EPA will approve the amended program and provide notice of the approval
in the Federal Register if the amended program meets all the conditions
of the exemption. In the event that EPA disapproves the program because
the program does not meet the requirements, EPA will revoke the
exemption at 40 CFR 69.13(a)(1) by rulemaking.
C. Other Terms of Conditional Exemption Continue Unchanged
EPA is granting interim approval only to those portions of Guam's
Regulations that are necessary to implement Guam's alternate permit
program, required by the conditional exemption as part of the
exemptions from the Title V program. This approval does not constitute
approval under any other provisions of the Act. Except as provided
herein, all other terms and conditions of the conditional exemption
continue unchanged. The scope of the exemptions set forth in the
conditional exemption continues unchanged. EPA continues to reserve its
authority to revoke or modify the exemptions in whole or in part.
D. Interaction of Part 71 and Part 69
Approval of Guam's program is occurring close to the January 13,
2003 deadline set forth in part 69. As a result, most sources will be
unable to obtain a permit under an EPA approved program by the January
13, 2003 deadline, as required by Sec. 69.13(d)(3). Because the
failure to meet the January 13, 2003 deadline is not, in these cases,
caused by the failure of the applicant to timely submit information
required or requested to process the application, GEPA has asked EPA to
clarify how the provisions of part 71 will be applied to sources which
submit a timely and complete permit application to GEPA but which have
not obtained a permit by January 13, 2003.
(1) Requirements of Guam's program: Guam's program requires that
major sources must submit permit applications within 6 months of the
effective date of Guam's alternate program, PSD sources and NSPS
sources must submit permit applications within 10 months, and NESHAP
and all other sources must submit permit applications within 12 months
of the effective date of Guam's alternate program. See Guam's
Regulations at section 1104.10, and appendix A to section 1104.10.
These deadlines match or exceed the requirements of parts 70 and 71.
See 40 CFR 70.4(b)(11)(i) and 71.5(a)(1)(i). Guam shall approve or deny
the application within twelve months after receipt of a complete
application, although shorter actions times apply in some instances.
See Guam's Regulations at section 1104.6(j). Guam's program requires
action from the regulatory agency that matches or exceeds the
requirements of parts 70 and 71. See 40 CFR 70.4(b)(11)(ii), 71.7(a)(2)
and 71.4(i).
(2) Sources become subject to part 71 on January 13, 2003: Sources
without permits become subject to part 71 on January 13, 2003. Pursuant
to 40 CFR 69.13(d)(3), part 71 requirements will apply to all sources
which do not have permits under an EPA approved program on January 13,
2003. If the owners or operators of a source which was eligible for the
conditional exemption do not have a permit under Guam's approved part
69 program on January 13, 2003, and do not have a part 71 permit, then
they must submit a timely and complete part 71 application to EPA, and
``timely'' means submitted to EPA within 12 months. See 40 CFR
71.5(a)(1).
(3) Approval of part 70 programs results in EPA suspension of part
71 permit issuance: Interim approval of Guam's program should affect
the need
[[Page 1166]]
for sources to obtain part 71 permits. Sources in areas with approved
part 70 programs are not permanently required to submit part 71
applications to EPA. Forty CFR 71.4(l) states that the Administrator
will suspend the issuance of part 71 permits promptly upon publication
of notice of approval of a State or Tribal operating permits program
that meets the requirements of part 70. Forty CFR 71.4(l)(1) states
that the Administrator will continue to administer and enforce part 71
permits until they are replaced by permits issued under the approved
part 70 program. EPA thus suspends issuance of part 71 permits once a
part 70 program is authorized. A program that meets the requirements of
part 70 can be a program with full approval, or a program with interim
approval. Section 71.4(l) states that the Administrator may retain
jurisdiction over the part 71 permits for which the administrative or
judicial review process is not complete and will address this issue in
the notice of state program approval. If the program being granted
interim approval in this action were a part 70 program, then EPA would
suspend the issuance of part 71 permits, and address in the notice of
program approval the issue of part 71 permits for which the
administrative process is not complete.
(4) Interpretation of part 71 regulations in light of the
conditional exemption: EPA believes that the part 71 regulations should
be interpreted in a manner which is consistent with the conditional
exemption granted to Guam under section 325 of the Act. Guam requested
and received a conditional exemption from the need to implement a
program which meets all of the requirements of part 70. Although Guam
is not required to implement a part 70 program, it must have a program
which meets the requirements set forth at 40 CFR 69.13. Furthermore,
while Guam's alternate permit program reflects Guam's unique conditions
and circumstances, it is the functional equivalent of a part 70 permit
program. It is consistent with the regulatory framework therefore, to
consider that Guam's alternate permit program approved in today's rule
``meets the requirements of part 70'' for the purposes of 40 CFR
71.4(l). Accordingly, EPA will suspend the issuance of part 71 permits
for sources which are eligible for the conditional exemption upon
Guam's program being granted interim approval, provided that the owners
and operators of such sources apply for and obtain permits under Guam's
approved operating permit program, in the manner specified below.
(5) Timing and source requirements upon approval of Guam's program.
Owners and operators of sources eligible for the conditional exemption
that become, pursuant to 40 CFR 69.13(d)(3), automatically subject to
part 71 on January 13, 2003 because such source does not have a permit
issued under Guam's EPA-approved permit shall be subject to the
following: (1) Owners/operators of such sources must submit a timely
and complete application to Guam EPA by the applicable deadline
specified in Guam's approved program. (2) Owners/operators of such
sources must obtain a federally enforceable operating permit issued
pursuant to Guam's alternative operating permit program within the time
periods specified by that program.
Owners and operators of sources which under 40 CFR 69.13(d)(3) are
automatically subject to part 71 on January 13, 2003 do not need to
submit a part 71 permit application to EPA so long as they meet all of
the above criteria. Owners and operators of sources which under 40 CFR
69.13(d)(3) are automatically subject to part 71 on January 13, 2003
and which do not meet all of the above criteria remain subject to the
requirement to apply for and obtain a part 71 permit. Owners or
operators of sources excluded from the conditional exemption (see 40
CFR 69.13(a)(4)) remain subject to the requirement to apply for and
obtain a part 71 permit.
III. Administrative Requirements
Under Executive Order 12866, ``Regulatory Planning and Review'' (58
FR 51735, October 4, 1993), this final approval is not a ``significant
regulatory action'' and therefore is not subject to review by the
Office of Management and Budget. Under the Regulatory Flexibility Act
(5 U.S.C. 601 et seq.) the Administrator certifies that this final
approval will not have a significant economic impact on a substantial
number of small entities because it merely approves state law as
meeting federal requirements and imposes no additional requirements
beyond those imposed by state law.
This rule does not contain any unfunded mandates and does not
significantly or uniquely affect small governments, as described in the
Unfunded Mandates Reform Act of 1995 (Public Law 104-4) because it
approves pre-existing requirements under state law and does not impose
any additional enforceable duties beyond that required by state law.
This rule also does not have tribal implications because it will
not have a substantial direct effect on one or more Indian tribes, on
the relationship between the Federal Government and Indian tribes, or
on the distribution of power and responsibilities between the Federal
Government and Indian tribes, as specified by Executive Order 13175,
``Consultation and Coordination with Indian Tribal Governments'' (65 FR
67249, November 9, 2000).
This rule also does not have Federalism implications because it
will not have substantial direct effects on the States, on the
relationship between the national government and the States, or on the
distribution of power and responsibilities among the various levels of
government, as specified in Executive Order 13132, ``Federalism'' (64
FR 43255, August 10, 1999). This rule merely approves existing
requirements under state law, and does not alter the relationship or
the distribution of power and responsibilities between the State and
the Federal government established in the Act.
This final approval also is not subject to Executive Order 13045,
``Protection of Children from Environmental Health Risks and Safety
Risks'' (62 FR 19885, April 23, 1997) or Executive Order 13211,
``Actions Concerning Regulations That Significantly Affect Energy
Supply, Distribution, or Use'' (66 FR 28355 (May 22, 2001)), because it
is not a significant regulatory action under Executive Order 12866.
This action will not impose any collection of information subject to
the provisions of the Paperwork Reduction Act, 44 U.S.C. 3501 et seq.,
other than those previously approved and assigned OMB control number
2060-0243. For additional information concerning these requirements,
see 40 CFR parts 69 and 70. An agency may not conduct or sponsor, and a
person is not required to respond to, a collection of information
unless it displays a currently valid OMB control number.
In reviewing State operating permit programs submitted pursuant to
Title V of the Act, EPA will approve State programs provided that they
meet the requirements of the Act and EPA's regulations codified at 40
CFR part 70 or, in this case, 40 CFR part 69. In this context, in the
absence of a prior existing requirement for the State to use voluntary
consensus standards (VCS), EPA has no authority to disapprove a State
operating permit program for failure to use VCS. It would thus be
inconsistent with applicable law for EPA, when it reviews an operating
permit program, to use VCS in place of a State program that otherwise
satisfies the provisions of the Act. Thus, the requirements of section
12(d) of the National Technology Transfer and
[[Page 1167]]
Advancement Act of 1995 (15 U.S.C. 272 note) do not apply.
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. EPA will submit a report containing this rule and other
required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. A major rule cannot
take effect until 60 days after it is published in the Federal
Register. This action is not a ``major rule'' as defined by 5 U.S.C.
804(2).
Under section 307(b)(1) of the Act, petitions for judicial review
of this action must be filed in the United States Court of Appeals for
the appropriate circuit by March 10, 2003. Filing a petition for
reconsideration by the Administrator of this final rule does not affect
the finality of this rule for the purposes of judicial review nor does
it extend the time within which a petition for judicial review may be
filed, and shall not postpone the effectiveness of such rule or action.
This action may not be challenged later in proceedings to enforce its
requirements. (See section 307(b)(2).)
List of Subjects in 40 CFR Part 69
Environmental protection, Air pollution control, Guam.
Dated: December 17, 2002.
Alexis Strauss,
Acting Regional Administrator, Region 9.
40 CFR part 69 is amended as follows:
PART 69--[AMENDED]
1. The authority citation for part 69 continues to read as follows:
Authority : Sec. 325, Clean Air Act, as amended (42 U.S.C. 7625-
1).
Subpart A--Guam
2. Subpart A is amended by adding Sec. 69.13(f) to read as
follows:
Sec. 69.13 Title V conditional exemption.
* * * * *
(f) Interim approval of alternate permit program.
(1) The following sections of Guam's Air Pollution Control
Standards and Regulations are granted interim approval as Guam's
alternate permit program:
1101.1(a) Administrator
1101.1(d) Air pollutant
1101.1(e) Air pollution
1101.1(i) Air pollution emission source
1101.1(r) CFR
1101.1(s) Clean Air Act
1101.1(t) Commenced
1101.1(v) Compliance Plan
1101.1(aa) Emission
1101.1(cc) Emissions unit
1101.1(ii) Fugitive Emissions
1101.1(jj) GEPA
1101.1(kk) Hazardous air pollutant
1101.1(xx) Owner or operator
1101.1(zz) Permit
1101.1(bbb) Person
1101.1(eee) Potential to emit
1101.1(iii) Regulated air pollutant
1101.1(jjj) Responsible official
1101.1(ooo) Source
1101.1(uuu) USEPA
1101.1(vvv) USEPA Administrator
1102.3 Certification
1102.7 Public Access to Information
1102.9 Prompt Reporting of Deviations
1104.1 Definitions
(a) Administrative Permit Amendment
(b) AP-42
(c) Applicable requirement
(d) Federal oversight source
(e) Insignificant source
(f) Insignificant sources--Type I
(g) Insignificant sources--Type II
(h) Major source
(i) Minor source
(j) Modification
(k) Pollution prevention
(l) Significant modification
(m) Transition period
1104.2 Applicability
1104.3 General conditions for considering applications
1104.4 Holding and transfer of permit
1104.5(a) Cancellation of Air Pollution Control Permit
1104.6 Air Pollution Control Permit Application
1104.7 Duty to Supplement or Correct Permit Applications
1104.8 Compliance Plan
1104.9 Compliance Certification of Air Pollution Emission Sources
1104.10 Transition Period and Deadlines to Submit First Applications
1104.11 Permit Term
1104.12 Permit Content
1104.13 Inspections
1104.14 Federally-Enforceable Permit Terms and Conditions
1104.15 Transmission of Information to USEPA
1104.16 USEPA Oversight
1104.17 Emergency Provision
1104.18 Permit Termination, Suspension, Reopening, and Amendment
1104.19 Public Participation
1104.20 Administrative Permit Amendment
1104.21 General Fee Provisions
1104.22 Air Pollution Control Special Fund
1104.23 Application Fees for Air Pollution Emission Sources
1104.24 Annual Fees for Air Pollution Emission Sources
1104.25 Penalties and Remedies
1106 Standards of Performance for Air Pollution Emission Sources
(2)(i) If Guam does not submit a revised alternate operating permit
program within 18 months of April 9, 2003, then interim approval of the
alternate permit program shall expire with no further rulemaking and 40
CFR part 71 shall become effective for all subject sources in Guam.
(ii) If Guam submits revisions within 18 months of April 9, 2003,
the interim approval will continue for an additional 6 months while EPA
reviews the amended program to determine if it qualifies for full
approval. Unless EPA approves the amended program, the interim approval
will expire with no further rulemaking two years after April 9, 2003.
EPA will approve the amended program and provide notice of the approval
in the Federal Register if the amended program meets all the conditions
of the exemption.
(3) SIP Revision. Guam shall adopt, pursuant to required
procedures, and submit to EPA a revision to Guam's SIP that provides
that a person shall not violate a permit condition or term in an
operating permit that has been issued under an EPA approved alternate
operating permit program adopted by Guam pursuant the exemption
authorized in this Sec. 69.13.
[FR Doc. 03-119 Filed 1-8-03; 8:45 am]
BILLING CODE 6560-50-U