Eastern Shore Natural Gas Company; Notice of Intent To Prepa
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
Eastern Shore Natural Gas Company; Notice of Intent To Prepa
[Federal Register: January 22, 1996 (Volume 61, Number 14)] [Notices]
[Page 1569-1570]
>From the Federal Register Online via GPO Access [wais.access.gpo.gov]
DEPARTMENT OF ENERGY
[Docket No. CP96-97-000]Eastern Shore Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Hockessin Expansion Project and Request for Comments on Environmental Issues
January 16, 1996.
The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the construction and operation of the facilities proposed in the Hockessin Expansion Project.\1\ This EA will be used by the Commission in its decision-making process to determine whether an environmental impact statement is necessary and whether to approve the project.\1\ Eastern Shore Natural Gas Company's application was filed with the Commission under Section 7 of the Natural Gas Act and Part 157 of the Commission's regulations.
Summary of the Proposed Project
Eastern Shore Natural Gas Company (ESNG) seeks to: (1) Provide additional firm contract demand sales and storage service to several of its existing customers; (2) Abandon firm sales service to one of its existing customers; and
(3) Construct and operate certain new pipeline and compressor facilities required to stabilize capacity on its system and to provide the additional firm sales and storage service. ESNG indicates that the proposed project (1) would stabilize system capacity and integrity of declining inlet gas pressure at the Hockessin meter and regulating station, and (2) enable ESNG to provide 4,796 Mcf of additional firm daily capacity on ESNG's system. ESNG seeks authority to:
The general location of the project facilities and specific locations for facilities on new sites are shown in appendix 1.\2\
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Delaware's Public Reference and Files Maintenance Branch, 888 First
Street NE., Washington, DC 20426, or call (202) 208-1371. Copies of
the appendices were sent to all those receiving this notice in the
mail.
Land Requirements for Construction
Construction of the proposed facilities would require about 4.8 acres of land for the proposed pipeline and about 2.7 acres for the new compressor station. About 0.9 acre would be fenced around the compressor station facilities.
The EA Process
The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us to discover and address concerns the
[[Page 1570]]
public may have about proposals. We call this ``scoping''. The main
goal of the scoping process is to focus the analysis in the EA on the
Important environmental issues. By this Notice of Intent, the
Commission requests public comments on the scope of the issues it will
address in the EA. All comments received are considered during the
preparation of the EA. State and local government representatives are
encouraged to notify their constituents of this proposed action and
encourage them to comment on their areas of concern.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Currently Identified Environmental Issues
We have already identified one issue that we think deserves attention based on a preliminary review of the proposed facilities and the environmental information provided by Transwestern: The proposed compressor station may increase ambient noise levels. Keep in mind that this is a preliminary issue. Issues may be added, subtracted, or changed based on your comments and our analysis.
Public Participation
You can make a difference by sending a letter addressing your
specific comments or concerns about the project. You should focus on
the potential environmental effects of the proposal, alternatives to
the proposal (including alternative locations or routes), and measures
to avoid or lessen environmental impact. The more specific your
comments, the more useful they will be.
Please follow the instructions below to ensure that your comments
are received and properly recorded:
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding or become an
``intervenor''. Among other things, intervenors have the right to
receive copies of case-related Commission documents and filings by
other intervenors. Likewise, each intervenor must provide copies of its
filings to all other parties. If you want to become an intervenor you
must file a motion to intervene according to rule 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.214) (see
appendix 2).
You do not need intervenor status to have your scoping comments
considered.
Additional information about the proposed project is available from
Mr. Herman K. Der, EA Project Manager, at (202) 208-0896.
Lois D. Cashell,
Secretary.
[FR Doc. 96-656 Filed 1-19-96; 8:45 am]
BILLING CODE 6717-01-M