Federal Energy Regulatory Commission
[Docket Nos. CP95-170-000 and CP95-181-000]

Columbia Gas Transmission Corp.; Notice of Intent To Prepare Environmental Assessments for the Proposed Coco Transmission Project and Coco Storage Field Project and Request for Comments on Environmental Issues

February 9, 1995
The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare environmental assessments (EAs) that will discuss the environmental impacts of the construction and operation of the facilities proposed in the Coco Transmission Project and Coco Storage Field Project.\1\ The EAs will be used by the Commission in its decision-making process to determine whether an environmental impact statement is necessary and whether to approve the projects.

\1\Columbia Gas Transmission Corporation's applications were filed with the Commission under Sections 7(b) and 7(c) of the Natural Gas Act.


Summary of the Proposed Projects

The facilities proposed to be replaced are currently in an unsafe condition due to corrosion and old age. Replacement is necessary this year in order to provide service in the upcoming winter of 1995/1996. Coco Transmission Project (Docket No. CP95-170-000): Columbia Gas Transmission Corporation (Columbia) proposes to construct 6.8 miles of 30-inch-diameter replacement pipeline in Kanawha County, West Virginia. The new pipeline would replace the two deteriorating 20-inch-diameter Lines X52-M1 and X52-M1-Loop, which are in the same location. Columbia would use the facilities to transport up to 606,000,000 cubic feet per day of natural gas. Coco Storage Field Project (Docket No. CP95-181-000): Columbia proposes to construct 10.9 miles of various 4- to 20-inchdiameter replacement pipeline and appurtenant facilities within the existing Coco ``A'' Storage Field in Kanawha County, West Virginia. The new pipeline would replace 15.7 miles of deteriorating pipeline, ranging in size from 4- to 16-inch-diameter, including two looped segments of mainline, and gathering lines for wells. Columbia would also replace and install appurtenant facilities consisting of wellhead piping and measurement facilities for 29 existing wells; install an on-line pigging system on the new 10-and 20- inch-diameter pipelines; and install fluid gathering facilities and about 12 miles of 1- and 2-inch-diameter pressurized methanol pipeline injecting system that would connect to each well. The locations of these facilities are shown in appendix 1.\2\

\2\The appendices referenced in this notice are not being printed in the Federal Register. Copies are available from the Commission's Public Reference and Files Maintenance Branch, Room 3104, 941 North Capitol Street, N.E., Washington, D.C. 20426, or call (202) 208-1371. Copies of the appendices were sent to all those receiving this notice in the mail.


Land Requirements for Construction

The proposed project would be built within and adjacent to existing rights-of-way. Columbia intends to use a construction right-of-way that would vary between 25 and 120 feet during construction. Following construction, 50 feet would be maintained as permanent right-of-way, and the rest would revert back to the landowner. [[Page 9027]]

The EPA Process

The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us to discover and address concerns the public may have about proposals. We call this ``scoping''. The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this Notice of Intent, the Commission requests public comments on the scope of the issues it will address in the Eas. All comments received are considered during the preparation of the Eas. State and local government representatives are encouraged to notify their constituents of these proposed actions and encourage them to comment on their areas of concern.
The Eas will discuss impacts that could occur as a result of the construction and operation of the proposed projects under these general headings:
<bullet> Geology and soils.
<bullet> Water resources, fisheries. <bullet> Land use
<bullet> Cultural resources and wetlands.\3\

\3\According to the applicant, the project will not affect any waters of the United States. We will report any potential impacts, or their absence, under this heading.


<bullet> Vegetation and wildlife. <bullet> Endangered and threatened species. <bullet> Public safety.
<bullet> Haardous waste.
We will also evaluate possible alternatives to the proposed projects or portions of the projects, and make recommendations on how to lessen or avoid impacts on the various resource areas. Our independent analysis of the issues will be in the Eas. Depending on the comments received during the scoping process, the Eas may be published and mailed to Federal, state, and local agencies, public interest groups, interested individuals, affected landowners, newspapers, libraries, and the Commissions official service list for each proceeding. A comment period will be allotted for review if the Eas are published. We will consider all comments on the Eas before we recommend that the Commission approve or not approve the project.

Currently Identified Environmental Issues

We have already identified several issues that we think deserve attention based on a preliminary review of the proposed facilities and the environmental information provided by Columbia. Keep in mind that this is a preliminary list.The list of issues may be added to, subtracted from, or changed based on your comments and our analysis. Issues are:
Coco Transmission Project (Docket No. CP95-170-000): <bullet> The project would cross four perennial streams and five wetlands.
<bullet> The project would cross or be near cultural resources/ archaeological sites.
Coco Storage Filed Project (Docket No. CP95-181-000): <bullet> The project would cross six perennial streams at 13 locations, and 18 wetlands.
<bullet> The project would cross or be near cultural resources/ archaeological sites.

Public Participation

You can make a difference by sending a letter addressing your specific comments or concerns about the project. You should focus on the potential environmental effects of the proposal, alternatives to the proposal (including alternative locations/routes), and measures to avoid or lessen environmental impact. The more specific your comments, the more useful they will be. Please follow the instructions below to ensure that your comments are received and properly recorded: <bullet> Address your letter to: Lois Cashell, Secretary, Federal Energy Regulatory Commission, 825 North Capitol Street, NE., Washington, D.C. 20426.
<bullet> Reference Docket No. CP95-170-000 and/or CP95-181-000; <bullet> Send a copy of your letter to: For the Coco Transmission Project (Docket No. CP95-170-000): Mr. Jeff Shenot, EA Project Manager, Federal Energy Regulatory Commission, 825 North Capitol Street NE., Room 7312, Washington, D.C. 20426; and/ or.
For the Coco Storage Field Project (Docket No. CP95-181-000): Ms. Medha Kochhar, EA Project Commission, Federal Energy Regulatory Commission, 825 North Capitol Street NE., Room 7312, Washington, D.C. 20426; and
<bullet> Mail your comments so that they will be received in Washington, D.C. on or before March 20, 1995. If you wish to receive a copy of the EA, you should request one from Mr. Shenot or Ms. Kochhar, for Docket Nos. CP95-170-000 and CP95- 181-000, respectively, at the above addresses.

Becoming an Intervenor

In addition to involvement in the EA scoping process, you may want to become an official party to the proceeding or become an ``intervenor''. Among other things, intervenors have the right to receive copies of case-related Commission documents and filings by other intervenors. Likewise, each intervenor must provide copies of its filings to all other parties. If you want to become an intervenor you must file a motion to intervene according to Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.214) attached as appendix 2.
The dates for filing of timely motions to intervene for the Coco Transmission Project (Docket No. CP95-170-000) and Coco Storage Field Project (Docket No.CP95-181-000) are February 16, 1995 and February 23, 1995, respectively. After these dates, parties seeking to file late interventions must show good cause, as required by section 385.214(b)(3), why this time limitation should be waived. Environmental issues have been viewed as good cause for late intervention. You do not need intervenor status to have your scoping comments considered. Additional information about the proposed project is available from Mr. Jeff Shenot, Coco Transmission Project EA Manager, at (202) 219- 0295, or from Medha Kochhar, Coco Field Project EA Manager, at (202) 208-2270.
Lois D. Cashell,
Secretary.
[FR Doc. 95-3900 Filed 2-15-95; 8:45 am] BILLING CODE 6717-01-M

 
 