al Register: July 19, 1995 (Volume 60, Number 138)] >From the Federal Register Online via GPO Access [wais.access.gpo.gov]

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 

Federal Energy Regulatory Commission

al Register: July 19, 1995 (Volume 60, Number 138)] [Notices]
[Page 37057]
>From the Federal Register Online via GPO Access [wais.access.gpo.gov]



DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Project No. 8632-013 Illinois]

City of Kankakee, IL; Notice of Availability of Environmental Assessment

July 13, 1995.
In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's Regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47910), the Office of Hydropower Licensing (OHL) reviewed the application for amendment for the Kankakee Hydroelectric Project. The application is a request for approval of an as-built exhibit G-1. The exhibit shows the as-built location of the transmission line. The license authorizes a 2.1 mile long, underground transmission line. As built, the project consists of 1.5 miles of underground transmission line and 0.9 mile of overhead transmission line, in the City of Kankakee, Illinois. The staff prepared an Environmental Assessment (EA) for the action. In the EA, staff concludes that approval of the licensee's amendment application would not constitute a major federal action significantly affecting the quality of the human environment.
Copies of the EA are available for review in the Reference and Information Center, Room 3308, of the Commission's offices at 941 North Capitol Street, N.E., Washington, DC 20426. Lois D. Cashell,
Secretary.
[FR Doc. 95-17702 Filed 7-18-95; 8:45 am] BILLING CODE 6717-01-M