DEPARTMENT OF ENERGY

Floodplain Statement of Findings For West Tributary Surface Water Monitoring Improvements

AGENCY: Office of Environmental Management, Department of Energy (DOE).

ACTION: Floodplain statement of findings.


SUMMARY: This Floodplain Statement of Findings for the West Tributary Surface Water Monitoring Improvements Project has been prepared in accordance with 10 CFR Part 1022. DOE proposes to replace an existing V-notched, contracted, weir that is located within the 100-year floodplain of White Oak Creek in Roane County, Tennessee with a complex-shaped critical flow flume. A Floodplain Assessment (available from the Oak Ridge address below) describing the potential effects of the action and alternatives to avoid or minimize potential harm to or within the affected floodplain was prepared. DOE will allow 15 days of public review after publication of this Statement of Findings before implementing the proposed action.

FOR FURTHER INFORMATION CONTACT: Bryan Westich, Waste Management Technology Development Division, U.S. Department of Energy, 3 Main Street, Oak Ridge, Tennessee 37830, Telephone (615) 241-2160, FAX (615) 576-5333.

FOR FURTHER INFORMATION ON GENERAL DOE FLOODPLAIN/WETLANDS ENVIRONMENTAL REVIEW REQUIREMENTS CONTACT: Carol M. Borgstrom, Director, Office of NEPA Policy and Assistance, EH-42, U.S. Department of Energy, 1000 Independence Avenue, S.W., Washington, D.C. 20585, (202) 586-4600 or (800) 472-2756.

SUPPLEMENTARY INFORMATION: This is a Floodplain Statement of Findings for the West Tributary Surface Water Monitoring Improvements Project prepared in accordance with 10 CFR Part 1022. A Notice of Involvement for the proposed action was published in the Federal Register on October 4, 1993. This action is part of the Surface Water Monitoring Program at the Oak Ridge National Laboratory (ORNL) to enhance the accuracy of flow measurement and contaminant mass flux monitoring by upgrading or replacing existing flow measurement structures or devices. One such flow measurement structure is located in a tributary (West Tributary) to White Oak Lake. The structure is also located within the 100-year floodplain of White Oak Creek. The site is located in an area that is not accessible to the general public. DOE is proposing to replace an existing V-notched, contracted, weir with a complex-shaped critical flow flume which will facilitate a larger range of flow measurement. As part of this action it would be necessary to demolish the existing V-notched weir structure and recontour the streams side slopes and bed to accommodate the installation of the new flume. Stream flow would be diverted during demolition and construction activities. Three alternatives were considered in addition to the proposed action. The first was the no-action alternative. This alternative would not meet the program objective for enhanced accuracy of stream flow measurement and contaminant mass flux monitoring. The second alternative would be the restoration or upgrading of the existing weir structure. This action would not result in a significant increase in measurable flow range and would not meet the program objectives. The third alternative would be to replace the weir with a commercially available H-flume in lieu of the critical flow flume. The use of an Hflume would result in a greater upstream water depth to accommodate the desired flow range. Additional topographic contouring would be required in the area of the H-flume. Therefore the use of the H-flume would be less practical than the use of the critical flow flume. There is no practicable alternative to the location of this action in the floodplain.
The Floodplain Assessment concluded that the replacement of the Vnotched weir with the critical flow flume would have no significant effect on the 100-year floodplains of White Oak Creek, White Oak Lake, or the West Tributary. Risks to individuals, property, or the environment will not be increased as a result of this action. DOE will allow 15 days of public review after publication of the Statement of Findings before implementing the proposed action.

Issued in Oak Ridge, Tennessee on March 11, 1996. James L. Elmore,
Alternate NEPA Compliance Officer.
[FR Doc. 96-6839 Filed 3-20-96; 8:45 am] BILLING CODE 6450-01-P

 
 