NUCLEAR REGULATORY COMMISSION Federal Emergency Management Agency Draft Document: Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants (Criteria for Emergency Planning in an Early Site Permit Application) The Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) have jointly prepared guidance for the development, review, and approval of emergency information and plans to be submitted with an early site permit (ESP) application in a proposed Supplement 2 to NUREG-0654/FEMA-REP-1, Rev. 1, entitled, ``Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants (Criteria for Emergency Planning in an Early Site Permit Application).'' This document is available for public review and comment. The NRC staff's views on how emergency planning will be addressed at each phase of nuclear power plant licensing under 10 CFR Part 52: ESPs, standard design certifications, and combined licenses, are discussed in a Commission paper, ``Emergency Planning Under 10 CFR Part 52,'' SECY-95-090, issued on April 11, 1995. A draft of this paper was noticed for comment in the Federal Register on May 20, 1994 (59 FR 26530).
For ESP applications, Subpart A to 10 CFR Part 52 states requirements and procedures for issuing an ESP that approves a site for one or more nuclear power plants separate from the filing of an application for a construction permit or a combined license. The application for an ESP must, as a minimum, identify physical characteristics unique to the proposed site, such as limitations on egress from the area surrounding the site, that could pose a significant impediment to the development of emergency plans. In addition, the application must include a description of contacts and arrangements made with local, State, and Federal government agencies that have emergency planning responsibilities. The application may also propose major features of the emergency plans, such as the exact size of the emergency planning zones, that can be reviewed and approved by the NRC in consultation with FEMA, or may propose complete and integrated emergency plans for the site for review and approval by the NRC in consultation with FEMA.
Proposed Supplement 2 to NUREG-0654/FEMA-REP-1 provides guidance for meeting the mandatory emergency planning requirement and for addressing the two additional emergency planning options of the ESP rule. The proposed supplement recommends an approach for an ESP applicant to identify unique site physical characteristics that could be an impediment to the development of emergency plans. An ESP applicant that chooses the option of proposing major features of the emergency plans will be evaluated against selected and modified planning standards and evaluation criteria from NUREG-0654/FEMA-REP-1 which are given in proposed Supplement 2. An applicant for an ESP that chooses the option of submitting complete and integrated emergency plans for review and approval will be [[Page 24308]] evaluated against the applicable provisions of 10 CFR 50.47 and Appendix E to 10 CFR Part 50, and the full evaluation criteria of NUREG-0654/FEMA-REP-1.
The regulations in 10 CFR Part 52 do not include a requirement for updating emergency planning information and plans approved as part of an ESP. The NRC staff discussed this matter in the final Commission paper on 10 CFR Part 52 and indicated that it would be deferred until a review is conducted to determine any necessary revisions to Part 52 after the first standard design certification rulemakings are completed.
Comments on Draft Supplement 2 to NUREG-0654/FEMA-REP-1 may be submitted for consideration by the NRC and FEMA staffs. Comments should be submitted within 120 days of the date of this Federal Register notice to: Chief, Rules Review and Directives Branch, U.S. Nuclear Regulatory Commission, Mail Stop T-6D59, Washington, DC 20555-0001. Comments may also be delivered to 11545 Rockville Pike, Rockville, Maryland, between 7:45 am and 4:15 pm on Federal workdays. For a copy of the Draft Supplement 2 to NUREG-0654/FEMA-REP-1, write: Distribution Services, Printing and Mail Services Branch, Office of Administration, U.S. Nuclear Regulatory Commission, Washington DC 20555. A copy of Draft Supplement 2 to NUREG-0654/FEMA-REP-1 is available for inspection and copying for a fee in the NRC Public Document Room, Gelman Building, 2120 L Street NW., Washington, DC 20555.
For further information contact: Falk Kantor, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Telephone: (301) 415-2907, or Nancy Goldstein, Preparedness, Training and Exercises Directorate, Federal Emergency Management Agency, Washington, DC 20472. Telephone: (202) 646-4285. Dated at Rockville, Maryland, this 25th day of April 1996. For the Nuclear Regulatory Commission. Dennis M. Crutchfield,
Director, Division of Reactor Program Management, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission. For the Federal Emergency Management Agency Kay C. Goss,
Associate Director for Preparedness, Training, and Exercises, Federal Emergency Management Agency.
[FR Doc. 96-12042 Filed 5-13-96; 8:45 am] BILLING CODE 7590-01-P