Bald Mountain Mine Expansion Project Draft Environmental Impact Statement
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
Bald Mountain Mine Expansion Project Draft Environmental Imp
[Federal Register: April 19, 1995]
DEPARTMENT OF THE INTERIOR
[NV-040-1990-01; M46-83-004P]Bald Mountain Mine Expansion Project Draft Environmental Impact Statement
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of availability.
SUMMARY: Pursuant to Section 102(2)(c) of the National Environmental Policy Act, notice is given that the Ely District of the Bureau of Land Management has prepared, by a third party contractor, a Draft Environmental Impact Statement on Placer Dome U.S. Bald Mountain Mine Expansion Project in eastern Nevada. This document is available for public review for a 45 day period.
DATES AND ADDRESSES: Written comments on the Draft Environmental Impact Statement must be postmarked by June 16, 1995. Public meetings to receive oral and written comments have been scheduled for the dates and places listed below. All meetings will begin at 7:00 p.m. each evening.
<bullet> May 8, 1995--at the Ely Bureau of Land Management District Office, 702 Industrial Way, Ely, NV 89301. <bullet> May 9, 1995--Stockman's Motor Hotel, 340 Commercial St., Elko, Nevada 89803.
<bullet> May 10, 1995--Sands Regency Hotel Casino, 345 N. Arlington Ave., Reno, Nevada 89501.
<bullet> A copy of the Draft Environmental Impact Statement can be obtained from: Bureau of Land Management, Ely District Office, ATTN: Dan Netcher, Project Leader, HC 33 Box 33500, Ely, NV 89301. <bullet> The Draft Environmental Impact Statement is available for inspection at the following additional locations: Bureau of Land Management, Nevada State Office, 850 Harvard Way, Reno, NV 89520; Eureka, White Pine and Elko County Libraries; and the University of Nevada libraries in Reno and Las Vegas.FOR FURTHER INFORMATION CONTACT:
Dan Netcher, Project Leader at the above Ely District Office address or telephone (702) 289-1800.SUPPLEMENTARY INFORMATION: The Draft Environmental Impact Statement analyzes the potential environmental impacts that could result from the expansion of the current gold mining operations at Bald Mountain Mine and development of the Horseshoe/Galaxy Mine (Proposed Action) and reasonable alternatives. Alternatives analyzed consist of: (1) no action; (2) haul road design; (3) waste rock dump configurations; and (4) reclamation options. The project would involve construction and operation of a new mine at Horseshoe/Galaxy with open pits, crushing facilities, waste dumps, conventional heap leaching facilities and several ancillary facilities. The Bald Mountain Mine expansion would consist of modification of the processing circuit with a wet crushing circuit that would produce a split flow of ore, and the processing facility would consist of both heap leaching and carbon-in-leach facilities with associated tailings. The Bald Mountain Mine expansion would also consist of expansion of the current Top Pit and development of the Sage Pit with corresponding waste rock dumps.
Dated: April 4, 1995.
Ann J. Morgan,
State Director, Nevada.
[FR Doc. 95-9621 Filed 4-18-95; 8:45 am] BILLING CODE 4310-HC-M
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)