Approval and Promulgation of Air Quality Implementation Plans; Virginia; Update to Materials Incorporated by Reference
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
PDF Version (34 pp, 1807K, About PDF) [Federal Register: July 13, 2009 (Volume 74, Number 132)] [Rules and Regulations] [Page 33332-33365] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr13jy09-6] ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [VA201-5202; FRL-8923-9] Approval and Promulgation of Air Quality Implementation Plans; Virginia; Update to Materials Incorporated by Reference AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule; administrative change. ----------------------------------------------------------------------- SUMMARY: EPA is updating the materials submitted by Virginia that are incorporated by reference (IBR) into the State implementation plan (SIP). The regulations affected by this update have been previously submitted by the Virginia Department of Environmental Quality (DEQ) and approved by EPA. This update affects the SIP materials that are available for public inspection at the National Archives and Records Administration (NARA), the Air and Radiation Docket and Information Center located at EPA Headquarters in Washington, DC, and the Regional Office. DATES: Effective Date: This action is effective July 13, 2009. ADDRESSES: SIP materials which are incorporated by reference into 40 CFR part 52 are available for inspection at the following locations: Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103; the Air and Radiation Docket and Information Center, EPA Headquarters Library, Room Number 3334, EPA West Building, 1301 Constitution Ave. NW., Washington, DC 20460, and the National Archives and Records Administration. If you wish to obtain materials from a docket in the EPA Headquarters Library, please call the Office of Air and Radiation (OAR) Docket/Telephone number: (202) 566-1742; or the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/ federal_register/code_of_federal_regulations/ibr_locations.html. FOR FURTHER INFORMATION CONTACT: Harold A. Frankford, (215) 814-2108 or by e-mail at frankford.harold@epa.gov. SUPPLEMENTARY INFORMATION: I. Background The SIP is a living document which the State revises as necessary to address the unique air pollution problems. Therefore, EPA from time to time must take action on SIP revisions containing new and/or revised regulations to make them part of the SIP. On May 22, 1997 (62 FR 27968), EPA revised the procedures for incorporating by reference Federally-approved SIPs, as a result of consultations between EPA and the Office of the Federal Register (OFR). The description of the revised SIP document, IBR procedures and ``Identification of plan'' format are discussed in further detail in the May 22, 1997 Federal Register document. On April 21, 2000 (65 FR 21315), EPA published a Federal Register action beginning the new IBR procedure for Virginia. On September 8, 2004 (69 FR 54216), November 3, 2005 (70 FR 66769) and July 16, 2007 (72 FR 38920), EPA published updates to the IBR material for Virginia. II. EPA Action In this document, EPA is doing the following: A. Announcing the update to the IBR material as of June 1, 2009. B. Making corrections to the following entries listed in the paragraph 52.2420(c) table, as described below: 1. In the entry 5-20-203, revising the text in the ``Title/ subject'' column. 2. Revising the titles for the following entries: Chapter 40, Part II, Articles 49 and 50. 3. Incorporating the entry for 5-40-1750. 4. In the entry 5-40-1670, reorganizing the text in the ``Title/ subject'' and ``Explanation [former SIP citation]'' columns without making any substantive revisions to the list of SIP-approved definitions. 5. In the entry 5-40-5610, removing the quotation marks from the terms listed in the ``Explanation [former SIP section]'' column. 6. In the entry 5-40-7810, removing the quotation marks from the terms listed in the ``Title/subject'' column. 7. Removing entries 5-80-1835, 5-80-1845, and 5-80-1855, they are designated as ``reserved,'' and contain no text that is incorporated by reference. 8. In the entry 5-80-2130, correcting a typographical error to the text in the ``Title/subject'' column. 9. Correcting the date format in the ``State effective date'' column for the following entries: Chapter 10, section 5-10-20; Chapter 20, section 5-20-203; Chapter 40, Part II, Article 4, section 5-40-300; Article 36, section 5-40-5060; Article 37, section 5-40-5200; Article 41, section 5-40-5700; Article 42, sections 5-40-5700, 5-40-5720, and 5-20-5750; Article 48, section 5-40-6970; Article 49, sections 5-40- 7120, 5-40-7130, 5-40-7140, and 5-40-7210; Article 50, sections 5-40- 7240, 5-40-7270, 5-40-7300, 5-40-7330, and 5-40-7360; Article 53, all sections; and Chapter 230, all sections. C. In the paragraph 52.2420(d) table, correcting the date format in the ``State effective date'' column for the following entries: Columbia Gas Transmission Company-Loudoun County Compressor Station, and Global Stone Chemstone Corporation. D. Making corrections to the following entries listed in the paragraph 52.2420(e) table, as described below: 1. Rearranging the order of entries for ``Documents Incorporated by Reference.'' 2. Correcting the date format in the ``State effective date'' column for the following entries: All nonregulatory and quasi- regulatory entries associated with the Washington 1-hour ozone nonattainment area, and the entry for RACT under the 8-Hour NAAQS (Stafford County). 3. Removing the SIP effective date text in the ``Additional explanation column'' for the entry entitled ``Documents Incorporated by Reference (9 VAC 5-20-21, Paragraphs E.4.a.(21) and (22)).'' EPA has determined that today's rule falls under the ``good cause'' exemption in section 553(b)(3)(B) of the Administrative Procedures Act (APA) which, upon finding ``good cause,'' authorizes agencies to dispense with public participation, and section 553(d)(3) which allows an agency to make a rule effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). Today's rule simply codifies provisions which are already in effect as a matter of law in Federal and approved State programs. Under section 553 of the APA, an agency may find good cause where procedures are ``impractical, unnecessary, or contrary to the public interest.'' Public comment is ``unnecessary'' and ``contrary to the public interest'' since the codification only reflects existing law. Immediate notice in the CFR benefits the public by removing outdated citations and incorrect chart entries. III. Statutory and Executive Order Reviews A. General Requirements Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the [[Page 33333]] provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action: • Is not a ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.); • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.); • Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4); • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999); • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997); • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001); • Is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act; and • Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994). B. Submission to Congress and the Comptroller General The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. This rule is not a ``major rule'' as defined by 5 U.S.C. 804(2). C. Petitions for Judicial Review EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the Virginia SIP compilations had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60-day period for filing such petitions for judicial review for this ``Identification of plan'' reorganization update action for Virginia. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds. Dated: June 11, 2009. William C. Early, Acting Regional Administrator, Region III. • 40 CFR part 52 is amended as follows: PART 52--[AMENDED] • 1. The authority for citation for part 52 continues to read as follows: Authority: 42.U.S.C. 7401 et seq. Subpart VV--Virginia • 2. Section 52.2420 is amended by revising paragraphs (b), (c), (d), and (e) to read as follows: Sec. 52.2420 Identification of plan. * * * * * (b) Incorporation by reference. (1) Material listed as incorporated by reference in paragraphs (c) and (d) was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates on or after June 1, 2009 will be incorporated by reference in the next update to the SIP compilation. (2) EPA Region III certifies that the rules/regulations and source- specific requirements provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations and source-specific requirements which have been approved as part of the State implementation plan as of June 1, 2009. (3) Copies of the materials incorporated by reference may be inspected at the EPA Region III Office at 1650 Arch Street, Philadelphia, PA 19103. For further information, call (215) 814-2108; the EPA, Air and Radiation Docket and Information Center, Room Number 3334, EPA West Building, 1301 Constitution Avenue NW., Washington, DC. 20460. For further information, call (202) 566-1742; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_ regulations/ibr_locations.html. (c) EPA-approved regulations. EPA-Approved Virginia Regulations and Statutes ---------------------------------------------------------------------------------------------------------------- State Explanation State citation Title/subject effective EPA approval date [former SIP date citation] ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 10 General Definitions [Part I] ---------------------------------------------------------------------------------------------------------------- 5-10-10................... General.......... 8/1/02 3/15/04, 69 FR 12074.............. Revised paragraphs A, B, C. [[Page 33334]] 5-10-20................... Terms Defined-- 4/1/96 3/12/97, 62 FR 11334.............. Sec. Definitions of 52.2465(c)(113)( Administrator, i)(B)(1). Federally Enforceable, Implementation Plan, Potential to Emit, State Enforceable, Volatile Organic Compound. 5-10-20................... Terms Defined-- 4/17/95 4/21/00, 65 FR 21315.............. Added Terms-- Department, Virginia Register Act, Revised Terms-- Administrative Process Act, Director (replaces Executive Director), Virginia Air Pollution Control Law. 5-10-20................... Terms Defined 4/17/95 4/21/00, 65 FR 21315.............. 120-01-02. [all other SIP- approved terms not listed above]. 5-10-20................... Terms Defined.... 1/1/98 1/7/03, 68 FR 663................. Terms Added-- Public hearing; Regulations for the Control and Abatement of Air Pollution, Regulation of the Board, These regulations. Terms Revised-- Good Engineering Practice, Person, Volatile organic compound. Terms Deleted (moved to 9 VAC 5-170-20)--Admin istrative Process Act, Air quality maintenance area, Confidential information, Consent agreement, Consent order, Emergency special order, Order, Special order, Variance. 5-10-20................... Terms Defined.... 8/1/02 3/15/04, 69 FR 12074.............. Terms Added: EPA, Initial emissions test, Initial performance test (as corrected 11/ 05/03 and effective 01/01/ 04 in the Commonwealth), Maintenance area. Terms Revised: Affected facility, Delayed compliance order, Excessive concentration, Federally enforceable, Malfunction, Public hearing, Reference method, Reid vapor pressure, Stationary source, True vapor pressure, Vapor pressure, Volatile organic compounds. Terms Removed: Air Quality Maintenance Area. 5-10-20................... Terms Defined.... 5/04/05 8/18/06, 71 FR 47742.............. Definition of ``volatile organic compound''. 5-10-30................... Abbreviations.... 7/1/97 4/21/00, 65 FR 21315.............. Appendix A. ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 20 General Provisions Part I Administrative ---------------------------------------------------------------------------------------------------------------- 5-20-10A.-C............... Applicability.... 4/17/95 4/21/00, 65 FR 21315.............. 120-02-01. 5-20-70................... Circumvention.... 4/17/95 4/21/00, 65 FR 21315.............. 120-02-07. 5-20-80................... Relationship of 4/17/95 4/21/00, 65 FR 21315.............. 120-02-08. state regulations to Federal regulations. 5-20-121.................. Air Quality 7/1/97 4/21/00, 65 FR 21315.............. Appendix S. Program Policies and Procedures. ---------------------------------------------------------------------------------------------------------------- Part II Air Quality Programs ---------------------------------------------------------------------------------------------------------------- 5-20-160.................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-02-31. 5-20-170.................. Control Programs. 4/17/95 4/21/00, 65 FR 21315.............. 120-02-32. 5-20-180.................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-02-34. Control Equipment Maintenance or Malfunction. 5-20-200.................. Air Quality 7/1/97 4/21/00, 65 FR 21315.............. Appendix B. Control Regions (AQCR). 5-20-202.................. Metropolitan 7/1/97 4/21/00, 65 FR 21315.............. Appendix G. Statistical Areas. 5-20-203.................. Air Quality 7/29/08 10/29/08, 73 FR 64210............. Richmond and Maintenance Hampton Roads 8- Areas. Hour Ozone Areas are added. 5-20-204.................. Nonattainment 7/29/08 10/29/08, 73 FR 64210............. Richmond and Areas. Hampton Roads 8- Hour Ozone Areas are deleted. [[Page 33335]] 5-20-205.................. Prevention of 01/01/98, 8/18/06, 71 FR 47744.............. Significant 04/01/98, Deterioration 01/01/99, Areas. 08/25/04 5-20-206.................. Volatile Organic 10/04/06 3/2/07, 72 FR 9441................ Addition of new Compound and Fredericksburg Nitrogen Oxides Area and Emissions expansion of Control Areas. Richmond and Hampton Roads Emission Control Areas. 5-20-220.................. Shutdown of a 4/1/98 6/27/03, 68 FR 38191.............. stationary source. 5-20-230.................. Certification of 4/1/98 6/27/03, 68 FR 38191.............. Documents. ---------------------------------------------------------------------------------------------------------------- VR120, Part II General Provisions ---------------------------------------------------------------------------------------------------------------- VR120-02-02............... Establishment of 2/1/85 2/25/93, 58 FR 11373.............. EPA has informed Regulations and VA that except Orders. for the Appeals rule, these provisions no longer need to be part of the SIP. VA has withdrawn 2/93 and 2/98 revisions to the Appeals rule from SIP review. Last substantive SIP change became State- effective on 8/6/ 79 [Sec. 52.2465(c)(55)]. VR120-02-04............... Hearings and 2/1/85 2/25/93, 58 FR 11373.............. Proceedings. VR120-02-05A.............. Variances--Genera 2/1/85 2/25/93, 58 FR 11373.............. l. VR 2.05(b)................ Variances--Fuel 8/14/75 10/8/80, 45 FR 66792.............. Emergency. VR120-02-09............... Appeals.......... 2/1/85 2/25/93, 58 FR 11373.............. VR120-02-12............... Procedural 2/1/85 2/25/93, 58 FR 11373.............. information and guidance. Appendix E................ Public 2/1/85 2/25/93, 58 FR 11373.............. Participation Guidelines. Appendix F................ Delegation of 2/1/85 2/25/93, 58 FR 11373.............. Authority. ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 30 Ambient Air Quality Standards [Part III] ---------------------------------------------------------------------------------------------------------------- 5-30-10................... General.......... 9/8/04 3/3/06, 71 FR 10842............... 5-30-30................... Sulfur Oxides 9/8/04 3/3/06, 71 FR 10842............... (Sulfur Dioxide). 5-30-40................... Carbon Monoxide.. 9/8/04 3/3/06, 71 FR 10842............... 5-30-50................... Ozone (1-hour)... 9/8/04 3/3/06, 71 FR 10842............... 5-30-55................... Ozone (8-hour)... 9/8/04 3/3/06, 71 FR 10842............... Added Section. 5-30-60................... Particulate 9/8/04 3/3/06, 71 FR 10842............... Matter (PM10). 5-30-65................... Particulate 9/8/04 3/3/06, 71 FR 10842............... Added Section. Matter. 5-30-70................... Nitrogen Dioxide. 9/8/04 3/3/06, 71 FR 10842............... 5-30-80................... Lead............. 9/8/04 3/3/06, 71 FR 10842............... ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 40 Existing Stationary Sources [Part IV] Part I Special Provisions ---------------------------------------------------------------------------------------------------------------- 5-40-10................... Applicability.... 8/1/02 3/15/04, 69 FR 12074.............. 5-40-20 (except paragraph Compliance....... 8/1/02 3/15/04, 69 FR 12074.............. A.4.). 5-40-21................... Compliance 7/1/97 4/21/00, 65 FR 21315.............. Appendix N. Schedules. 5-40-22................... Interpretation of 7/1/97 4/21/00, 65 FR 21315.............. Appendix Q. Emissions Standards Based on Process Weight-Rate Tables. 5-40-30................... Emission Testing. 8/1/02 3/15/04, 69 FR 12074.............. 5-40-40................... Monitoring....... 8/1/02 3/15/04, 69 FR 12074.............. 5-40-41................... Emission 7/1/97 4/21/00, 65 FR 21315.............. Appendix J. Monitoring Procedures for Existing Sources. 5-40-50................... Notification, 8/1/02 3/15/04, 69 FR 12074.............. Records and Reporting. ---------------------------------------------------------------------------------------------------------------- Part II Emission Standards Article 1 Visible Emissions and Fugitive Dust/Emissions (Rule 4-1) ---------------------------------------------------------------------------------------------------------------- 5-40-60................... Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0101. Designation of Affected Facility. 5-40-70................... Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0102. 5-40-80................... Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0103. Visible Emissions. 5-40-90................... Standard for 2/1/03 4/29/05, 70 FR 22263.............. Fugitive Dust/ Emissions. 5-40-100.................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0105. 5-40-110.................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0106. Procedures. 5-40-120.................. Waivers.......... 2/1/03 4/29/05, 70 FR 22263.............. ---------------------------------------------------------------------------------------------------------------- [[Page 33336]] Article 4 Emission Standards for General Process Operations (Rule 4-4) ---------------------------------------------------------------------------------------------------------------- 5-40-240.................. Applicability and 1/2/02 2/28/08, 73 FR 10670.............. Designation of Affected Facility. 5-40-250.................. Definitions...... 1/2/02 2/28//08, 73 FR 10670............. 5-40-260.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0403. Particulate Matter(AQCR 1-6). 5-40-270.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0404. Particulate Matter (AQCR 7). 5-40-280.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0405. Sulfur Dioxide. 5-40-300.................. Standard for 10/4/06 3/2/07, 72 FR 9441................ Volatile Organic Compounds. 5-40-310A.-E.............. Standard for 3/24/04 4/27/05, 70 FR 21625.............. Nitrogen Oxides. 5-40-311.................. Reasonably 1/2/02 2/28/08, 73 FR 10670.............. Removal of available definitions control Combustion unit, technology Fuel burning guidelines for equipment stationary Installation, sources of and Total nitrogen dioxide. capacity in 9 VAC 5-40-311B.3. Exception: 311D. 5-40-320.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0409. Visible Emissions. 5-40-330.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0410. Fugitive Dust/ Emissions. 5-40-360.................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0413. 5-40-370.................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0414. Procedures. 5-40-380.................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0415. 5-40-390.................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0416. Records and Reporting. 5-40-400.................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0417. 5-40-410.................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0418. Control Equipment Maintenance or Malfunction. 5-40-420.................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0419. ---------------------------------------------------------------------------------------------------------------- Article 5 Emission Standards for Synthesized Pharmaceutical Products Manufacturing Operations (Rule 4-5) ---------------------------------------------------------------------------------------------------------------- 5-40-430.................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0501. Designation of Affected Facility. 5-40-440.................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0502. 4-40-450.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0503. Volatile Organic Compounds. 5-40-460.................. Control 2/1/02 3/3/06, 71 FR 10838............... Technology Guidelines. 5-40-470.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0505. Visible Emissions. 5-40-480.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0506. Fugitive Dust/ Emissions. 5-40-510.................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0509. 5-40-520.................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0510. Procedures. 5-40-530.................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0511. 5-40-540.................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0512. Records and Reporting. 5-40-550.................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0513. 5-40-560.................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0514. Control Equipment Maintenance or Malfunction. 5-40-570.................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0515. ---------------------------------------------------------------------------------------------------------------- Article 6 Emission Standards for Rubber Tire Manufacturing Operations (Rule 4-6) ---------------------------------------------------------------------------------------------------------------- 5-40-580.................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0601. Designation of Affected Facility. 5-40-590.................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0602. 5-40-600.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0603. Volatile Organic Compounds. 5-40-610.................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0604. Technology Guidelines. 5-40-620.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0605. Visible Emissions. 5-40-630.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0606. Fugitive Dust/ Emissions. 5-40-660.................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0609. 5-40-670.................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0610. Procedures. 5-40-680.................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0611. 5-40-690.................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0612. Records and Reporting. 5-40-700.................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0613. 5-40-710.................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0614. Control Equipment Maintenance or Malfunction. 5-40-720.................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0615. ---------------------------------------------------------------------------------------------------------------- Article 7 Emission Standards for Incinerators (Rule 4-7) ---------------------------------------------------------------------------------------------------------------- 5-40-730.................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0701. Designation of Affected Facility. 5-40-740.................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0702. [[Page 33337]] 5-40-750.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0703. Particulate Matter. 5-40-760.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0704. Visible Emissions. 5-40-770.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0705. Fugitive Dust/ Emissions. 5-40-800.................. Prohibition of 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0708. Flue-Fed Incinerators. 5-40-810.................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0709. 5-40-820.................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0710. Procedures. 5-40-830.................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0711. 5-40-840.................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0712. Records and Reporting. 5-40-850.................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0713. 5-40-860.................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0714. Control Equipment Maintenance or Malfunction. 5-40-870.................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0715. ---------------------------------------------------------------------------------------------------------------- Article 8 Emission Standards for Fuel Burning Equipment (Rule 4-8) ---------------------------------------------------------------------------------------------------------------- 5-40-880.................. Applicability and 4/1/99 5/31/01, 66 FR 29495.............. Designation of Affected Facility. 5-40-890.................. Definitions...... 4/1/99 5/31/01, 66 FR 29495.............. 5-40-900.................. Standard for 4/1/99 5/31/01, 66 FR 29495.............. Particulate Matter. 5-40-910.................. Emission 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0804. Allocation System. 5-40-920.................. Determination of 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0805. Collection Equipment Efficiency Factor. 5-40-930.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0806. Sulfur Dioxide. 5-40-940.................. Standard for 4/1/99 5/31/01, 66 FR 29495.............. Visible Emissions. 5-40-950.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0808. Fugitive Dust/ Emissions. 5-40-980.................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0811. 5-40-990.................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0812. Procedures. 5-40-1000................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0813. 5-40-1010................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0814. Records and Reporting. 5-40-1020................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0815. 5-40-1030................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0816. Control Equipment Maintenance or Malfunction. 5-40-1040................. Permits.......... 4/1/99 5/31/01, 66 FR 29495.............. ---------------------------------------------------------------------------------------------------------------- Article 9 Emission Standards for Coke Ovens (Rule 4-9) ---------------------------------------------------------------------------------------------------------------- 5-40-1050................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0901. Designation of Affected Facility. 5-40-1060................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0902. 5-40-1070................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0903. Particulate Matter. 5-40-1080................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0904. Sulfur Dioxide. 5-40-1090................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0905. Visible Emissions. 5-40-1100................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0906. Fugitive Dust/ Emissions. 5-40-1130................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0909. 5-40-1140................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0910. Procedures. 5-40-1150................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0911. 5-40-1160................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0912. Records and Reporting. 5-40-1170................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0913. 5-40-1180................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0914. Control Equipment Maintenance or Malfunction. 5-40-1190................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-0915. ---------------------------------------------------------------------------------------------------------------- Article 10 Emission Standards for Asphalt Concrete Plants (Rule 4-10) ---------------------------------------------------------------------------------------------------------------- 5-40-1200................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1001. Designation of Affected Facility. 5-40-1210................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1002. 5-40-1220................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1003. Particulate Matter. 5-40-1230................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1004. Visible Emissions. 5-40-1240................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1005. Fugitive Dust/ Emissions. 5-40-1270................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1008. 5-40-1280................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1009. Procedures. 5-40-1290................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1010. 5-40-1300................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1011. Records and Reporting. 5-40-1310................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1012. 5-40-1320................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1013. Control Equipment Maintenance or Malfunction. 5-40-1330................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1014. ---------------------------------------------------------------------------------------------------------------- [[Page 33338]] Article 11 Emission Standards for Petroleum Refinery Operations (Rule 4-11) ---------------------------------------------------------------------------------------------------------------- 5-40-1340................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1101. Designation of Affected Facility. 5-40-1350................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1102. 5-40-1360................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1103. Particulate Matter. 5-40-1370................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1104. Sulfur Dioxide. 5-40-1390................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1106. Volatile Organic Compounds. 5-40-1400................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1107. Technology Guidelines. 5-40-1410................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1108. Visible Emissions. 5-40-1420................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1109. Fugitive Dust/ Emissions. 5-40-1450................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1112. 5-40-1460................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1113. Procedures. 5-40-1470................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1114. 5-40-1480................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1115. Records and Reporting. 5-40-1490................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1116. 5-40-1500................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1117. Control Equipment Maintenance or Malfunction. 5-40-1510................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1118. ---------------------------------------------------------------------------------------------------------------- Article 12 Emission Standards for Chemical Fertilizer Manufacturing Operations (Rule 4-12) ---------------------------------------------------------------------------------------------------------------- 5-40-1520................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1201. Designation of Affected Facility. 5-40-1530................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1202. 5-40-1540................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1203. Particulate Matter. 5-40-1550................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1204. Visible Emissions. 5-40-1560................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1205. Fugitive Dust/ Emissions. 5-40-1590................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1208. 5-40-1600................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1209. Procedures. 5-40-1610................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1210. 5-40-1620................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1211. Records and Reporting. 5-40-1630................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1212. 5-40-1640................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1213. Control Equipment Maintenance or Malfunction. 5-40-1650................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1214. ---------------------------------------------------------------------------------------------------------------- Article 13 Emission Standards for Kraft Pulp and Paper Mills (Rule 4-13) ---------------------------------------------------------------------------------------------------------------- 5-40-1660................. Applicability and 4/01/99 10/19/07, 72 FR 59207............. Designation of Affected Facility. 5-40-1670................. Definitions of 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1302 cross recovery Remaining furnace, kraft definitions are pulp mill, lime Federally kiln, recovery enforceable as furnace, smelt part of the dissolving tank. Section 111(d) plan for kraft pulp mills (see, Sec. 62.11610). Definitions...... 4/01/99 10/19/07, 72 FR 59207............. Added: Neutral sulfite semichemical pulping operation, New design recovery furnace, Pulp and paper mill, Semichemical pulping process; Straight kraft recovery furnace, Revised: Cross recovery furnace. 5-40-1680................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1303. Particulate Matter. 5-40-1700................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1305. Technology Guidelines. 5-40-1710................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1306. Visible Emissions. 5-40-1720................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1307. Fugitive Dust/ Emissions. 5-40-1750................. Compliance....... 4/01/99 10/19/07, 72 FR 59207............. 5-40-1760................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1311. Procedures. 5-40-1770A................ Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1312A. Note: Sections 5- 40-1770B. and C. are Federally enforceable as part of the Section111(d) plan for kraft pulp mills (see, Sec. 62.11610). 5-40-1780A................ Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1313A. Records and Note: Sections 5- Reporting. 40-1780B. through D. are Federally enforceable as part of the Section 111(d) plan for kraft pulp mills (see, Sec. 62.11610). 5-40-1790................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1314. [[Page 33339]] 5-40-1800................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1315. Control Equipment Maintenance or Malfunction. 5-40-1810................. Permits.......... 4/01/99 10/19/07, 72 FR 59207............. ---------------------------------------------------------------------------------------------------------------- Article 14 Emission Standards for Sand and Gravel Processing Operations and Stone Quarrying and Processing Operations (Rule 4-14) ---------------------------------------------------------------------------------------------------------------- 5-40-1820................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1401. Designation of Affected Facility. 5-40-1830................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1402. 5-40-1840................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1403. Particulate Matter. 5-40-1850................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1404. Visible Emissions. 5-40-1860................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1405. Fugitive Dust/ Emissions. 5-40-1890................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1408. 5-40-1900................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1409. Procedures. 5-40-1910................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1410. 5-40-1920................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1411. Records and Reporting. 5-40-1930................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1412. 5-40-1940................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1413. Control Equipment Maintenance or Malfunction. 5-40-1950................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1414. ---------------------------------------------------------------------------------------------------------------- Article 15 Emission Standards for Coal Preparation Plants (Rule 4-15) ---------------------------------------------------------------------------------------------------------------- 5-40-1960................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1501. Designation of Affected Facility. 5-40-1970................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1502. 5-40-1980................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1503. Particulate Matter. 5-40-1990................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1504. Visible Emissions. 5-40-2000................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1505. Fugitive Dust/ Emissions. 5-40-2030................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1508. 5-40-2040................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1509. Procedures. 5-40-2050................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1510. 5-40-2060................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1511. Records and Reporting. 5-40-2070................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1512. 5-40-2080................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1513. Control Equipment Maintenance or Malfunction. 5-40-2090................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1514. ---------------------------------------------------------------------------------------------------------------- Article 16 Emission Standards for Portland Cement Plants (Rule 4-16) ---------------------------------------------------------------------------------------------------------------- 5-40-2100................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1601. Designation of Affected Facility. 5-40-2110................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1602. 5-40-2120................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1603. Particulate Matter. 5-40-2130................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1604. Sulfur Dioxide. 5-40-2140................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1605. Visible Emissions. 5-40-2150................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1606. Fugitive Dust/ Emissions. 5-40-2180................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1609. 5-40-2190................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1610. Procedures. 5-40-2200................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1611. 5-40-2210................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1612. Records and Reporting. 5-40-2220................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1613. 5-40-2230................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1614. Control Equipment Maintenance or Malfunction. 5-40-2240................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1615. ---------------------------------------------------------------------------------------------------------------- Article 17 Emission Standards for Woodworking Operations (Rule 4-17) ---------------------------------------------------------------------------------------------------------------- 5-40-2250................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1701. Designation of Affected Facility. 5-40-2260................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1702. 5-40-2270................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1703. Particulate Matter. 5-40-2280................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1704. Visible Emissions. 5-40-2290................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1705. Fugitive Dust/ Emissions. 5-40-2320................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1708. 5-40-2330................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1709. Procedures. 5-40-2340................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1710. 5-40-2350................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1711. Records and Reporting. 5-40-2360................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1712. [[Page 33340]] 5-40-2370................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1713. Control Equipment Maintenance or Malfunction. 5-40-2380................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1714. ---------------------------------------------------------------------------------------------------------------- Article 18 Emission Standards for Primary and Secondary Metal Operations (Rule 4-18) ---------------------------------------------------------------------------------------------------------------- 5-40-2390................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1801. Designation of Affected Facility. 5-40-2400................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1802. 5-40-2410................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1803. Particulate Matter. 5-40-2420................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1804. Sulfur Oxides. 5-40-2430................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1805. Visible Emissions. 5-40-2440................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1806. Fugitive Dust/ Emissions. 5-40-2470................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1809. 5-40-2480................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1810. Procedures. 5-40-2490................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1811. 5-40-2500................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1812. Records and Reporting. 5-40-2510................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1813. 5-40-2520................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1814. Control Equipment Maintenance or Malfunction. 5-40-2530................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1815. ---------------------------------------------------------------------------------------------------------------- Article 19 Emission Standards for Lightweight Aggregate Process Operations (Rule 4-19) ---------------------------------------------------------------------------------------------------------------- 5-40-2540................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1901. Designation of Affected Facility. 5-40-2550................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1902. 5-40-2560................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1903. Particulate Matter. 5-40-2570................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1904. Sulfur Oxides. 5-40-2580................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1905. Visible Emissions. 5-40-2590................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1906. Fugitive Dust/ Emissions. 5-40-2620................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1909. 5-40-2630................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1910. Procedures. 5-40-2640................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1911. 5-40-2650................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1912. Records and Reporting. 5-40-2660................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1913. 5-40-2670................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1914. Control Equipment Maintenance or Malfunction. 5-40-2680................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-1915. ---------------------------------------------------------------------------------------------------------------- Article 20 Emission Standards for Feed Manufacturing Operations (Rule 4-20) ---------------------------------------------------------------------------------------------------------------- 5-40-2690................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2001. Designation of Affected Facility. 5-40-2700................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2002. 5-40-2710................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2003. Particulate Matter. 5-40-2720................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2004. Visible Emissions. 5-40-2730................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2005. Fugitive Dust/ Emissions. 5-40-2760................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2008. 5-40-2770................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2009. Procedures. 5-40-2780................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2010. 5-40-2790................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2011. Records and Reporting. 5-40-2800................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2012. 5-40-2810................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2013. Control Equipment Maintenance or Malfunction. 5-40-2820................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2014. ---------------------------------------------------------------------------------------------------------------- Article 21 Emission Standards for Sulfuric Acid Production Plants (Rule 4-21) ---------------------------------------------------------------------------------------------------------------- 5-40-2830................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2101. Designation of Affected Facility. 5-40-2840................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2102. 5-40-2850................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2103. Sulfur Dioxide. 5-40-2870................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2105. Visible Emissions. 5-40-2880................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2106. Fugitive Dust/ Emissions. 5-40-2910................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2109. 5-40-2920................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2110. Procedures. 5-40-2930................. Monitoring....... 2/1/02 3/3/06, 71 FR 10838............... 5-40-2940................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2112. Records and Reporting. 5-40-2950................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2113. [[Page 33341]] 5-40-2960................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2114. Control Equipment Maintenance or Malfunction. 5-40-2970................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2115. ---------------------------------------------------------------------------------------------------------------- Article 22 Emission Standards for Sulfur Recovery Operations (Rule 4-22) ---------------------------------------------------------------------------------------------------------------- 5-40-2980................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2201. Designation of Affected Facility. 5-40-2990................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2202. 5-40-3000................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2203. Sulfur Dioxide. 5-40-3010................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2204. Visible Emissions. 5-40-3020................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2205. Fugitive Dust/ Emissions. 5-40-3050................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2208. 5-40-3060................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2209. Procedures. 5-40-3070................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2210. 5-40-3080................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2211. Records and Reporting. 5-40-3090................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 20-04-2212. 5-40-3100................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2213. Control Equipment Maintenance or Malfunction. 5-40-3110................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2214. ---------------------------------------------------------------------------------------------------------------- Article 23 Emission Standards for Nitric Acid Production Units (Rule 4-23) ---------------------------------------------------------------------------------------------------------------- 5-40-3120................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2301. Designation of Affected Facility. 5-40-3130................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2302. 5-40-3140................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2303. Nitrogen Oxides. 5-40-3150................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2304. Visible Emissions. 5-40-3160................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2305. Fugitive Dust/ Emissions. 5-40-3190................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2308. 5-40-3200................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2309. Procedures. 5-40-3210................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2310. 5-40-3220................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2311. Records and Reporting. 5-40-3230................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2312. 5-40-3240................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2313. Control Equipment Maintenance or Malfunction. 5-40-3250................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2314. ---------------------------------------------------------------------------------------------------------------- Article 24 Emission Standards for Solvent Metal Cleaning Operations Using Non-Halogenated Solvents (Rule 4-24) ---------------------------------------------------------------------------------------------------------------- 5-40-3260................. Applicability and 3/24/04 5/17/05, 70 FR 28215.............. Designation of Affected Facility. 5-40-3270................. Definitions...... 4/1/97 11/3/99, 64 FR 59635.............. 5-40-3280................. Standard for 4/1/97 11/3/99, 64 FR 59635.............. Volatile Organic Compounds. 5-40-3290................. Control 4/1/97 11/3/99, 64 FR 59635.............. Technology Guidelines. 5-40-3300................. Standard for 4/1/97 11/3/99, 64 FR 59635.............. Visible Emissions. 5-40-3310................. Standard for 4/1/97 11/3/99, 64 FR 59635.............. Fugitive Dust/ Emissions. 5-40-3340................. Compliance....... 4/1/97 11/3/99, 64 FR 59635.............. 5-40-3350................. Test Methods and 4/1/97 11/3/99, 64 FR 59635.............. Procedures. 5-40-3360................. Monitoring....... 4/1/97 11/3/99, 64 FR 59635.............. 5-40-3370................. Notification, 4/1/97 11/3/99, 64 FR 59635.............. Records and Reporting. 5-40-3380................. Registration..... 4/1/97 11/3/99, 64 FR 59635.............. 5-40-3390................. Facility and 4/1/97 11/3/99, 64 FR 59635.............. Control Equipment Maintenance or Malfunction. 5-40-3400................. Permits.......... 4/1/97 11/3/99, 64 FR 59635.............. ---------------------------------------------------------------------------------------------------------------- Article 25 Emission Standards for Volatile Organic Compound Storage and Transfer Operations (Rule 4-25) ---------------------------------------------------------------------------------------------------------------- 5-40-3410................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2501. Designation of Affected Facility. 5-40-3420................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2502. 5-40-3430................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2503. Volatile Organic Compounds. 5-40-3440................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2504. Technology Guidelines. 5-40-3450................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2505. Visible Emissions. 5-40-3460................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2506. Fugitive Dust/ Emissions. 5-40-3490................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2509. 5-40-3500................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2510. Procedures. 5-40-3510................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2511. 5-40-3520................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2512. Records and Reporting. [[Page 33342]] 5-40-3530................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2513. 5-40-3540................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2514. Control Equipment Maintenance or Malfunction. 5-40-3550................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2515. ---------------------------------------------------------------------------------------------------------------- Article 26 Emission Standards for Large Coating Application Systems (Rule 4-26) ---------------------------------------------------------------------------------------------------------------- 5-40-3560................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2601. Designation of Affected Facility. 5-40-3570................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2602. 5-40-3580................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2603. Volatile Organic Compounds. 5-40-3590................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2604. Technology Guidelines. 5-40-3600................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2605. Visible Emissions. 5-40-3610................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2606. Fugitive Dust/ Emissions. 5-40-3640................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2609. 5-40-3650................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2610. Procedures. 5-40-3660................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2611. 5-40-3670................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2612. Records and Reporting. 5-40-3680................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2613. 5-40-3690................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2614. Control Equipment Maintenance or Malfunction. 5-40-3700................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2615. ---------------------------------------------------------------------------------------------------------------- Article 27 Emission Standards for Magnet Wire Coating Application Systems (Rule 4-27) ---------------------------------------------------------------------------------------------------------------- 5-40-3710................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2701. Designation of Affected Facility. 5-40-3720................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2702. 5-40-3730................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2703. Volatile Organic Compounds. 5-40-3740................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2704. Technology Guidelines. 5-40-3750................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2705. Visible Emissions. 5-40-3760................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2706. Fugitive Dust/ Emissions. 5-40-3790................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2709. 5-40-3800................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2710. Procedures. 5-40-3810................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2711. 5-40-3820................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2712. Records and Reporting. 5-40-3830................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2713. 5-40-3840................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2714. Control Equipment Maintenance or Malfunction. 5-40-3850................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2715. ---------------------------------------------------------------------------------------------------------------- Article 28 Emission Standards for Automobile and Light Duty Truck Coating Application Systems (Rule 4-28) ---------------------------------------------------------------------------------------------------------------- 5-40-3860................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2801. Designation of Affected Facility. 5-40-3870................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2802. 5-40-3880................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2803. Volatile Organic Compounds. 5-40-3890................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2804. Technology Guidelines. 5-40-3900................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2805. Visible Emissions. 5-40-3910................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2806. Fugitive Dust/ Emissions. 5-40-3940................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2809. 5-40-3950................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2810. Procedures. 5-40-3960................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2811. 5-40-3970................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2812. Records and Reporting. 5-40-3980................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2813. 5-40-3990................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2814. Control Equipment Maintenance or Malfunction. 5-40-4000................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2815. ---------------------------------------------------------------------------------------------------------------- Article 29 Emission Standards for Can Coating Application Systems (Rule 4-29) ---------------------------------------------------------------------------------------------------------------- 5-40-4010................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2901. Designation of Affected Facility. 5-40-4020................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2902. 5-40-4030................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2903. Volatile Organic Compounds. 5-40-4040................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2904. Technology Guidelines. 5-40-4050................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2905. Visible Emissions. [[Page 33343]] 5-40-4060................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2906. Fugitive Dust/ Emissions. 5-40-4090................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2909. 5-40-4100................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2910. Procedures. 5-40-4110................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2911. 5-40-4120................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2912. Records and Reporting. 5-40-4130................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2913. 5-40-4140................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2914. Control Equipment Maintenance or Malfunction. 5-40-4150................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-2915. ---------------------------------------------------------------------------------------------------------------- Article 30 Emission Standards for Metal Coil Coating Application Systems (Rule 4-30) ---------------------------------------------------------------------------------------------------------------- 5-40-4160................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3001. Designation of Affected Facility. 5-40-4170................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3002. 5-40-4180................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3003. Volatile Organic Compounds. 5-40-4190................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3004. Technology Guidelines. 5-40-4200................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3005. Visible Emissions. 5-40-4210................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3006. Fugitive Dust/ Emissions. 5-40-4240................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3009. 5-40-4250................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3010. Procedures. 5-40-4260................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3011. 5-40-4270................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3012. Records and Reporting. 5-40-4280................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3013. 5-40-4290................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3014. Control Equipment Maintenance or Malfunction. 5-40-4300................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3015. ---------------------------------------------------------------------------------------------------------------- Article 31 Emission Standards for Paper and Fabric Coating Application Systems (Rule 4-31) ---------------------------------------------------------------------------------------------------------------- 5-40-4310................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3101. Designation of Affected Facility. 5-40-4320................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3102. 5-40-4330................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3103. Volatile Organic Compounds. 5-40-4340................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3104. Technology Guidelines. 5-40-4350................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3105. Visible Emissions. 5-40-4360................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3106. Fugitive Dust/ Emissions. 5-40-4390................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3109. 5-40-4400................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3110. Procedures. 5-40-4410................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3111. 5-40-4420................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3112. Records and Reporting. 5-40-4430................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3113. 5-40-4440................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3114. Control Equipment Maintenance or Malfunction. 5-40-4450................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3115. ---------------------------------------------------------------------------------------------------------------- Article 32 Emission Standards for Vinyl Coating Application Systems (Rule 4-32) ---------------------------------------------------------------------------------------------------------------- 5-40-4460................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3201. Designation of Affected Facility. 5-40-4470................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3202. 5-40-4480................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3203. Volatile Organic Compounds. 5-40-4490................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3204. Technology Guidelines. 5-40-4500................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3205. Visible Emissions. 5-40-4510................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3206. Fugitive Dust/ Emissions. 5-40-4540................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3209. 5-40-4550................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3210. Procedures. 5-40-4560................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3211. 5-40-4570................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3212. Records and Reporting. 5-40-4580................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3213. 5-40-4590................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3214. Control Equipment Maintenance or Malfunction. 5-40-4600................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3215. ---------------------------------------------------------------------------------------------------------------- Article 33 Emission Standards for Metal Furniture Coating Application Systems (Rule 4-33) ---------------------------------------------------------------------------------------------------------------- 5-40-4610................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3301. Designation of Affected Facility. [[Page 33344]] 5-40-4620................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3302. 5-40-4630................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3303. Volatile Organic Compounds. 5-40-4640................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3304. Technology Guidelines. 5-40-4650................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3305. Visible Emissions. 5-40-4660................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3306. Fugitive Dust/ Emissions. 5-40-4690................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3309. 5-40-4700................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3310. Procedures. 5-40-4710................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3311. 5-40-4720................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3312. Records and Reporting. 5-40-4730................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3313. 5-40-4740................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3314. Control Equipment Maintenance or Malfunction. 5-40-4750................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3315. ---------------------------------------------------------------------------------------------------------------- Article 34 Emission Standards for Miscellaneous Metal Parts and Products Coating Application Systems (Rule 4-34) ---------------------------------------------------------------------------------------------------------------- 5-40-4760................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3401. Designation of Affected Facility. 5-40-4770................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3402. 5-40-4780................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3403. Volatile Organic Compounds. 5-40-4790................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3404. Technology Guidelines. 5-40-4800................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3405. Visible Emissions. 5-40-4810................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3406. Fugitive Dust/ Emissions. 5-40-4840................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3409. 5-40-4850................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3410. Procedures. 5-40-4860................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3411. 5-40-4870................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3412. Records and Reporting. 5-40-4880................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3413. 5-40-4890................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3414. Control Equipment Maintenance or Malfunction. 5-40-4900................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3415. ---------------------------------------------------------------------------------------------------------------- Article 35 Emission Standards for Flatwood Paneling Coating Application Systems (Rule 4-35) ---------------------------------------------------------------------------------------------------------------- 5-40-4910................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3501. Designation of Affected Facility. 5-40-4920................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3502. 5-40-4930................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3503. Volatile Organic Compounds. 5-40-4940................. Control 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3504. Technology Guidelines. 5-40-4950................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3505. Visible Emissions. 5-40-4960................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3506. Fugitive Dust/ Emissions. 5-40-4990................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3509. 5-40-5000................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3510. Procedures. 5-40-5010................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3511. 5-40-5020................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3512. Records and Reporting. 5-40-5030................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3513. 5-40-5040................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3514. Control Equipment Maintenance or Malfunction. 5-40-5050................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3515. ---------------------------------------------------------------------------------------------------------------- Article 36 Flexographic, Packaging Rotogravure, and Publication Rotogravure Printing Lines (Rule 4-36) ---------------------------------------------------------------------------------------------------------------- 5-40-5060................. Applicability and 4/1/96 3/2/07, 72 FR 9441................ Designation of 10/4/06 Affected Facility. 5-40-5070................. Definitions...... 4/1/96 3/12/97, 62 FR 11334.............. Sec. 52.2465(c)(113)( i)(B)(4). 5-40-5080................. Standard for 4/1/96 3/12/97, 62 FR 11334.............. Volatile Organic Compounds. 5-40-5090................. Standard for 4/1/96 3/12/97, 62 FR 11334.............. Visible Emissions. 5-40-5100................. Standard for 4/1/96 3/12/97, 62 FR 11334.............. Fugitive Dust/ Emissions. 5-40-5130................. Compliance....... 4/1/96 3/12/97, 62 FR 11334.............. 5-40-5140................. Test Methods and 4/1/96 3/12/97, 62 FR 11334.............. Procedures. 5-40-5150................. Monitoring....... 4/1/96 3/12/97, 62 FR 11334.............. 5-40-5160................. Notification, 4/1/96 3/12/97, 62 FR 11334.............. Records and Reporting. 5-40-5170................. Registration..... 4/1/96 3/12/97, 62 FR 11334.............. 5-40-5180................. Facility and 4/1/96 3/12/97, 62 FR 11334.............. Control Equipment Maintenance or Malfunction. 5-40-5190................. Permits.......... 4/1/96 3/12/97, 62 FR 11334.............. ---------------------------------------------------------------------------------------------------------------- [[Page 33345]] Article 37 Emission Standards for Petroleum Liquid Storage and Transfer Operations (Rule 4-37) ---------------------------------------------------------------------------------------------------------------- 5-40-5200................. Applicability and 4/1/96 3/2/07, 72 FR 9441................ Designation of 10/4/06 Affected Facility. 5-40-5210................. Definitions...... 2/1/02 3/3/06, 71 FR 10838............... 5-40-5220................. Standard for 3/24/04 4/27/05, 70 FR 21625.............. Volatile Organic Compounds. 5-40-5230................. Control 2/1/02 3/3/06, 71 FR 10838............... Technology Guidelines. 5-40-5240................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3705. Visible Emissions. 5-40-5250................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3706. Fugitive Dust/ Emissions. 5-40-5280................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3709. 5-40-5290................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3710. Procedures. 5-40-5300................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3711. 5-40-5310................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3712. Records and Reporting. 5-40-5320................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3713. 5-40-5330................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3714. Control Equipment Maintenance or Malfunction. 5-40-5340................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3715. ---------------------------------------------------------------------------------------------------------------- Article 39 Emission Standards for Asphalt Paving Operations (Rule 4-39) ---------------------------------------------------------------------------------------------------------------- 5-40-5490................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3901. Designation of Affected Facility. 5-40-5500................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3902. 5-40-5510................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3903. Volatile Organic Compounds. 5-40-5520................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3904. Visible Emissions. 5-40-5530................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3905. Fugitive Dust/ Emissions. 5-40-5560................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3908. 5-40-5570................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3909. Procedures. 5-40-5580................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3910. 5-40-5590................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-04-3911. Records and Reporting. ---------------------------------------------------------------------------------------------------------------- Article 40 Emission Standards for Open Burning (Rule 4-40) ---------------------------------------------------------------------------------------------------------------- 5-40-5600................. Applicability.... 10/18/06 3/19/09, 74 FR 11661.............. Provisions of Article 40 expanded to new localities in the emissions control areas. 5-40-5610................. Definitions...... 10/18/06 3/19/09, 74 FR 11661.............. Terms added: Air curtain incinerator, Clean lumber, Wood waste, and Yard waste. Terms revised: Clean burning waste, Clean wood, Commercial waste, Construction waste, Debris waste, Demolition waste, Garbage, Hazardous waste, Household waste, Industrial waste, Junkyard, Open burning, Open pit incinerator, Refuse, Sanitary landfill, and Special incineration device. 5-40-5610................. All definitions 4/17/95 4/21/00, 65 FR 21315.............. 120-04-4002. not listed above. 5-40-5620................. Open burning 10/18/06 3/19/09, 74 FR 11661.............. prohibitions. 5-40-5630................. Permissible open 10/18/06 3/19/09, 74 FR 11661.............. burning. 5-40-5631................. Forest Management 7/1/97 3/12/97, 62 FR 11332.............. Former Appendix and Agricultural D, effective 4/1/ Practices. 96. ---------------------------------------------------------------------------------------------------------------- Article 41 Emission Standards for Mobile Sources (Rule 4-41) ---------------------------------------------------------------------------------------------------------------- 5-40-5650................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-04-4101. Designation of Affected Facility. 5-40-5660................. Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-4102. 5-40-5670................. Motor Vehicles... 4/17/95 4/21/00, 65 FR 21315.............. 120-04-4103. 5-40-5680................. Other Mobile 4/17/95 4/21/00, 65 FR 21315.............. 120-04-4104. Sources. 5-40-5690................. Export/Import of 4/17/95 4/21/00, 65 FR 21315.............. 120-04-4105. Motor Vehicles. ---------------------------------------------------------------------------------------------------------------- Article 42 Emissions Standards for Portable Fuel ContainerSpillage (Rule 4-42) ---------------------------------------------------------------------------------------------------------------- 5-40-5700................. Applicability.... 3/24/04 6/8/04, 69 FR 31893............... 5-40-5700................. Applicability and 10/4/06 12/5/07, 72 FR 68511.............. Revision extends designation of the affected applicability to facility. include the Fredericksburg VOC Emissions Control Area. [[Page 33346]] 5-40-5710................. Definitions...... 3/24/04 6/8/04, 69 FR 31893............... 5-40-5720................. Standard for 10/4/06 12/5/07, 72 FR 68511.............. volatile organic compounds. 5-40-5730................. Administrative 3/24/04 6/8/04, 69 FR 31893............... requirements. 5-40-5740................. Compliance....... 3/24/04 6/8/04, 69 FR 31893............... 5-40-5750................. Compliance 10/4/06 12/5/07, 72 FR 68511.............. schedules. 5-40-5760................. Test methods and 3/24/04 6/8/04, 69 FR 31893............... procedures. 5-40-5770................. Notification, 3/24/04 6/8/04, 69 FR 31893............... records and reporting. ---------------------------------------------------------------------------------------------------------------- Article 43 Municipal Solid Waste Landfills (Rule 4-43) ---------------------------------------------------------------------------------------------------------------- 5-40-5800................. Applicability and 1/29/04 12/29/04, 69 FR 77900............. Designation of Affected Facility. 5-40-5810................. Definitions...... 1/29/04 12/29/04, 69 FR 77900............. 5-40-5820................. Standards for Air 1/29/04 12/29/04, 69 FR 77900............. Emissions. 5-40-5822................. Operational 1/29/04 12/29/04, 69 FR 77900............. standards for collection and control systems. 5-40-5824................. Specifications 1/29/04 12/29/04, 69 FR 77900............. for active collection systems. 5-40-5850................. Compliance....... 1/29/04 12/29/04, 69 FR 77900............. 5-40-5855................. Compliance 1/29/04 12/29/04, 69 FR 77900............. schedule. 5-40-5860................. Test methods and 1/29/04 12/29/04, 69 FR 77900............. procedures. 5-40-5870................. Monitoring....... 1/29/04 12/29/04, 69 FR 77900............. 5-40-5880................. Reporting........ 1/29/04 12/29/04, 69 FR 77900............. 5-40-5890................. Recordkeeping.... 1/29/04 12/29/04, 69 FR 77900............. 5-40-5900................. Registration..... 1/29/04 12/29/04, 69 FR 77900............. 5-40-5910................. Facility and 1/29/04 12/29/04, 69 FR 77900............. control equipment Maintenance or Malfunction. 5-40-5920................. Permits.......... 1/29/04 12/29/04, 69 FR 77900............. ---------------------------------------------------------------------------------------------------------------- Article 47 Emission Standards for Solvent Metal Cleaning Operations in the Northern Virginia Volatile Organic Compound Emissions Control Area (Rule 4-47) ---------------------------------------------------------------------------------------------------------------- 5-40-6820................. Applicability.... 3/24/04 6/9/04, 69 FR 32277............... 5-40-6830................. Definitions...... 3/24/04 6/9/04, 69 FR 32277............... 5-40-6840................. Standards for 3/24/04 6/9/04, 69 FR 32277............... volatile organic compounds. 5-40-6850................. Standard for 3/24/04 6/9/04, 69 FR 32277............... visible emissions. 5-40-6860................. Standard for 3/24/04 6/9/04, 69 FR 32277............... fugitive dust/ emissions. 5-40-6890................. Compliance....... 3/24/04 6/9/04, 69 FR 32277............... 5-40-6900................. Compliance 3/24/04 6/9/04, 69 FR 32277............... schedules. 5-40-6910................. Test methods and 3/24/04 6/9/04, 69 FR 32277............... procedures. 5-40-6920................. Monitoring....... 3/24/04 6/9/04, 69 FR 32277............... 5-40-6930................. Notification, 3/24/04 6/9/04, 69 FR 32277............... records and reporting. 5-40-6940................. Registration..... 3/24/04 6/9/04, 69 FR 32277............... 5-40-6950................. Facility and 3/24/04 6/9/04, 69 FR 32277............... control equipment Maintenance or Malfunction. 5-40-6960................. Permits.......... 3/24/04 6/9/04, 69 FR 32277............... ---------------------------------------------------------------------------------------------------------------- Article 48 Emission Standards for Mobile Equipment Repairand Refinishing (Rule 4-48) ---------------------------------------------------------------------------------------------------------------- 5-40-6970................. Applicability and 10/4/06 12/5/07, 72 FR 68511.............. Revision extends designation of the affected applicability to facility. include the Fredericksburg VOC Emissions Control Area. 5-40-6980................. Definitions...... 3/24/04 6/24/04, 69 FR 35253.............. 5-40-6990................. Standards for 3/24/04 6/24/04, 69 FR 35253.............. volatile organic compounds. 5-40-7000................. Standard for 3/24/04 6/24/04, 69 FR 35253.............. visible emissions. 5-40-7010................. Standard for 3/24/04 6/24/04, 69 FR 35253.............. fugitive dust/ emissions. 5-40-7040................. Compliance....... 3/24/04 6/24/04, 69 FR 35253.............. 5-40-7050................. Compliance 10/4/06 12/5/07, 72 FR 68511.............. schedule. 5-40-7060................. Test methods and 3/24/04 6/24/04, 69 FR 35253.............. procedures. 5-40-7070................. Monitoring....... 3/24/04 6/24/0, 69 FR 35253............... 5-40-7080................. Notification, 3/24/04 6/24/04, 69 FR 35253.............. records and reporting. 5-40-7090................. Registration..... 3/24/04 6/24/04, 69 FR 35253.............. 5-40-7100................. Facility and 3/24/04 6/24/04, 69 FR 35253.............. control equipment Maintenance or Malfunction. 5-40-7110................. Permits.......... 3/24/04 6/24/04, 69 FR 35253.............. ---------------------------------------------------------------------------------------------------------------- [[Page 33347]] Article 49 Emission Standards for Architectural and Maintenance Coatings (Rule 4-49) ---------------------------------------------------------------------------------------------------------------- 5-40-7120................. Applicability and 10/4/06 12/5/07, 72 FR 68511.............. Revision extends designation of the affected applicability to facility. include the Fredericksburg VOC Emissions Control Area. 5-40-7130................. Definitions...... 10/4/06 12/5/07, 72 FR 68511.............. Revision adds definitions for the following: ASTM, Calcimine recoater, Concrete surface retarder, Conversion varnish, Impacted immersion coating, Nuclear coating, and Thermoplasatic rubber coating and mastic. 5-40-7140................. Standard for 10/4/06 12/5/07, 72 FR 68511.............. Revision adds volatile organic standards for compounds. the following categories: Calcimine recoaters, Conversion varnishes, Concrete surface retarder, Impacted immersion coatings, Nuclear coatings, and Thermoplastic rubber coating and mastic. 5-40-7150................. Container 3/24/04 5/12/05, 70 FR 24970.............. Labeling Requirements. 5-40-7160................. Standard for 3/24/04 5/12/05, 70 FR 24970.............. Visible Emissions. 5-40-7170................. Standard for 3/24/04 5/12/05, 70 FR 24970.............. Fugitive Dust/ Emissions. 5-40-7200................. Compliance....... 3/24/04 5/12/05, 70 FR 24970.............. 5-40-7210................. Compliance 10/4/06 12/5/07, 72 FR 68511.............. schedules. 5-40-7220................. Test Methods and 3/24/04 5/12/05, 70 FR 24970.............. Procedures. 5-40-7230................. Notification, 3/24/04 5/12/05, 70 FR 24970.............. Records and Reporting. ---------------------------------------------------------------------------------------------------------------- Article 50 Emission Standards for Consumer Products (Rule 4-50) ---------------------------------------------------------------------------------------------------------------- 5-40-7240................. Applicability.... 10/4/06 12/5/07, 72 FR 68511.............. Revision extends the applicability to include the Fredericksburg VOC Emissions Control Area. 5-40-7250................. Exemptions....... 10/4/06 12/5/07, 72 FR 68511.............. 5-40-7260................. Definitions...... 10/4/06 12/5/07, 72 FR 68511.............. 5-40-7270................. Standard for 10/4/06 12/5/07, 72 FR 68511.............. volatile organic compounds. 5-40-7280................. Alternative 3/9/05 1/30/07, 72 FR 4207............... control plan (ACP) for consumer products. 5-40-7290................. Innovative 3/9/05 1/30/07, 72 FR 4207............... Products. 5-40-7300................. Administrative 3/9/05 1/30/07, 72 FR 4207............... requirements. 5-40-7300................. Administrative 10/4/06 12/5/07, 72 FR 68511.............. requirements. 5-40-7320................. Compliance....... 3/9/05 1/30/07, 72 FR 4207............... 5-40-7330................. Compliance 10/4/06 12/5/07, 72 FR 68511.............. schedules. 5-40-7340................. Test methods and 3/9/05 1/30/07, 72 FR 4207............... procedures. 5-40-7350................. Monitoring....... 3/9/05 1/30/07, 72 FR 4207............... 5-40-7360................. Notification, 10/4/06 12/5/07, 72 FR 68511.............. records and reporting. ---------------------------------------------------------------------------------------------------------------- Article 53 Emission Standards for Lithographic Printing Processes (Rule 4-53) [Formerly Article 45] ---------------------------------------------------------------------------------------------------------------- 5-40-7800................. Applicability and 10/4/06 3/2/07, 72 FR 9441................ Revised to designation of include and affected exempt certain facility. emission control areas. 5-40-7810................. Definitions of 4/1/96 3/2/07, 72 FR 9441................ alcohol, 10/4/06 Cleaning solution, fountain solution, lithographic printing, printing process. 5-40-7820................. Standard for 4/1/96 3/2/07, 72 FR 9441................ Volatile Organic 10/4/06 Compounds. 5-40-7840................. Standard for 4/1/96 3/2/07, 72 FR 9441................ Visible 10/4/06 Emissions. 5-40-7850................. Standard for 4/1/96 3/2/07, 72 FR 9441................ Fugitive Dust 10/4/06 Emissions. 5-40-7880................. Compliance....... 10/4/06 3/2/07, 72 FR 9441................ Revisions to compliance dates. 5-40-7890................. Test Methods and 4/1/96 3/2/07, 72 FR 9441................ Procedures. 10/4/06 5-40-7900................. Monitoring....... 4/1/96 3/2/07, 72 FR 9441................ 10/4/06 5-40-7910................. Notification, 4/1/96 3/2/07, 72 FR 9441................ Records and 10/4/06 Reporting. 5-40-7920................. Registration..... 4/1/96 3/2/07, 72 FR 9441................ 10/4/06 [[Page 33348]] 5-40-7930................. Facility and 4/1/96 3/2/07, 72 FR 9441................ Control 10/4/06 Equipment Maintenance and Malfunction. 5-40-7940................. Permits.......... 4/1/96 3/2/07, 72 FR 9441................ 10/4/06 ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 50 New and Modified Stationary Sources [Part V] ---------------------------------------------------------------------------------------------------------------- Part I Special Provisions ---------------------------------------------------------------------------------------------------------------- 5-50-10................... Applicability.... 8/1/02 3/15/04, 69 FR 12074.............. 5-50-20................... Compliance....... 8/1/02 3/15/04, 69 FR 12074.............. 5-50-30................... Performance 8/1/02 3/15/04, 69 FR 12074.............. Testing. 5-50-40................... Monitoring....... 8/1/02 3/15/04, 69 FR 12074.............. 5-50-50................... Notification, 8/1/02 3/15/04, 69 FR 12074.............. Records and Reporting. ---------------------------------------------------------------------------------------------------------------- Part II Emission Standards ---------------------------------------------------------------------------------------------------------------- Article 1 Standards of Performance for Visible Emissions and Fugitive Dust/Emissions (Rule 5-1) ---------------------------------------------------------------------------------------------------------------- 5-50-60................... Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0101. Designation of Affected Facility. 5-50-70................... Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0102. 5-50-80................... Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0103. Visible Emissions. 5-50-90................... Standard for 2/1/03 4/29/05, 70 FR 22263.............. Fugitive Dust/ Emissions. 5-50-100.................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0105. 5-50-110.................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0106. Procedures. 5-50-120.................. Waivers.......... 2/1/03 4/29/05, 70 FR 22263.............. ---------------------------------------------------------------------------------------------------------------- Article 4 Standards of Performance for Stationary Sources (Rule 5-4) ---------------------------------------------------------------------------------------------------------------- 5-50-240.................. Applicability and 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0401. Designation of Affected Facility. 5-50-250.................. Definitions...... 9/1/06 10/22/08, 73 FR 62897............. Revised definition of New Source Review Program, Limited Approval. 5-50-260.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0403. Stationary Sources. 5-50-270.................. Standard for 9/1/06 10/22/08, 73 FR 62893............. Changes Major Stationary Qualifying Sources pollutant to (Nonattainment Regulated NSR Areas). pollutant, Limited Approval. 5-50-280.................. Standard for 9/1/06 10/22/08, 73 FR 62897............. Changes Pollutant Major Stationary subject to Sources regulation under (Prevention of the Federal Significant Clean Air Act to Deterioration Regulated NSR Areas). pollutant, Limited Approval. 5-50-290.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0406. Visible Emissions. 5-50-300.................. Standard for 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0407. Fugitive Dust/ Emissions. 5-50-330.................. Compliance....... 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0410. 5-50-340.................. Test Methods and 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0411. Procedures. 5-50-350.................. Monitoring....... 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0412. 5-50-360.................. Notification, 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0413. Records and Reporting. 5-50-370.................. Registration..... 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0414. 5-50-380.................. Facility and 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0415. Control Equipment Maintenance or Malfunction. 5-50-390.................. Permits.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-05-0416. ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 70 Air Pollution Episode Prevention [Part VII] ---------------------------------------------------------------------------------------------------------------- 5-70-10................... Applicability.... 4/17/95 4/21/00, 65 FR 21315.............. 120-07-01. 5-70-20................... Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 120-07-02. 5-70-30................... General.......... 4/17/95 4/21/00, 65 FR 21315.............. 120-07-03. 5-70-40................... Episode 4/1/99 10/19/00 65 FR 62626............... References to TSP Determination. have been removed. 5-70-50................... Standby Emission 4/17/95 4/21/00, 65 FR 21315.............. 120-07-05. Reduction Plans. 5-70-60................... Control 4/17/95 4/21/00, 65 FR 21315.............. 120-07-06. Requirements. 5-70-70................... Local Air 4/17/95 4/21/00, 65 FR 21315.............. 120-07-07. Pollution Control Agency Participation. ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 80 Permits for Stationary Sources [Part VIII] ---------------------------------------------------------------------------------------------------------------- 5-80-10................... New and Modified 4/17/95 4/21/00, 65 FR 21315.............. 120-08-01. Stationary Sources. 10A....................... Applicability.... 4/17/95 4/21/00, 65 FR 21315.............. 01A. 10B....................... Definitions...... 4/17/95 4/21/00, 65 FR 21315.............. 01B. 10C (Exc.C1.b)............ General.......... 4/17/95 4/21/00, 65 FR 21315.............. 01C. (Exc.C.1.b) [[Page 33349]] 10D....................... Applications..... 4/17/95 4/21/00, 65 FR 21315.............. 01D. 10E....................... Information 4/17/95 4/21/00, 65 FR 21315.............. 01E. required. 10F....................... Action on permit 4/17/95 4/21/00, 65 FR 21315.............. 01F. application. 10G....................... Public 4/17/95 4/21/00, 65 FR 21315.............. 01G.; Exceptions: participation. 10.G.1 and 10G.4.b. VR120-08-01C.4.b., c...... Public 7/31/81; 5/4/82, 47 FR 19134; recodified 2/ See Sec. Participation--p recodified 25/93, 58 FR 11373. 52.2423(o). ublic hearing 2/1/85 requirements for major modifications. 10H.2. and 10H.3.......... Standards for 4/17/95 4/21/00, 65 FR 21315.............. 01H.2. and 01H.3. granting permits. 10I.1. and 10I.3.......... Application 4/17/95 4/21/00, 65 FR 21315.............. 01I.1. and 01I.3. review and analysis. 10J....................... Compliance 4/17/95 4/21/00, 65 FR 21315.............. 01J. determination and verification by performance testing. 10K....................... Permit 4/17/95 4/21/00, 65 FR 21315.............. 01K. invalidation, revocation and enforcement. 10L....................... Existence of 4/17/95 4/21/00, 65 FR 21315.............. 01L. permit no defense. 10M....................... Compliance with 4/17/95 4/21/00, 65 FR 21315.............. 01M. local zoning requirements. 10N....................... Reactivation and 4/17/95 4/21/00, 65 FR 21315.............. 01N. permanent shutdown. 10O....................... Transfer of 4/17/95 4/21/00, 65 FR 21315.............. 01O. permits. 10P....................... Circumvention.... 4/17/95 4/21/00, 65 FR 21315.............. 01P. 5-80-11................... Stationary source 7/1/97 4/21/00, 65 FR 21315.............. Appendix R. permit exemption levels. ---------------------------------------------------------------------------------------------------------------- Article 5 State Operating Permits ---------------------------------------------------------------------------------------------------------------- 5-80-800.................. Applicability.... 4/1/98 6/27/03, 68 FR 38191.............. 5-80-810.................. Definitions...... 4/1/98 6/27/03, 68 FR 38191.............. 5-80-820.................. General.......... 4/1/98 6/27/03, 68 FR 38191.............. 5-80-830.................. Applications..... 4/1/98 6/27/03, 68 FR 38191.............. 5-80-840.................. Application 4/1/98 6/27/03, 68 FR 38191.............. information required. 5-80-850.................. Standards and 4/1/98 6/27/03, 68 FR 38191.............. conditions for granting Permits. 5-80-860.................. Action on permit 4/1/98 6/27/03, 68 FR 38191.............. application. 5-80-870.................. Application 4/1/98 6/27/03, 68 FR 38191.............. review and analysis. 5-80-880.................. Compliance 4/1/98 6/27/03, 68 FR 38191.............. determination and verification by testing. 5-80-890.................. Monitoring 4/1/98 6/27/03, 68 FR 38191.............. requirements. 5-80-900.................. Reporting 4/1/98 6/27/03, 68 FR 38191.............. requirements. 5-80-910.................. Existence of 4/1/98 6/27/03, 68 FR 38191.............. permits no defense. 5-80-920.................. Circumvention.... 4/1/98 6/27/03, 68 FR 38191.............. 5-80-930.................. Compliance with 4/1/98 6/27/03, 68 FR 38191.............. local zoning requirements. 5-80-940.................. Transfer of 4/1/98 6/27/03, 68 FR 38191.............. Permits. 5-80-950.................. Termination of 4/1/98 6/27/03, 68 FR 38191.............. Permits. 5-80-960.................. Changes to 4/1/98 6/27/03, 68 FR 38191.............. Permits. 5-80-970.................. Administrative 4/1/98 6/27/03, 68 FR 38191.............. permit amendments. 5-80-980.................. Minor permit 4/1/98 6/27/03, 68 FR 38191.............. amendments. 5-80-990.................. Significant 4/1/98 6/27/03, 68 FR 38191.............. permit amendments. 5-80-1000................. Reopening for 4/1/98 6/27/03, 68 FR 38191.............. cause. 5-80-1010................. Enforcement...... 4/1/98 6/27/03, 68 FR 38191.............. 5-80-1020................. Public 4/1/98 6/27/03, 68 FR 38191.............. participation. 5-80-1030................. General Permits.. 4/1/98 6/27/03, 68 FR 38191.............. 5-80-1040................. Review and 4/1/98 6/27/03, 68 FR 38191.............. evaluation of article. ---------------------------------------------------------------------------------------------------------------- Article 8 Permits--Major Stationary Sources and Major Modifications Located in Prevention of Significant Deterioration Areas ---------------------------------------------------------------------------------------------------------------- 5-80-1605................. Applicability.... 9/1/06 10/22/08, 73 FR 62897............. 5-80-1700, Limited Approval. 5-80-1615................. Definitions...... 9/1/06 10/22/08, 73 FR 62897............. 5-80-1710, Limited Approval. 5-80-1625................. General.......... 9/1/06 10/22/08, 73 FR 62897............. 5-80-1720, Limited Approval. 5-80-1635................. Ambient Air 9/1/06 10/22/08, 73 FR 62897............. 5-80-1730, Increments. Limited Approval. 5-80-1645................. Ambient Air 9/1/06 10/22/08, 73 FR 62897............. 5-80-1740, Ceilings. Limited Approval. 5-80-1655................. Applications..... 9/1/06 10/22/08, 73 FR 62897............. 5-80-1750, Limited Approval. 5-80-1665................. Compliance with 9/1/06 10/22/08, 73 FR 62897............. 5-80-1760, local zoning Limited requirements. Approval. 5-80-1675................. Compliance 9/1/06 10/22/08, 73 FR 62897............. 5-80-1770, determination Limited and verification Approval. by performance testing. 5-80-1685................. Stack Heights.... 9/1/06 10/22/08, 73 FR 62897............. 5-80-1780, Limited Approval. 5-80-1695................. Exemptions....... 9/1/06 10/22/08, 73 FR 62897............. New, Limited Approval. 5-80-1705................. Control 9/1/06 10/22/08, 73 FR 62897............. 5-80-1800, technology Limited review. Approval. 5-80-1715................. Source impact 9/1/06 10/22/08, 73 FR 62897............. 5-80-1810 Limited analysis. Approval. [[Page 33350]] 5-80-1725................. Air quality 9/1/06 10/22/08, 73 FR 62897............. 5-80-1820, models. Limited Approval. 5-80-1735................. Air quality 9/1/06 10/22/08, 73 FR 62897............. 5-80-1830, analysis. Limited Approval. 5-80-1745................. Source 9/1/06 10/22/08, 73 FR 62897............. 5-80-1840, Information. Limited Approval. 5-80-1755................. Additional impact 9/1/06 10/22/08, 73 FR 62897............. 5-80-1850, analysis. Limited Approval. 5-80-1765................. Sources affecting 9/1/06 10/22/08, 73 FR 62897............. 5-80-1860, Federal class I Limited areas--additiona Approval. l requirements. 5-80-1775................. Public 9/1/06 10/22/08, 73 FR 62897............. 5-80-1870, participation. Limited Approval. 5-80-1785................. Source obligation 9/1/06 10/22/08, 73 FR 62897............. 5-80-1880, Limited Approval. 5-80-1795................. Environmental 9/1/06 10/22/08, 73 FR 62897............. 5-80-1890, impact Limited statements. Approval. 5-80-1805................. Disputed permits. 9/1/06 10/22/08, 73 FR 62897............. 5-80-1900, Limited Approval. 5-80-1815................. Interstate 9/1/06 10/22/08, 73 FR 62897............. 5-80-1910, pollution Limited abatement. Approval. 5-80-1825................. Innovative 9/1/06 10/22/08, 73 FR 62897............. 5-80-1920, control Limited technology. Approval. 5-80-1835................. Reserved......... 9/1/06 10/22/08, 73 FR 62897............. New, Limited Approval. 5-80-1845................. Reserved......... 9/1/06 10/22/08, 73 FR 62897............. New, Limited Approval. 5-80-1855................. Reserved......... 9/1/06 10/22/08, 73 FR 62897............. New, Limited Approval. 5-80-1865................. Actuals plantwide 9/1/06 10/22/08, 73 FR 62897............. New, Limited applicability Approval. (PAL). 5-80-1925................. Changes to 9/1/06 10/22/08, 73 FR 62897............. New, Limited permits. Approval. 5-80-1935................. Administrative 9/1/06 10/22/08, 73 FR 62897............. New, Limited permit Approval. amendments. 5-80-1945................. Minor permit 9/1/06 10/22/08, 73 FR 62897............. New, Limited amendments. Approval. 5-80-1955................. Significant 9/1/06 10/22/08, 73 FR 62897............. New, Limited amendment Approval. procedures. 5-80-1965................. Reopening for 9/1/06 10/22/08, 73 FR 62897............. New, Limited cause. Approval. 5-80-1975................. Transfer of 9/1/06 10/22/08, 73 FR 62897............. 5-80-1940, permits. Limited Approval. 5-80-1985................. Permit 9/1/06 10/22/08, 73 FR 62897............. 5-80-1950, invalidation, Limited revocation, and Approval. enforcement. 5-80-1995................. Existence of 9/1/06 10/22/08, 73 FR 62897............. New, Limited permit no Approval. defense. ---------------------------------------------------------------------------------------------------------------- Article 9 Permits--Major Stationary Sources and Major Modifications Located in Nonattainment Areas or the Ozone Transport Region ---------------------------------------------------------------------------------------------------------------- 5-80-2000................. Applicability.... 5/1/02 10/22/08, 73 FR 62893............. Limited Approval 9/1/06 of 9/1/06 amendments. 5-80-2010................. Definitions...... 5/1/02 10/22/08, 73 FR 62893............. Limited Approval 9/1/06 of 9/1/06 amendments. 5-80-2020................. General.......... 5/1/02 10/22/08, 73 FR 62893............. Limited Approval 9/1/06 of 9/1/06 amendments. 5-80-2030................. Applications..... 5/1/02 10/22/08, 73 FR 62893............. Limited Approval 9/1/06 of 9/1/06 amendments. 5-80-2040................. Application 5/1/02 10/22/08, 73 FR 62893............. Limited Approval information 9/1/06 of 9/1/06 required. amendments. 5-80-2050................. Standards and 5/1/02 10/22/08, 73 FR 62893............. Limited Approval conditions for 9/1/06 of 9/1/06 granting permits. amendments. 5-80-2060................. Action on permit 5/1/02 10/22/08, 73 FR 62893............. Limited Approval applications. 9/1/06 of 9/1/06 amendments. 5-80-2070................. Public 5/1/02 10/22/08, 73 FR 62893............. Limited Approval participation. 9/1/06 of 9/1/06 amendments. 5-80-2080................. Compliance 5/1/02 10/22/08, 73 FR 62893............. Limited Approval determination 9/1/06 of 9/1/06 and verification amendments. by performance testing. 5-80-2090................. Application 5/1/02 10/22/08, 73 FR 62893............. Limited Approval review and 9/1/06 of 9/1/06 analysis. amendments. 5-80-2091................. Source Obligation 9/1/06 10/22/08, 73 FR 62893............. New, Limited Approval. 5-80-2110................. Interstate 5/1/02 10/22/08, 73 FR 62893............. Limited Approval Pollution 9/1/06 of 9/1/06 Abatement. amendments. 5-80-2120................. Offsets.......... 5/1/02 10/22/08, 73 FR 62893............. Limited Approval 9/1/06 of 9/1/06 amendments. 5-80-2130................. De minimis 5/1/02 10/22/08, 73 FR 62893............. Limited Approval increases and 9/1/06 of 9/1/06 stationary amendments. source modification alternatives for ozone nonattainment areas classified as serious or severe in 9 VAC 5-20-204. 5-80-2140................. Exception........ 5/1/02 10/22/08, 73 FR 62893............. Limited Approval 9/1/06 of 9/1/06 amendments. 5-80-2144................. Actuals plantwide 9/1/06 10/22/08, 73 FR 62893............. New, Limited applicability Approval. limits (PALs). 5-80-2150................. Compliance with 5/1/02 10/22/08, 73 FR 62893............. Limited Approval local zoning 9/1/06 of 9/1/06 requirements. amendments. 5-80-2170................. Transfer of 5/1/02 10/22/08, 73 FR 62893............. Limited Approval permits. 9/1/06 of 9/1/06 amendments. 5-80-2180................. Permit 5/1/02 10/22/08, 73 FR 62893............. Limited Approval invalidation, 9/1/06 of 9/1/06 revocation and amendments. enforcement. [[Page 33351]] 5-80-2190................. Existence of 5/1/02 10/22/08, 73 FR 62893............. Limited Approval permit no 9/1/06 of 9/1/06 defense. amendments. 5-80-2200................. Changes to 5/1/02 10/22/08, 73 FR 62893............. New, Limited permits. 9/1/06 Approval of 9/1/ 06 amendments. 5-80-2210................. Administrative 5/1/02 10/22/08, 73 FR 62893............. New, Limited permit 9/1/06 Approval of 9/1/ amendments. 06 amendments. 5-80-2220................. Minor permit 5/1/02 10/22/08, 73 FR 62893............. New, Limited amendments. 9/1/06 Approval of 9/1/ 06 amendments. 5-80-2230................. Significant 5/1/02 10/22/08, 73 FR 62893............. New, Limited amendment 9/1/06 Approval of 9/1/ procedures. 06 amendments. 5-80-2240................. Reopening for 5/1/02 10/22/08, 73 FR 62893............. New, Limited cause. 9/1/06 Approval of 9/1/ 06 amendments. ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 91 Regulations for the Control of Motor Vehicle Emissions in the Northern Virginia Area........ ---------------------------------------------------------------------------------------------------------------- Part I Definitions ---------------------------------------------------------------------------------------------------------------- 5-91-10................... General.......... 1/24/97 9/1/99, 64 FR 47670............... 5-91-20................... Terms defined.... 1/24/97 9/1/99, 64 FR 47670............... Exception--``Nort hern Virginia program area'' does not include Fauquier County, Effective 1/1/ 98. 6/29/05 4/22/08, 73 FR 21540.............. ---------------------------------------------------------------------------------------------------------------- Part II General Provisions ---------------------------------------------------------------------------------------------------------------- 5-91-30................... Applicability and 10/1/02 4/22/08, 73 FR 21540.............. authority of the department. 5-91-40................... Establishment of 1/24/97 9/1/99, 64 FR 47670............... Regulations and Orders. 5-91-50................... Documents 10/1/02 4/22/08, 73 FR 21540.............. incorporated by reference. 5-91-60................... Hearings and 1/24/97 9/1/99, 64 FR 47670............... Proceedings. 5-91-70................... Appeal of case 10/1/02 4/22/08, 73 FR 21540.............. decisions. 5-91-80................... Variances........ 1/24/97 9/1/99, 64 FR 47670............... 5-91-90................... Right of entry... 1/24/97 9/1/99, 64 FR 47670............... 5-91-100.................. Conditions on 1/24/97 9/1/99, 64 FR 47670............... approvals. 5-91-110.................. Procedural 1/24/97 9/1/99, 64 FR 47670............... information and guidance. 5-91-120.................. Export and import 10/1/02 4/22/08, 73 FR 21540.............. of motor vehicles. 5-91-130.................. Relationship of 1/24/97 9/1/99, 64 FR 47670............... state regulations to Federal regulations. 5-91-140.................. Delegation of 1/24/97 9/1/99, 64 FR 47670............... authority. 5-91-150.................. Availability of 1/24/97 9/1/99, 64 FR 47670............... information. ---------------------------------------------------------------------------------------------------------------- Part III Emission Standards for Motor Vehicle Air Pollution ---------------------------------------------------------------------------------------------------------------- 5-91-160.................. Exhaust emission 6/29/05 4/22/08, 73 FR 21540.............. standards for two-speed idle testing in enhanced emissions inspection programs. 5-91-170.................. Exhaust emission 10/1/02 4/22/08, 73 FR 21540.............. standards for ASM testing in enhanced emissions inspection programs. 5-91-180.................. Exhaust emission 6/29/05 4/22/08, 73 FR 21540.............. standards for on- road testing through remote sensing. 5-91-190.................. Emissions control 10/1/02 4/22/08, 73 FR 21540.............. system standards. 5-91-200.................. Evaporative 10/1/02 4/22/08, 73 FR 21540.............. emissions standards. 5-91-210.................. Visible emissions 10/1/02 4/22/08, 73 FR 21540.............. standards. ---------------------------------------------------------------------------------------------------------------- Part IV Permitting and Operation of Emissions Inspection Stations ---------------------------------------------------------------------------------------------------------------- 5-91-220.................. General 10/1/02 4/22/08, 73 FR 21540.............. provisions. 5-91-230.................. Applications..... 10/1/02 4/22/08, 73 FR 21540.............. 5-91-240.................. Standards and 1/27/97 9/1/99, 64 FR 47670............... conditions for permits. 5-91-250.................. Action on permit 1/27/97 9/1/99, 64 FR 47670............... application. 5-91-260.................. Emissions 10/1/02 4/22/08, 73 FR 21540.............. inspection station permits, categories. 5-91-270.................. Permit renewals.. 10/1/02 4/22/08, 73 FR 21540.............. 5-91-280.................. Permit 1/24/97 9/1/99, 64 FR 47670............... revocation, surrender of materials. 5-91-290.................. Emissions 10/1/02 4/22/08, 73 FR 21540.............. inspection station operations. 5-91-300.................. Emissions 10/1/02 4/22/08, 73 FR 21540.............. inspection station records. [[Page 33352]] 5-91-310.................. Sign and permit 10/1/02 4/22/08, 73 FR 21540.............. posting. 5-91-320.................. Equipment and 10/1/02 4/22/08, 73 FR 21540.............. facility requirements. 5-91-330.................. Analyzer system 10/1/02 4/22/08, 73 FR 21540.............. operation. 5-91-340.................. Motor vehicle 10/1/02 4/22/08, 73 FR 21540.............. inspection report; certificate of emissions inspection. 5-91-350.................. Data media....... 1/24/97 9/1/99, 64 FR 47670............... 5-91-360.................. Inspector 10/1/02 4/22/08, 73 FR 21540.............. Retitled and identification amended. number and access code usage. 5-91-370.................. Fleet emissions 10/1/02 4/22/08, 73 FR 21540.............. inspection stations; mobile fleet inspection stations. ---------------------------------------------------------------------------------------------------------------- Part V Emissions Inspector Testing and Licensing ---------------------------------------------------------------------------------------------------------------- 5-91-380.................. Emissions 10/21/02 4/22/08, 73 FR 21540.............. inspector licenses and renewals. 5-91-390.................. Qualification 1/24/97 9/1/99, 64 FR 47670............... requirements for emissions inspector licenses. 5-91-400.................. Conduct of 1/24/97 9/1/99, 64 FR 47670............... emissions inspectors. ---------------------------------------------------------------------------------------------------------------- Part VI Inspection Procedures ---------------------------------------------------------------------------------------------------------------- 5-91-410.................. General.......... 10/1/02 4/22/08, 73 FR 21540.............. 5-91-420.................. Inspection 10/1/02 4/22/08, 73 FR 21540.............. procedure; rejection, pass, fail, waiver. 5-91-430.................. ASM test 10/1/02 4/22/08, 73 FR 21540.............. procedure. 5-91-440.................. Two-speed idle 10/1/02 4/22/08, 73 FR 21540.............. test procedure. 5-91-450.................. Evaporative 10/1/02 4/22/08, 73 FR 21540.............. Retitled and system pressure amended. test and gas cap pressure test procedure. 5-91-480.................. Emissions related 10/1/02 4/22/08, 73 FR 21540.............. repairs. 5-91-490.................. Engine and fuel 10/1/02 4/22/08, 73 FR 21540.............. changes. ---------------------------------------------------------------------------------------------------------------- Part VII Vehicle Emissions Repair Facility Certification ---------------------------------------------------------------------------------------------------------------- 5-91-500.................. Applicability and 10/1/02 4/22/08, 73 FR 21540.............. authority. 5-90-510.................. Certification 10/1/02 4/22/08, 73 FR 21540.............. qualifications. 5-91-520.................. Expiration, 10/1/02 4/22/08, 73 FR 21540.............. reinstatement, renewal, and requalification. 5-91-530.................. Emissions and 10/1/02 4/22/08, 73 FR 21540.............. repair facility operations. 5-91-540.................. Sign and 10/1/02 4/22/08, 73 FR 21540.............. Retitled and certificate amended. posting. ---------------------------------------------------------------------------------------------------------------- Part VIII Emissions Repair Technician Certification and Responsibilities ---------------------------------------------------------------------------------------------------------------- 5-91-550.................. Applicability and 10/1/02 4/22/08, 73 FR 21540.............. authority. 5-91-560.................. Certification 10/1/02 4/22/08, 73 FR 21540.............. qualifications for emissions repair technicians. 5-91-570.................. Expiration, 10/1/02 4/22/08, 73 FR 21540.............. reinstatement, renewal and requalification. 5-91-580.................. Certified 10/1/02 4/22/08, 73 FR 21540.............. emissions repair technician responsibilities. ---------------------------------------------------------------------------------------------------------------- Part IX Enforcement Procedures ---------------------------------------------------------------------------------------------------------------- 5-91-590.................. Enforcement of 10/1/02 4/22/08, 73 FR 21540.............. regulations, permits, licenses, certifications and orders. 5-91-600.................. General 10/1/02 4/22/08, 73 FR 21540.............. enforcement process. 5-91-610.................. Consent orders 10/1/02 4/22/08, 73 FR 21540.............. and penalties for violations. 5-91-620.................. Major violations. 10/1/02 4/22/08, 73 FR 21540.............. 5-91-630.................. Minor violations. 4/2/97 9/1/99, 64 FR 47670............... ---------------------------------------------------------------------------------------------------------------- Part X Analyzer System Certification and Specifications for Enhanced Emissions Inspections Programs ---------------------------------------------------------------------------------------------------------------- 5-91-640.................. Applicability.... 1/24/97 9/1/99, 64 FR 47670............... 5-91-650.................. Design goals..... 10/1/02 4/22/08, 73 FR 21540.............. 5-91-660.................. Warranty; service 10/1/02 4/22/08, 73 FR 21540.............. contract. 5-91-670.................. Owner-provided 10/1/02 4/22/08, 73 FR 21540.............. services. 5-91-680.................. Certification of 10/1/02 4/22/08, 73 FR 21540.............. analyzer systems. 5-91-690.................. Span gases; gases 10/1/02 4/22/08, 73 FR 21540.............. for calibration purposes. 5-91-700.................. Calibration of 10/1/02 4/22/08, 73 FR 21540.............. exhaust gas analyzers. [[Page 33353]] 5-91-710.................. Upgrade of 10/1/02 4/22/08, 73 FR 21540.............. analyzer system. ---------------------------------------------------------------------------------------------------------------- Part XI Manufacturer Recall ---------------------------------------------------------------------------------------------------------------- 5-91-720.................. Vehicle 10/1/02 4/22/08, 73 FR 21540.............. manufacturers recall. 5-91-730.................. Exemptions; 1/24/97 9/1/99, 64 FR 47670............... temporary extensions. ---------------------------------------------------------------------------------------------------------------- Part XII On-Road Testing ---------------------------------------------------------------------------------------------------------------- 5-91-740.................. General 6/29/05 4/22/08, 73 FR 21540.............. requirements. 5-91-750.................. Operating 6/29/05 4/22/08, 73 FR 21540.............. procedures; violation of standards. 5-91-760.................. Schedule of civil 6/29/05 4/22/08, 73 FR 21540.............. charges. ---------------------------------------------------------------------------------------------------------------- Part XIV ASM Exhaust Emission Standards ---------------------------------------------------------------------------------------------------------------- 5-91-790.................. ASM start-up 10/1/02 4/22/08, 73 FR 21540.............. standards. 5-91-800.................. ASM final 10/1/02 4/22/08, 73 FR 21540.............. standards. ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 140 Regulation for Emissions Trading ---------------------------------------------------------------------------------------------------------------- Part I NOX Budget Trading Program ---------------------------------------------------------------------------------------------------------------- Article 1 NOX Budget Trading Program General Provisions ---------------------------------------------------------------------------------------------------------------- 5-140-10.................. Purpose.......... 7/17/02 7/8/03, 68 FR 40520............... 5-140-20.................. Definitions...... 7/17/02 7/8/03, 68 FR 40520............... 5-140-30.................. Measurements, 7/17/02 7/8/03, 68 FR 40520............... abbreviations, and acronyms. 5-140-31.................. Federal 7/17/02 7/8/03, 68 FR 40520............... Regulations Incorporated by reference. 5-140-40.................. Applicability.... 7/17/02 7/8/03, 68 FR 40520............... 5-140-50.................. Retired unit 7/17/02 7/8/03, 68 FR 40520............... exemption. 5-140-60.................. Standard 7/17/02 7/8/03, 68 FR 40520............... requirements. 5-140-70.................. Computation of 7/17/02 7/8/03, 68 FR 40520............... time. ---------------------------------------------------------------------------------------------------------------- Article 2 NOX Authorized Account Representative for NOX Budget Sources ---------------------------------------------------------------------------------------------------------------- 5-140-100................. Authorization and 7/17/02 7/8/03, 68 FR 40520............... responsibilities of the NOX authorized account representative. 5-140-110................. Alternate NOX 7/17/02 7/8/03, 68 FR 40520............... authorized account representative. 5-140-120................. Changing the NOX 7/17/02 7/8/03, 68 FR 40520............... authorized account representative and alternate NOX authorized account representative; changes in the owners and operators. 5-140-130................. Account 7/17/02 7/8/03, 68 FR 40520............... certificate of representation. 5-140-140................. Objections 7/17/02 7/8/03, 68 FR 40520............... concerning the NOX authorized account representative. ---------------------------------------------------------------------------------------------------------------- Article 3 Permits ---------------------------------------------------------------------------------------------------------------- 5-140-200................. General NOX 7/17/02 7/8/03, 68 FR 40520............... Budget permit requirements. 5-140-210................. Submission of NOX 7/17/02 7/8/03, 68 FR 40520............... Budget permit applications. 5-140-220................. Information 7/17/02 7/8/03, 68 FR 40520............... requirements for NOX Budget permit applications. 5-140-230................. NOX Budget permit 7/17/02 7/8/03, 68 FR 40520............... contents. 5-140-240................. Effective date of 7/17/02 7/8/03, 68 FR 40520............... initial NOX Budget permit. 5-140-250................. NOX Budget permit 7/17/02 7/8/03, 68 FR 40520............... revisions. ---------------------------------------------------------------------------------------------------------------- Article 4 Compliance Certification ---------------------------------------------------------------------------------------------------------------- 5-140-300................. Compliance 7/17/02 7/8/03, 68 FR 40520............... certification report. [[Page 33354]] 5-140-310................. Permitting 7/17/02 7/8/03, 68 FR 40520............... authority's and administrator's actionon compliance certifications. ---------------------------------------------------------------------------------------------------------------- Article 5 NOX Allowance Allocations ---------------------------------------------------------------------------------------------------------------- 5-140-400................. State trading 7/17/02 7/8/03, 68 FR 40520............... program budget. 5-140-410................. Timing 7/17/02 7/8/03, 68 FR 40520............... requirements for NOX allowance allocations. 5-140-420................. NOX allowance 7/17/02 7/8/03, 68 FR 40520............... allocations. 5-140-430................. Compliance 7/17/02 7/8/03, 68 FR 40520............... Supplement Pool. ---------------------------------------------------------------------------------------------------------------- Article 6 NOX Allowance Tracking System ---------------------------------------------------------------------------------------------------------------- 5-140-500................. NOX Allowance 7/17/02 7/8/03, 68 FR 40520............... Tracking System accounts. 5-140-510................. Establishment of 7/17/02 7/8/03, 68 FR 40520............... accounts. 5-140-520................. NOX Allowance 7/17/02 7/8/03, 68 FR 40520............... Tracking System responsibilities of NOX authorized account representative. 5-140-530................. Recordation of 7/17/02 7/8/03, 68 FR 40520............... NOX allowance allocations. 5-140-540................. Compliance....... 7/17/02 7/8/03, 68 FR 40520............... 5-140-550................. Banking.......... 3/24/04 8/25/04, 69 FR 52174.............. 5-140-560................. Account error.... 7/17/02 7/8/03, 68 FR 40520............... 5-140-570................. Closing of 7/17/02 7/8/03, 68 FR 40520............... general accounts. ---------------------------------------------------------------------------------------------------------------- Article 7 NOX Allowance Transfers ---------------------------------------------------------------------------------------------------------------- 5-140-600................. Scope and 7/17/02 7/8/03, 68 FR 40520............... submission of NOX allowance transfers. 5-140-610................. EPA recordation.. 7/17/02 7/8/03, 68 FR 40520............... 5-140-620................. Notification..... 7/17/02 7/8/03, 68 FR 40520............... ---------------------------------------------------------------------------------------------------------------- Article 8 Monitoring and Reporting ---------------------------------------------------------------------------------------------------------------- 5-140-700................. General 7/17/02 7/8/03, 68 FR 40520............... Requirements. 5-140-710................. Initial 7/17/02 7/8/03, 68 FR 40520............... certification and recertification procedures. 5-140-720................. Out of control 7/17/02 7/8/03, 68 FR 40520............... periods. 5-140-730................. Notifications.... 7/17/02 7/8/03, 68 FR 40520............... 5-140-740................. Recordkeeping and 7/17/02 7/8/03, 68 FR 40520............... reporting. 5-140-750................. Petitions........ 7/17/02 7/8/03, 68 FR 40520............... 5-140-760................. Additional 7/17/02 7/8/03, 68 FR 40520............... requirements to provide heat input data for allocation purposes. ---------------------------------------------------------------------------------------------------------------- Article 9 Individual Unit Opt-ins ---------------------------------------------------------------------------------------------------------------- 5-140-800................. Applicability.... 7/17/02 7/8/03, 68 FR 40520............... 5-140-810................. General.......... 7/17/02 7/8/03, 68 FR 40520............... 5-140-820................. NOX authorized 7/17/02 7/8/03, 68 FR 40520............... account representative. 5-140-830................. Applying for NOX 7/17/02 7/8/03, 68 FR 40520............... Budget opt-in permit. 5-140-840................. Opt-in process... 7/17/02 7/8/03, 68 FR 40520............... 5-140-850................. NOX Budget opt-in 7/17/02 7/8/03, 68 FR 40520............... permit contents. 5-140-860................. Withdrawal from 7/17/02 7/8/03, 68 FR 40520............... NOX Budget Trading Program. 5-140-870................. Change in 7/17/02 7/8/03, 68 FR 40520............... regulatory status. 5-140-880................. NOX allowance 7/17/02 7/8/03, 68 FR 40520............... allocations to opt-in units. ---------------------------------------------------------------------------------------------------------------- Article 10 State Trading Program Budget and Compliance Pool ---------------------------------------------------------------------------------------------------------------- 5-140-900................. State trading 7/17/02 7/8/03, 68 FR 40520............... program budget. 5-140-910................. Compliance 7/17/02 7/8/03, 68 FR 40520............... supplement pool budget. 5-140-920................. Total electric 7/17/02 7/8/03, 68 FR 40520............... generating unit allocations. 5-140-930................. Total non- 7/17/02 7/8/03, 68 FR 40520............... electric generating unit allocations. ---------------------------------------------------------------------------------------------------------------- [[Page 33355]] Part II NOX Annual Trading Program ---------------------------------------------------------------------------------------------------------------- Article 1 CAIR NOX Annual Trading Program General Provisions ---------------------------------------------------------------------------------------------------------------- 5-140-1010................ Purpose.......... 4/18/07 12/28/07, 72 FR 73602............. 5-140-1020................ Definitions...... 4/18/07 12/28/07, 72 FR 73602............. Except for definition of Nonattainment condition. 5-140-1030................ Measurements, 4/18/07 12/28/07, 72 FR 73602............. abbreviations, and acronyms. 5-140-1040................ Applicability.... 4/18/07 12/28/07, 72 FR 73602............. 5-140-1050................ Retired Unit 4/18/07 12/28/07, 72 FR 73602............. Exemption. 5-140-1060................ Standard 4/18/07 12/28/07, 72 FR 73602............. requirements. 5-140-1070................ Computation of 4/18/07 12/28/07, 72 FR 73602............. time. 5-140-1080................ Appeal procedures 4/18/07 12/28/07, 72 FR 73602............. ---------------------------------------------------------------------------------------------------------------- Article 2 CAIR-designated Representative for CAIR NOX Sources ---------------------------------------------------------------------------------------------------------------- 5-140-1100................ Authorization and 4/18/07 12/28/07, 72 FR 73602............. responsibilities of CAIR- designated representative. 5-140-1110................ Alternate CAIR- 4/18/07 12/28/07, 72 FR 73602............. designated representative. 5-140-1120................ Changing CAIR- 4/18/07 12/28/07, 72 FR 73602............. designated representative and alternate CAIR-designated representative; changes in owners and operators. 5-140-1130................ Certificate of 4/18/07 12/28/07, 72 FR 73602............. representation. 5-140-1140................ Objections 4/18/07 12/28/07, 72 FR 73602............. concerning CAIR- designated representative. 5-140-1150................ Delegation by 4/18/07 CAIR-designated representative and alternate CAIR-designated representative. ---------------------------------------------------------------------------------------------------------------- Article 3 Permits ---------------------------------------------------------------------------------------------------------------- 5-140-1200................ General CAIR NOX 4/18/07 12/28/07, 72 FR 73602............. Annual Trading Program permit requirements. 5-140-1210................ Submission of 4/18/07 12/28/07, 72 FR 73602............. CAIR permit applications. 5-140-1220................ Information 4/18/07 12/28/07, 72 FR 73602............. requirements for CAIR permit applications. 5-140-1230................ CAIR permit 4/18/07 12/28/07, 72 FR 73602............. contents and term. 5-140-1240................ CAIR permit 4/18/07 12/28/07, 72 FR 73602............. revisions. ---------------------------------------------------------------------------------------------------------------- Article 5 CAIR NOX Allowance Allocations ---------------------------------------------------------------------------------------------------------------- 5-140-1400................ CAIR NOX Annual 4/18/07 12/28/07, 72 FR 73602............. trading budgets. 5-140-1410................ Timing 4/18/07 12/28/07, 72 FR 73602............. requirements for CAIR NOX allowance allocations. 5-140-1420................ CAIR NOX 4/18/07 12/28/07, 72 FR 73602............. allowance allocations. 5-140-1430................ Compliance 4/18/07 12/28/07, 72 FR 73602............. supplement pool. ---------------------------------------------------------------------------------------------------------------- Article 6 CAIR NOX Allowance Tracking System ---------------------------------------------------------------------------------------------------------------- 5-140-1510................ Establishment of 4/18/07 12/28/07, 72 FR 73602............. accounts. 5-140-1520................ Responsibilities 4/18/07 12/28/07, 72 FR 73602............. of CAIR- authorized account representative. 5-140-1530................ Recordation of 4/18/07 12/28/07, 72 FR 73602............. CAIR NOX allowance allocations. 5-140-1540................ Compliance with 4/18/07 12/28/07, 72 FR 73602............. CAIR NOX emissions limitation. 5-140-1550................ Banking.......... 4/18/07 12/28/07, 72 FR 73602............. 5-140-1560................ Account error.... 4/18/07 12/28/07, 72 FR 73602............. 5-140-1570................ Closing of 4/18/07 12/28/07, 72 FR 73602............. general accounts. ---------------------------------------------------------------------------------------------------------------- Article 7 CAIR NOX Allowance Transfers ---------------------------------------------------------------------------------------------------------------- 5-140-1600................ Submission of 4/18/07 12/28/07, 72 FR 73602............. CAIR NOX allowance transfers. 5-140-1610................ EPA recordation.. 4/18/07 12/28/07, 72 FR 73602............. 5-140-1620................ Notification..... 4/18/07 12/28/07, 72 FR 73602............. ---------------------------------------------------------------------------------------------------------------- [[Page 33356]] Article 8 Monitoring and Reporting ---------------------------------------------------------------------------------------------------------------- 5-140-1700................ General 4/18/07 12/28/07, 72 FR 73602............. requirements. 5-140-1710................ Initial 4/18/07 12/28/07, 72 FR 73602............. certification and recertification procedures. 5-140-1720................ Out of control 4/18/07 12/28/07, 72 FR 73602............. periods. 5-140-1730................ Notifications.... 4/18/07 12/28/07, 72 FR 73602............. 5-140-1740................ Recordkeeping and 4/18/07 12/28/07, 72 FR 73602............. reporting. 5-140-1750................ Petitions........ 4/18/07 12/28/07, 72 FR 73602............. ---------------------------------------------------------------------------------------------------------------- Article 9 CAIR NOX Opt-in Units ---------------------------------------------------------------------------------------------------------------- 5-140-1800................ Applicability.... .......... 4/18/07........................... 12/28/07, 72 FR 73602 5-140-1810................ General.......... 4/18/07 12/28/07, 72 FR 73602............. 5-140-1820................ CAIR-designated 4/18/07 12/28/07, 72 FR 73602............. representative. 5-140-1830................ Applying for CAIR 4/18/07 12/28/07, 72 FR 73602............. opt-in permit. 5-140-1840................ Opt-in process... 4/18/07 12/28/07, 72 FR 73602............. 5-140-1850................ CAIR opt-in 4/18/07 12/28/07, 72 FR 73602............. permit content. 5-140-1860................ Withdrawal from 4/18/07 12/28/07, 72 FR 73602............. CAIR NOX Annual Trading Program. 5-140-1870................ Change in 4/18/07 12/28/07, 72 FR 73602............. regulatory status. 5-140-1880................ CAIR NOX 4/18/07 12/28/07, 72 FR 73602............. allowance allocations to CAIR NOX opt-in units. ---------------------------------------------------------------------------------------------------------------- Part III NOX Ozone Season Trading Program ---------------------------------------------------------------------------------------------------------------- Article 1 CAIR NOX Ozone Season Trading Program General Provisions ---------------------------------------------------------------------------------------------------------------- 5-140-2010................ Purpose.......... 4/18/07 12/28/07, 72 FR 73602............. 5-140-2020................ Definitions...... 4/18/07 12/28/07, 72 FR 73602............. Except for definition of Nonattainment condition. 5-140-2030................ Measurements, 4/18/07 12/28/07, 72 FR 73602............. abbreviations, and acronyms. 5-140-2040................ Applicability.... 4/18/07 12/28/07, 72 FR 73602............. 5-140-2050................ Retired unit 4/18/07 12/28/07, 72 FR 73602............. exemption. 5-140-2060................ Standard 4/18/07 12/28/07, 72 FR 73602............. requirements. 5-140-2070................ Computation of 4/18/07 12/28/07, 72 FR 73602............. time. 5-140-2080................ Appeal procedures 4/18/07 12/28/07, 72 FR 73602............. ---------------------------------------------------------------------------------------------------------------- Article 2 CAIR-Designated Representative for CAIR NOX Ozone Season Sources ---------------------------------------------------------------------------------------------------------------- 5-140-2100................ Authorization and 4/18/07 12/28/07, 72 FR 73602............. responsibilities of CAIR- designated representative. 5-140-2110................ Alternate CAIR- 4/18/07 12/28/07, 72 FR 73602............. designated representative. 5-140-2120................ Changing CAIR- 4/18/07 12/28/07, 72 FR 73602............. designated representative and alternate CAIR-designated representative; changes in owners and operators. 5-140-2130................ Certificate of 4/18/07 12/28/07, 72 FR 73602............. representation. 5-140-2140................ Objections 4/18/07 12/28/07, 72 FR 73602............. concerning CAIR- designated representative. 5-140-2150................ Delegation by 4/18/07 12/28/07, 72 FR 73602............. CAIR-designated representative and alternate CAIR-designated representative. ---------------------------------------------------------------------------------------------------------------- Article 3 Permits ---------------------------------------------------------------------------------------------------------------- 5-140-2200................ General CAIR NOX 4/18/07 12/28/07, 72 FR 73602............. Ozone Season Trading Program permit requirements. 5-140-2210................ Submission of 4/18/07 12/28/07, 72 FR 73602............. CAIR permit applications. 5-140-2220................ Information 4/18/07 12/28/07, 72 FR 73602............. requirements for CAIR permit applications. 5-140-2230................ CAIR permit 4/18/07 12/28/07, 72 FR 73602............. contents and term. 5-140-2240................ CAIR permit 4/18/07 12/28/07, 72 FR 73602............. revisions. ---------------------------------------------------------------------------------------------------------------- [[Page 33357]] Article 5 CAIR NOX Ozone Season Allowance Allocations ---------------------------------------------------------------------------------------------------------------- 5-140-2400................ CAIR NOX Ozone 4/18/07 12/28/07, 72 FR 73602............. Season trading budgets. 5-140-2405................ State trading 4/18/07 12/28/07, 72 FR 73602............. budgets for nonelectric generating units. 5-140-2410................ Timing 4/18/07 12/28/07, 72 FR 73602............. requirements for CAIR NOX Ozone Season allowance allocations. 5-140-2420................ CAIR NOX Ozone 4/18/07 12/28/07, 72 FR 73602............. Season allowance allocations. 5-140-2430................ CAIR NOX Ozone 4/18/07 12/28/07, 72 FR 73602............. Season allowance allocations for individual existing nonelectric generating units. ---------------------------------------------------------------------------------------------------------------- Article 6 CAIR NOX Ozone Season Allowance Tracking System ---------------------------------------------------------------------------------------------------------------- 5-140-2510................ Establishment of 4/18/07 12/28/07, 72 FR 73602............. accounts. 5-140-2520................ Responsibilities 4/18/07 12/28/07, 72 FR 73602............. of CAIR- authorized account representative. 5-140-2530................ Recordation of 4/18/07 12/28/07, 72 FR 73602............. CAIR NOX Ozone Season allowance allocations. 5-140-2540................ Compliance with 4/18/07 12/28/07, 72 FR 73602............. CAIR NOX emissions limitation. 5-140-2550................ Banking.......... 4/18/07 12/28/07, 72 FR 73602............. 5-140-2560................ Account error.... 4/18/07 12/28/07, 72 FR 73602............. 5-140-2570................ Closing of 4/18/07 12/28/07, 72 FR 73602............. general accounts. ---------------------------------------------------------------------------------------------------------------- Article 7 CAIR NOX Ozone Season Allowance Transfers ---------------------------------------------------------------------------------------------------------------- 5-140-2600................ Submission of 4/18/07 12/28/07, 72 FR 73602............. CAIR NOX Ozone Season allowance transfers. 5-140-2610................ EPA recordation.. 4/18/07 12/28/07, 72 FR 73602............. 5-140-2620................ Notification..... 4/18/07 12/28/07, 72 FR 73602............. ---------------------------------------------------------------------------------------------------------------- Article 8 Monitoring and Reporting ---------------------------------------------------------------------------------------------------------------- 5-140-2700................ General 4/18/07 12/28/07, 72 FR 73602............. requirements. 5-140-2710................ Initial 4/18/07 12/28/07, 72 FR 73602............. certification and recertification procedures. 5-140-2720................ Out of control 4/18/07 12/28/07, 72 FR 73602............. periods. 5-140-2730................ Notifications.... 4/18/07 12/28/07, 72 FR 73602............. 5-140-2740................ Recordkeeping and 4/18/07 12/28/07, 72 FR 73602............. reporting. 5-140-2750................ Petitions........ 4/18/07 12/28/07, 72 FR 73602............. ---------------------------------------------------------------------------------------------------------------- Article 9 CAIR NOX Ozone Season Opt-in Units ---------------------------------------------------------------------------------------------------------------- 5-140-2800................ Applicability.... 4/18/07 12/28/07, 72 FR 73602............. 5-140-2810................ General.......... 4/18/07 12/28/07, 72 FR 73602............. 5-140-2820................ CAIR-designated 4/18/07 12/28/07, 72 FR 73602............. representative. 5-140-2830................ Applying for CAIR 4/18/07 12/28/07, 72 FR 73602............. opt-in permit. 5-140-2840................ Opt-in process... 4/18/07 12/28/07, 72 FR 73602............. 5-140-2850................ CAIR opt-in 4/18/07 12/28/07, 72 FR 73602............. permit contents. 5-140-2860................ Withdrawal from 4/18/07 12/28/07, 72 FR 73602............. CAIR NOX Ozone Season Trading Program. 5-140-2870................ Change in 4/18/07 12/28/07, 72 FR 73602............. regulatory status. 5-140-2880................ CAIR NOX Ozone 4/18/07 12/28/07, 72 FR 73602............. Season allowance allocations to CAIR NOX Ozone Season opt-in units. ---------------------------------------------------------------------------------------------------------------- Part IV SO2 Annual Trading Program ---------------------------------------------------------------------------------------------------------------- Article 1 CAIR SO2 Trading Program General Provisions ---------------------------------------------------------------------------------------------------------------- 5-140-3010................ Purpose.......... 4/18/07 12/28/07, 72 FR 73602............. 5-140-3020................ Definitions...... 4/18/07 12/28/07, 72 FR 73602............. Except for definition of Nonattainment condition. 5-140-3030................ Measurements, 4/18/07 12/28/07, 72 FR 73602............. abbreviations, and acronyms. 5-140-3040................ Applicability.... 4/18/07 12/28/07, 72 FR 73602............. 5-140-3050................ Retired Unit 4/18/07 12/28/07, 72 FR 73602............. Exemption. [[Page 33358]] 5-140-3060................ Standard 4/18/07 12/28/07, 72 FR 73602............. requirements. 5-140-3070................ Computation of 4/18/07 12/28/07, 72 FR 73602............. time. 5-140-3080................ Appeal procedures 4/18/07 12/28/07, 72 FR 73602............. ---------------------------------------------------------------------------------------------------------------- Article 2 CAIR-designated Representative for CAIR SO2 Sources ---------------------------------------------------------------------------------------------------------------- 5-140-3100................ Authorization and 4/18/07 12/28/07, 72 FR 73602............. responsibilities of CAIR- designated representative. 5-140-3110................ Alternate CAIR- 4/18/07 12/28/07, 72 FR 73602............. designated representative. 5-140-3120................ Changing CAIR- 4/18/07 12/28/07, 72 FR 73602............. designated representative and alternate CAIR-designated representative; changes in owners and operators. 5-140-3130................ Certificate of 4/18/07 12/28/07, 72 FR 73602............. representation. 5-140-3140................ Objections 4/18/07 12/28/07, 72 FR 73602............. concerning CAIR- designated representative. 5-140-3150................ Delegation by 4/18/07 12/28/07, 72 FR 73602............. CAIR-designated representative and alternate CAIR-designated representative. ---------------------------------------------------------------------------------------------------------------- Article 3 Permits ---------------------------------------------------------------------------------------------------------------- 5-140-3200................ General CAIR SO2 4/18/07 12/28/07, 72 FR 73602............. Trading Program permit requirements. 5-140-3210................ Submission of 4/18/07 12/28/07, 72 FR 73602............. CAIR permit applications. 5-140-3220................ Information 4/18/07 12/28/07, 72 FR 73602............. requirements for CAIR permit applications. 5-140-3230................ CAIR permit 4/18/07 12/28/07, 72 FR 73602............. contents and term. 5-140-3240................ CAIR permit 4/18/07 12/28/07, 72 FR 73602............. revisions. ---------------------------------------------------------------------------------------------------------------- Article 5 CAIR SO2 Allowance Allocations ---------------------------------------------------------------------------------------------------------------- 5-140-3400................ State trading 4/18/07 12/28/07, 72 FR 73602............. budgets. 5-140-3410................ Timing 4/18/07 12/28/07, 72 FR 73602............. requirements for CAIR SO2 allowance allocations. 5-140-3420................ CAIR SO2 4/18/07 12/28/07, 72 FR 73602............. allowance allocations. ---------------------------------------------------------------------------------------------------------------- Article 6 CAIR SO2 Allowance Tracking System ---------------------------------------------------------------------------------------------------------------- 5-140-3510................ Establishment of 4/18/07 12/28/07, 72 FR 73602............. accounts. 5-140-3520................ Responsibilities 4/18/07 12/28/07, 72 FR 73602............. of CAIR- authorized account representative. 5-140-3530................ Recordation of 4/18/07 12/28/07, 72 FR 73602............. CAIR SO2 allowances. 5-140-3540................ Compliance with 4/18/07 12/28/07, 72 FR 73602............. CAIR SO2 emissions limitation. 5-140-3550................ Banking.......... 4/18/07 12/28/07, 72 FR 73602............. 5-140-3560................ Account error.... 4/18/07 12/28/07, 72 FR 73602............. 5-140-3570................ Closing of 4/18/07 12/28/07, 72 FR 73602............. general accounts. ---------------------------------------------------------------------------------------------------------------- Article 7 CAIR SO2 Allowance Transfers ---------------------------------------------------------------------------------------------------------------- 5-140-3600................ Submission of 4/18/07 12/28/07, 72 FR 73602............. CAIR SO2 allowance transfers. 5-140-3610................ EPA recordation.. 4/18/07 12/28/07, 72 FR 73602............. 5-140-3620................ Notification..... 4/18/07 12/28/07, 72 FR 73602............. ---------------------------------------------------------------------------------------------------------------- Article 8 Monitoring and Reporting ---------------------------------------------------------------------------------------------------------------- 5-140-3700................ General 4/18/07 12/28/07, 72 FR 73602............. requirements. 5-140-3710................ Initial 4/18/07 12/28/07, 72 FR 73602............. certification and recertification procedures. 5-140-3720................ Out of control 4/18/07 12/28/07, 72 FR 73602............. periods. 5-140-3730................ Notifications.... 4/18/07 12/28/07, 72 FR 73602............. 5-140-3740................ Recordkeeping and 4/18/07 12/28/07, 72 FR 73602............. reporting. 5-140-3750................ Petitions........ 4/18/07 12/28/07, 72 FR 73602............. ---------------------------------------------------------------------------------------------------------------- Article 9 CAIR SO2 Opt-in Units ---------------------------------------------------------------------------------------------------------------- 5-140-3800................ Applicability.... 4/18/07 12/28/07, 72 FR 73602............. [[Page 33359]] 5-140-3810................ General.......... 4/18/07 12/28/07, 72 FR 73602............. 5-140-3820................ CAIR-designated 4/18/07 12/28/07, 72 FR 73602............. representative. 5-140-3830................ Applying for CAIR 4/18/07 12/28/07, 72 FR 73602............. opt-in permit. 5-140-3840................ Opt-in process... 4/18/07 12/28/07, 72 FR 73602............. 5-140-3850................ CAIR opt-in 4/18/07 12/28/07, 72 FR 73602............. permit contents. 5-140-3860................ Withdrawal from 4/18/07 12/28/07, 72 FR 73602............. CAIR SO2 Trading Program. 5-140-3870................ Change in 4/18/07 12/28/07, 72 FR 73602............. regulatory status. 5-140-3880................ CAIR SO2 4/18/07 12/28/07, 72 FR 73602............. allowance allocations to CAIR SO2 opt-in units. ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 160 Regulation for General Conformity ---------------------------------------------------------------------------------------------------------------- Part I General Definitions ---------------------------------------------------------------------------------------------------------------- 5-160-10.................. General.......... 1/1/98 1/7/03, 68 FR 663................. 5-160-20.................. Terms Defined.... 1/1/97 10/21/97, 62 FR 54585............. 5-160-20.................. Terms Defined.... 1/1/97, 1/ 1/7/03, 68 FR 663................. Terms revised-- 1/98 Emergency Terms deleted--Adminis trative Process Act, Confidential information, Consent agreement, Consent order, Emergency special order, Formal hearing, Order, Party, Public hearing, Special order, Variance, Virginia Register Act. ---------------------------------------------------------------------------------------------------------------- Part II General Provisions ---------------------------------------------------------------------------------------------------------------- 5-160-30.................. Applicability.... 1/1/97 10/21/97, 62 FR 54585............. 5-160-40.................. Authority of 1/1/97 10/21/97, 62 FR 54585............. board and department. 5-160-80.................. Relationship of 1/1/97 10/21/97, 62 FR 54585............. state regulations to Federal regulations. ---------------------------------------------------------------------------------------------------------------- Part III Criteria and Procedures for Making Conformity Determinations ---------------------------------------------------------------------------------------------------------------- 5-160-110................. General.......... 1/1/97 10/21/97, 62 FR 54585............. Sec. 52.2465(c)(118). 5-160-120................. Conformity 1/1/97 10/21/97, 62 FR 54585............. analysis. 5-160-130................. Reporting 1/1/97 10/21/97, 62 FR 54585............. requirements. 5-160-140................. Public 1/1/97 10/21/97, 62 FR 54585............. participation. 5-160-150................. Frequency of 1/1/97 10/21/97, 62 FR 54585............. conformity determinations. 5-160-160................. Criteria for 1/1/97 10/21/97, 62 FR 54585............. determining conformity. 5-160-170................. Procedures for 1/1/97 10/21/97, 62 FR 54585............. conformity determinations. 5-160-180................. Mitigation of air 1/1/97 10/21/97, 62 FR 54585............. quality impacts. 5-160-190................. Savings provision 1/1/97 10/21/97, 62 FR 54585............. 5-160-200................. Review and 1/1/97 10/21/97, 62 FR 54585............. confirmation of this chapter by board. ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 170 Regulation for General Administration ---------------------------------------------------------------------------------------------------------------- Part I Definitions ---------------------------------------------------------------------------------------------------------------- 5-170-10.................. Use of Terms..... 1/1/98 1/7/03, 68 FR 663................. Split out from 9 VAC 5-10-10. 5-170-20.................. Terms Defined.... 1/1/98 1/7/03, 68 FR 663................. Split out from 9 VAC 5-10-20 and 5-160-20. Terms Added-Public hearing, Regulation of the Board Terms Revised from 4/ 17/95 version- Consent agreement, Consent order, Emergency special order, Order, Owner, Person, Pollutant, Special Order, Source. ---------------------------------------------------------------------------------------------------------------- Part II General Provisions ---------------------------------------------------------------------------------------------------------------- 5-170-30.................. Applicability.... 1/1/98 1/7/03, 68 FR 663................. Split out from 9 VAC 5-20-10. 5-170-60.................. Availability of 1/1/98 1/7/03, 68 FR 663................. Replaces 9 VAC 5- Information. 20-150 and 5-160- 100. ---------------------------------------------------------------------------------------------------------------- [[Page 33360]] Part V Enforcement ---------------------------------------------------------------------------------------------------------------- 5-170-120A.-C............. Enforcement of 1/1/98 1/7/03, 68 FR 663................. Replaces 9 VAC 5- Regulations, 20-30A. D. and 5- Permits and 160-60. Orders. 5-170-130A................ Right of Entry... 1/1/98 1/7/03, 68 FR 663................. Replaces 9 VAC 5- 20-100. ---------------------------------------------------------------------------------------------------------------- Part VI Board Actions ---------------------------------------------------------------------------------------------------------------- 5-170-150................. Local Ordinances. 1/1/98 1/7/03, 68 FR 663................. Replaces 9 VAC 5- 20-60. 5-170-160................. Conditions on 1/1/98 1/7/03, 68 FR 663................. Replaces 9 VAC 5- Approvals. 20-110. 5-170-170................. Considerations 1/1/98 1/7/03, 68 FR 663................. Replaces 9 VAC 5- for Approval 20-140. Actions. ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 200 National Low Emission Vehicle Program ---------------------------------------------------------------------------------------------------------------- 5-200-10.................. Definitions...... 4/14/99 12/28/99, 64 FR 72564............. 5-200-20.................. Participation in 4/14/99 12/28/99, 64 FR 72564............. national LEV. 5-200-30.................. Transition from 4/14/99 12/28/99, 64 FR 72564............. national LEV requirements to a Virginia Sec. 177 program. ---------------------------------------------------------------------------------------------------------------- 9 VAC 5, Chapter 230 Variance for International Paper Franklin Paper Mill ---------------------------------------------------------------------------------------------------------------- 5-230-10.................. Applicability and 9/7/05 8/13/07, 45 FR 45165.............. designation of affected facility. 5-230-20.................. Definitions...... 9/7/05 8/13/07, 45 FR 45165.............. 5-230-30.................. Authority to 9/7/05 8/13/07, 45 FR 45165.............. operate under this chapter and FESOP. 5-230-40 (Except A.7., Sitewide 9/7/05 8/13/07, 45 FR 45165.............. A.9., A.10., and B.2.). Emissions Caps. 5-230-50.................. New Source Review 9/7/05 8/13/07, 45 FR 45165.............. program and registration requirements. 5-230-60 (Except A 1.).... Other regulatory 9/7/05 8/13/07, 45 FR 45165.............. requirements. 5-230-70.................. Federal Operating 9/7/05 8/13/07, 45 FR 45165.............. Permits. 5-230-80.................. FESOP issuance 9/7/05 8/13/07, 45 FR 45165.............. and amendments. 5-230-90.................. Transfer of 9/7/05 8/13/07, 45 FR 45165.............. ownership. 5-230-110................. Termination of 9/7/05 8/13/07, 45 FR 45165.............. authority to operate under this chapter and FESOP. 5-230-120................. Review and 9/7/05 8/13/07, 45 FR 45165.............. confirmation of this chapter by Board. ---------------------------------------------------------------------------------------------------------------- 2 VAC 5, Chapter 480 Regulation Governing the Oxygenation of Gasoline ---------------------------------------------------------------------------------------------------------------- 5-480-10.................. Definitions...... 11/1/93 1/7/03, 68 FR 663................. VR115-04-28, Sec. 1. 5-480-20.................. Applicability.... 11/1/96 2/17/00, 65 FR 8051............... 5-480-30.................. Minimum oxygenate 11/1/93 1/7/03, 68 FR 663................. VR115-04-28, Sec. content. 3. 5-480-40.................. Nature of 11/1/93 1/7/03, 68 FR 663................. VR115-04-28, Sec. oxygenates. 4. 5-480-50.................. Record keeping 11/1/93 1/7/03, 68 FR 663................. VR115-04-28, Sec. and transfer 5. requirements. 5-480-60.................. Gasoline pump 11/1/93 1/7/03, 68 FR 663................. VR115-04-28, Sec. labeling. 6. 5-480-70.................. Sampling, testing 11/1/93 1/7/03, 68 FR 663................. VR115-04-28, Sec. and oxygen 7. content calculations. 5-480-80.................. Compliance and 11/1/93 1/7/03, 68 FR 663................. VR115-04-28, Sec. enforcement. 8. ---------------------------------------------------------------------------------------------------------------- Code of Virginia ---------------------------------------------------------------------------------------------------------------- Section 10.1-1316.1A. Severe ozone 7/1/04 12/29/04, 69 FR 77909............. Provision Through D. nonattainment authorizes the areas; fees. Department of Environmental Quality (DEQ) to collect Federal penalty fees from major stationary sources if the nonattainment area does not attain the ozone standard by the statutory attainment date. ---------------------------------------------------------------------------------------------------------------- (d) EPA-Approved State Source-Specific Requirements [[Page 33361]] EPA-Approved Source Specific Requirements ---------------------------------------------------------------------------------------------------------------- Permit/order or State Source name registration effective EPA approval date 40 CFR part 52 number date citation ---------------------------------------------------------------------------------------------------------------- Norfolk Naval Base-Exchange [NONE]........... 8/6/79 8/17/81, 46 FR 41499.......... 52.2465(c)(41). Service Station. Reynolds Metals Co.-Rolling DSE-597-87....... 9/30/87 8/20/90, 55 FR 33904.......... 52.2465(c)(92). Mill. Aqualon (Hercules) Company.... 50363............ 9/26/90 11/1/91, 56 FR 56159.......... 52.2465(c)(93). Nabisco Brands, Inc........... DTE-179-91....... 4/24/91 3/6/92, 57 FR 8080............ 52.2465(c)(95). Reynolds Metals Co.-Bellwood.. DSE-413A-86...... 10/31/86 6/13/96, 61 FR 29963.......... 52.2465(c)(110). Reynolds Metals Co.-Richmond DSE-412A-86...... 10/31/86 6/13/96, 61 FR 29963.......... 52.2465(c)(110). Foil Plant. Philip Morris, Inc.--Blended 50080............ 2/27/86 10/14/97, 62 FR 53277......... 52.2465(c)(120). Leaf Facility. Philip Morris, Inc.--Park 500 50722............ 3/26/97 10/14/97, 62 FR 53277......... 52.2465(c)(120). Facility. Philip Morris, Inc.--Richmond 50076............ 7/13/96 10/14/97, 62 FR 53277......... 52.2465(c)(120). Manufacturing Center. Virginia Electric and Power 50396............ 5/30/96 10/14/97, 62 FR 53277......... 52.2465(c)(120). Co.--Innsbrook Technical Center. Hercules, Inc.-Aqualon V-0163-96........ 7/12/96 10/14/97, 62 FR 53277......... 52.2465(c)(120). Division. City of Hopewell-Regional 50735............ 5/30/96 10/14/97, 62 FR 53277......... 52.2465(c)(120). Wastewater Treatment Facility. Allied Signal, Inc.-Hopewell 50232............ 3/26/97 10/14/97, 62 FR 53277......... 52.2465(c)(121). Plant. Allied Signal, Inc.- V-0114-96........ 5/20/96 10/14/97, 62 FR 53277......... 52.2465(c)(121). Chesterfield Plant. Bear Island Paper Co. L.P..... V-0135-96........ 7/12/96 10/14/97, 62 FR 53277......... 52.2465(c)(121). Stone Container Corp.-- 50370............ 5/30/96 10/14/97, 62 FR 53277......... 52.2465(c)(121). Hopewell Mill. E.I. Dupont de Nemours and V-0117-96........ 5/30/96 10/14/97, 62 FR 53277......... 52.2465(c)(121). Co.--Spruance Plant. ICI Americas Inc.--Films 50418............ 5/30/96 10/14/97, 62 FR 53277......... 52.2465(c)(121). Division-Hopewell Site. Tuscarora, Inc................ 71814............ 6/5/96 1/22/99, 64 FR 3425........... 52.2465(c)(128). Potomac Electric Power Company Registration No. 9/18/00 12/14/00, 65 FR 78100......... 52.2420(d)(2). (PEPCO)-Potomac River 70228; County- Generating Station [Permit to Plant No. 510- Operate]. 0003. Virginia Power (VP)--(Possum Registration No. 9/26/00 12/14/00, 65 FR 78100......... 52.2420(d)(2). Point Generating Station 70225; County- [Permit to Operate]. Plant No. 153- 0002. Cellofoam North America, Inc.-- Registration No. 8/10/98 1/02/01, 66 FR 8.............. 52.2420(d)(3). Falmouth Plant [Consent 40696; FSO-193- Agreement]. 98. CNG Transmission Corporation-- Registration No. 5/22/00 1/02/01, 66 FR 8.............. 52.2420(d)(3). Leesburg Compressor Station 71978; County- [Permit to Operate]. Plant No. 107- 0101. Columbia Gas Transmission Registration No. 5/23/00 1/02/01, 66 FR 8.............. 52.2420(d)(3). Company--Loudoun County 72265; County- Compressor Station [Permit to Plant No. 107- Operate]. 0125. District of Columbia's Registration No. 12/10/99 1/02/01, 66 FR 8.............. 52.2420(d)(3). Department of Corrections-- 70028; County- Lorton Correctional Facility Plant No. 0059- [Permit to Operate]. 0024. Michigan Cogeneration Systems, Registration No. 5/10/00 1/02/01, 66 FR 8.............. 52.2420(d)(3). Inc.--Fairfax County I-95 71961; County- Landfill [Permit to Operate]. Plant No. 0059- 0575. Metropolitan Washington Registration No. 5/22/00 1/02/01, 66 FR 8.............. 52.2420(d)(3). Airports Authority--Ronald 70005; County- Reagan Washington National Plant No. 0013- Airport [Permit to Operate]. 0015. Norman M. Cole, Jr., Pollution Registration No. 12/13/99 1/02/01, 66 FR 8.............. 52.2420(d)(3). Control Plant [Consent 70714. Agreement]. Ogden Martin Systems of Registration No. 7/31/98 1/02/01, 66 FR 8.............. 52.2420(d)(3). Alexandria/Arlington, Inc. 71895; NVRO-041- [Consent Agreement]. 98. Ogden Martin Systems of Registration No. 4/3/98 1/02/01, 66 FR 8.............. 52.2420(d)(3). Fairfax, Inc. [Consent 71920. Agreement]. U.S. Department of Defense-- Registration No. 5/17/00 1/02/01, 66 FR 8.............. 52.2420(d)(3). Pentagon Reservation [Permit 70030; County- to Operate]. Plant No. 0013- 0188. [[Page 33362]] Potomac Electric Power Company Registration No. 7/31/98 1/02/01, 66 FR 8.............. 52.2420(d)(3), (PEPCO)--Potomac River 70228; NVRO-106- NOX RACT Generating Station [Consent 98. requirements. Agreement]. Potomac Electric Power Company Registration No. 5/8/00 1/02/01, 66 FR 8.............. 52.2420(d)(3) VOC (PEPCO)--Potomac River 70228; County RACT Generating Station. Plant No. 510- requirements. 0003. United States Marine Corps.-- Registration No. 5/24/00 1/02/01, 66 FR 8.............. 52.2420(d)(3). Quantico Base [Permit to 70267; County- Operate]. Plant No. 153- 0010. Transcontinental Gas Pipeline Registration No. 9/5/96 1/02/01, 66 FR 8.............. 52.2420(d)(3). Corporation--Compressor 71958. Station No.185 [Consent Agreement]. U.S. Army Garrison at Fort Registration No. 5/16/00 1/02/01, 66 FR 8.............. 52.2420(d)(3). Belvoir [Permit to Operate]. 70550; County- Plant No. 059- 0018. Virginia Power (VP)--(Possum Registration No. 7/21/00 1/02/01, 66 FR 8.............. 52.2420(d)(3). Point Generating Station 70225; County- [Permit containing NOX RACT Plant No. 153- requirements]. 0002. Virginia Electric and Power Registration No. 6/12/95 1/02/01, 66 FR 8.............. 52.2420(d)(3). Company--Possum Point 70225. Generating Station [Consent Agreement containing VOC RACT requirements]. Washington Gas Light Company-- Registration No. 4/3/98 1/02/01, 66 FR 8.............. 52.2420(d)(3). Springfield Operations Center 70151; NVRO-031- [Consent Agreement]. 98. Georgia Pacific--Jarratt Registration No. 9/28/98 3/26/03, 68 FR 14542.......... 40 CFR Softboard Plant. 50253. 52.2420(d)(4); Note: In Section E, Provision 1, the portion of the text which reads `` * * * and during periods of start- up, shutdown, and malfunction.'' is not part of the SIP. Prince William County Landfill Registration No. 4/16/04 9/9/04, 69 FR 54581........... 52.2420(d)(5). 72340. Washington Gas Company, Registration No. 4/16/04 10/6/04, 69 FR 59812.......... 52.2420(d)(6). Ravensworth Station. 72277. 8/11/04 Central Intelligence Agency Registration No. 4/16/04 12/13/04, 69 FR 72115......... 52.2420(d)(6). (CIA), George Bush Center for 71757. Intelligence. National Reconnaissance Registration No. 4/16/04 12/13/04, 69 FR 72115......... 52.2420(d)(6). Office, Boeing Service Center. 71988. Roanoke Electric Steel Corp... Registration No. 12/22/04 4/27/05, 70 FR 21621.......... 52.2420(d)(7). 20131. Roanoke Cement Company........ Registration No. 12/22/04 4/27/05, 70 FR 21621.......... 52.2420(d)(7). 20232. Global Stone Chemstone Registration No. 02/9/05 4/27/05, 70 FR 21621.......... 52.2420(d)(7). Corporation. 80504. Kraft Foods Global, Inc.-- Registration No. 9/19/07 4/15/08, 73 FR 20175.......... 52.2420(d)(8). Richmond Bakery. 50703. Transcontinental Pipeline Registration No. 1/24/07 10/30/08, 73 FR 64551......... 52.2420(d)(9). Station 165. 30864. Transcontinental Pipeline Registration No. 1/24/07 10/30/08, 73 FR 64551......... 52.2420(d)(9). Station 170. 30863. Transcontinental Pipeline Registration No. 1/30/07 10/30/08, 73 FR 64551......... 52.2420(d)(9). Station 175. 40789. Transcontinental Pipeline Registration No. 2/13/07 10/30/08, 73 FR 64551......... 52.2420(d)(9). Station 180. 40782. Roanoke Cement Corporation.... Registration No. 6/18/07 10/30/08, 73 FR 64551......... 52.2420(d)(9). 20232. Reynolds Consumer Products Registration No. 10/1/08 3/25/09, 74 FR 12572.......... 52.2420(d)(12). Company. 50534. The SIP effective date is 5/26/09. ---------------------------------------------------------------------------------------------------------------- (e) EPA-approved nonregulatory and quasi-regulatory material. [[Page 33363]] ---------------------------------------------------------------------------------------------------------------- State Name of non-regulatory SIP Applicable submittal EPA approval date Additional revision geographic area date explanation ---------------------------------------------------------------------------------------------------------------- Commitment Letter--Clean fuel Northern 1/25/93 9/23/93, 58 FR 50846............. 52.2423(j). fleet or alternative Virginia Ozone substitute program. nonattainment Area. 9 VAC 5-60-100 (adopts 40 CFR Statewide....... 10/9/98 11/3/99, 64 FR 59648............. 52.2423(q). 63.460 through 63.469 by reference). Documents Incorporated by Statewide....... 4/12/89 8/23/95, 60 FR 43714............. 52.2423(m). Reference. Documents Incorporated by Statewide....... 2/12/93 8/23/95, 60 FR 43714............. 52.2423(n). Reference. Documents Incorporated by Statewide....... 6/22/99 1/7/03, 68 FR 663................ 52.2423(r). Reference (9 VAC 5-20-21, Section E). Documents Incorporated by Statewide....... 2/23/04 6/8/04, 69 FR 31893.............. 52.2423(s). Reference (9 VAC 5-20-21, paragraph E.12). Documents Incorporated by Northern 3/24/04 5/12/05, 70 FR 24970............. 9 VAC 5-20-21, Reference. Virginia VOC Sections Emissions E.1.a.(7)., Control Area E.4.a.(12) designated in 9 through a.(17), VAC 5-20-206. E.10., E.11., E.13.a.(1), and E.13.a.(2). Documents Incorporated by Statewide....... 8/25/05 3/3/06, 71 FR 10838.............. State effective Reference (9 VAC 5-20-21, date is 2/1/00. Sections D., E. (introductory sentence), E.2 (all paragraphs), E.3.b, E.4.a.(1) and (2), E.4.b., E.5. (all paragraphs), and E.7. (all paragraphs)). Documents Incorporated by Statewide....... 10/25/05 3/3/06, 71 FR 10838.............. State effective Reference (9 VAC 5-20-21, date is 3/9/05; Section B. approval is for those provisions of the CFR which implement control programs for air pollutants related to the national ambient air quality standards (NAAQS) and regional haze. Documents Incorporated by Northern 10/25/05 1/30/07, 72 FR 4207.............. State effective Reference. Virginia VOC date is 3/9/05. Emissions 9 VAC 5-20-21, Control Area Sections designated in 9 E.1.a.(16)., VAC 5-20-206. E.4.a.(18) through a.(20), E.6.a, E.11.a.(3), E.12.a.(5) through a.(8), E.14.a. and E.14.b. Documents Incorporated by Fredericksburg 05/14/07 12/5/07, 72 FR 68511............. State effective Reference (9 VAC 5-20-21, VOC Emissions date is 10/04/ Paragraphs E.4.a. (21) and Control Area 06. (22)). Designated in 9 VAC 5-20-206. Motor vehicle emissions Hampton Roads 8/29/96 6/26/97, 62 FR 34408............. 52.2424(a). budgets. Ozone Maintenance Area. Motor vehicle emissions Richmond Ozone 7/30/96 11/17/97, 62 FR 61237............ 52.2424(b). budgets. Maintenance Area. 1990 Base Year Emissions Metropolitan 11/1/93 1/30/96, 61 FR 2931.............. 52.2425(a). Inventory-Carbon Monoxide Washington Area. 4/3/95 (CO). 10/12/95 1990 Base Year Emissions Richmond- 11/11/92 9/16/96, 61 FR 48657............. 52.2425(b). Inventory-Carbon Monoxide Petersburg, 11/18/92 (CO), oxides of nitrogen Norfolk- 11/1/93 (NOX), & volatile organic Virginia Beach, 12/15/94 compounds (VOC). and Smyth County Ozone Areas. 1990 Base Year Emissions Northern 11/30/92 9/16/96, 61 FR 54656............. 52.2425(c). Inventory-Carbon Monoxide Virginia 11/1/93 (CO), oxides of nitrogen (Metropolitan 4/3/95 (NOX), & volatile organic Washington) compounds (VOC). Ozone Nonattainment Area. 1990 Base Year Emissions Northern 12/17/97 7/8/98, 63 FR 36854.............. Inventory-oxides of nitrogen Virginia (NOX), & volatile organic (Metropolitan compounds (VOC). Washington) Ozone Nonattainment Area. Photochemical Assessment Northern 11/15/94 9/11/95, 60 FR 47081............. 52.2426. Monitoring Stations (PAMS) Virginia Program. (Metropolitan Washington) Ozone Nonattainment Area. Attainment determination of Richmond Ozone 7/26/96 10/6/97, 62 FR 52029............. 52.2428(a). the ozone NAAQS. Nonattainment Area. [[Page 33364]] 15% rate of progress plan.... Northern 4/14/98 10/6/00, 65 FR 59727............. 52.2428(b). Virginia (Metropolitan Washington) Ozone Nonattainment Area. Small business stationary Statewide....... 11/10/92 2/14/94, 59 FR 5327.............. 52.2460. source technical and environmental assistance program. Establishment of Air Quality Statewide....... 3/24/80 12/5/80, 45 FR 86530............. 52.2465(c)(38). Monitoring Network. Lead (Pb) SIP................ Statewide....... 12/31/80 3/21/82, 45 FR 8566.............. 52.2465(c)(61). Carbon Monoxide Maintenance Arlington County 10/4/95 1/30/96, 61 FR 2931.............. 52.2465(c)(107). Plan. & Alexandria City. 3/22/04 04/04/05, 70 FR 16958............ Revised Carbon Monoxide Maintenance Plan Base Year Emissions Inventory using MOBILE6. Ozone Maintenance Plan, Hampton Roads 8/27/96 6/26/97, 62 FR 34408............. 52.2465(c)(117). emissions inventory & Area. contingency measures. Ozone Maintenance Plan, Richmond Area... 7/26/96 11/17/97, 62 FR 61237............ 52.2465(c)(119). emissions inventory & contingency measures. Non-Regulatory Voluntary Washington, DC, 2/25/04 5/12/05, 70 FR 24987............. The Emission Reduction Program. severe 1-hour nonregulatory ozone measures found nonattainment in section 7.6 area. and Appendix J of the plan. 1996-1999 Rate-of-Progress Washington 1- 12/29/03 5/16/05, 70 FR 25688............. Only the TCMs in Plan SIP and the hour ozone 5/25/99 Appendix H of Transportation Control nonattainment the 5/25/1999 Measures (TCMs) in Appendix area. revision, 1999 H. motor vehicle emissions budgets of 128.5 tons per day (tpy) of VOC and 196.4 tpy of NOX. 1990 Base Year Inventory Washington 1- 8/19/03 5/16/05, 70 FR 25688............. Revisions. hour ozone 2/25/04 nonattainment area. 1999-2005 Rate-of-Progress Washington 1- 8/19/03 5/16/05, 70 FR 25688............. Only the TCMs in Plan SIP Revision and the hour ozone 2/25/04 Appendix J of Transportation Control nonattainment the 2/25/2004 Measures (TCMs) in Appendix area. revision, 2002 J. motor vehicle emissions budgets (MVEBs) of 125.2 tons per day (tpy) for VOC and 290.3 tpy of NOX, and, 2005 MVEBs of 97.4 tpy for VOC and 234.7 tpy of NOX. VMT Offset SIP Revision...... Washington 1- 8/19/03 5/16/05, 70 FR 25688............. hour ozone 2/25/04 nonattainment area. Contingency Measure Plan..... Washington 1- 8/19/03 5/16/05, 70 FR 25688............. hour ozone 2/25/04 nonattainment area. 1-Hour Ozone Modeled Washington 1- 8/19/03 5/16/05, 70 FR 25688............. 2005 motor Demonstration of Attainment hour ozone 2/25/04 vehicle and Attainment Plan. nonattainment emissions area. budgets of 97.4 tons per day (tpy) for VOC and 234.7 tpy of NOX. Attainment Demonstration and Botetourt 12/21/04 8/17/05, 70 FR 43277............. Early Action Plan for the County, Roanoke 2/15/05 Roanoke MSA Ozone Early City, Roanoke Action Compact Area. County, and Salem City. Attainment Demonstration and City of 12/20/04 8/17/05, 70 FR 43280............. Early Action Plan for the Winchester and 02/15/05 Northern Shenandoah Valley Frederick Ozone Early Action Compact County. Area. 8-Hour Ozone Maintenance Plan City of 5/4/05 12/23/05, 70 FR 76165............ for the Fredericksburg VA Fredericksburg, Area. Spotsylvania County, and Stafford County. 8-Hour Ozone Maintenance Plan Madison County 9/23/05 1/3/05, 71 FR 24................. for the Madison & Page Cos. (part) and Page (Shenandoah NP), VA Area. County (part). 8-Hour Ozone Maintenance Plan Norfolk-Virginia 10/12/06 6/1/07, 72 FR 30490.............. The SIP and 2002 Base Year Emissions Beach-Newport 10/16/06 effective date Inventory. News (Hampton 10/18/06 is 6/1/07. Roads), VA Area. 11/20/06 2/13/07 8-Hour Ozone Maintenance Plan Richmond- 9/18/06 6/1/07, 72 FR 30485.............. The SIP and 2002 Base Year Emissions Petersburg VA 9/20/06 effective date Inventory. Area. 9/25/06 is 6/18/07. 11/17/06 2/13/07 [[Page 33365]] Ozone Maintenance Plan....... White Top 8/6/07 4/29/08, 73 FR 23103............. Mountain, Smyth County, VA 1- hour Ozone Nonattainment Area. RACT under the 8-Hour NAAQS.. Stafford County. 4/21/08 12/22/08, 73 FR 78192............ ---------------------------------------------------------------------------------------------------------------- [FR Doc. E9-16366 Filed 7-10-09; 8:45 am] BILLING CODE 6560-60-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)