Jump to main content.


Environmental Impact Statements; Notice of Availability

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: December 11, 1998 (Volume 63, Number 238)]
[Notices]               
[Page 68450-68451]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr11de98-38]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-5497-7]

 
Environmental Impact Statements; Notice of Availability

RESPONSIBLE AGENCY: Office of Federal Activities, General Information 
(202) 564-7167 or (202) 564-7153. Weekly receipt of Environmental 
Impact Statements Filed November 30, 1998

[[Page 68451]]

Through December 04, 1998 Pursuant to 40 CFR 1506.9.

EIS No. 980488, FINAL SUPPLEMENT, EPA, LA, Atchafalaya River Bar 
Channel Ocean Dredged Material Disposal Site Designation, Updated 
Information, St. Mary Parish, LA , Due: January 11, 1999, Contact: Joe 
Swick (214) 665-7456
EIS No. 980489, DRAFT EIS, IBR, CA, Groundwater Replenishment System, 
Implementation to Repurifying Water from Orange County Water District 
(OCWD) Orange County Sanitation District (OCSD), Funding and COE 
Section 404 Permit, Orange County, CA, Due: February 01, 1999, Contact: 
Del Kidd (702) 293-8698
EIS No. 980490, FINAL EIS, TVA, TN, GA, MS, VA, AL, KY, NC, Shoreline 
Management Initiative: An Assessment of Residential Shoreline 
Development Impacts in the Tennessee Valley, Mainstream Tennessee River 
and Tributary Reservoirs in AL, KY, NC, TN, GA, MS and VA, Due: January 
11, 1999, Contact: Harold M. Draper (423) 632-6889
EIS No. 980491, FINAL EIS, STA, NM, TX, Programmatic EIS--International 
Bridge Crossing Project, Construction and Operation, Along the United 
States-Mexico Border from EL Paso to Brownsville, TX, Presidential 
Permit, NM and TX, Due: January 11, 1999, Contact: Eric Verwers (817) 
978-0202.
EIS No. 980492, FINAL SUPPLEMENT, JUS, CA, Service Processing Center 
(SPC) for Detainees, Construction and Operation, Possible Sites, 
Stockton and Tracy Sites, San Joaquin Counties, CA, Due: January 11, 
1999, Contact: William A. Kopitz (202) 307-1877
EIS No. 980493, DRAFT EIS, AFS, MT, Swamp Timber Sales Project, 
Implementation, Kootenai National Forest, Fortine Ranger District, 
Lincoln County, MT, Due: January 25, 1999, Contact: Robert G. Carlin 
(406) 882-4451.
EIS No. 980494, FINAL EIS, COE, MN, WI, Duluth-Superior Harbor Phase 
II, Dredge Material Management Plan, Cities of Duluth, St. Louis 
County, MN and Douglas County, WI, January 11, 1999, Contact: Mr. Terry 
A. Long (313) 226-6758.
EIS No. 980495, DRAFT EIS, FHW, IN, IN-641 Terre Haute Bypass, Improve 
access between US 41 South to I-70 East of Terre Haute, Funding and COE 
Section 404 Permit, Vigo County, IN, Due: March 01, 1999, Contact: 
Douglas N. Head (317) 226-7487.
EIS No. 980496, DRAFT EIS, NPS, DC, The White House and President's 
Park, Comprehensive Design Plan, Implementation of a Framework for 
Future Management, Washington, D.C., Due: March 11, 1999, Contact: 
James I. McDaniel (202) 619-6344.
EIS No. 980497, DRAFT EIS, FTA, WA, Central Link Light Rail Transit 
Project, (Sound Transit), Construct and Operate an Electric Rail 
Transit System, Funding and COE Section 10 and 404 Permit, In the 
Cities of Seattle, Sea Tac and Tukwila, King County, WA, Due: February 
05, 1998, Contact: Helen Knoll (206) 220-4464.
EIS No. 980498, DRAFT EIS, AFS, UT, Brighton Ski Resort Master 
Development Plan Updated, Implementation, Wasatch-Cache National 
Forest, Salt Lake City, UT, Due: January 26, 1999, Contact: Steve 
Scheid (801) 943-9483.

Amended Notices

EIS No. 980396, DRAFT EIS, COE, AL, GA, FL, Apalachicola-Chattahochee-
Flint (AFC) River Basin Water Allocation, Allocation Formula Approval, 
AL, FL and GA, Due: February 26, 1999, Contact: Joanne Brandt (334) 
690-3260. Published FR 10-09-98--Review Period extended.
EIS No. 980401, DRAFT EIS, COE, AL, GA, Alabama-Coosa-Tallapoosa (ACT) 
River Basin Compact, Water Allocation, several counties, AL and GA, 
Due: February 26, 1999, Contact: Michael L. Eubank (334) 694-3861. 
Published FR 10-09-98 Review Period Extended.
EIS No. 980435, DRAFT EIS, USA, GA, U.S.
    Army/Fort Benning and The Consolidated Government of Columbus 
Proposed Land Exchange, Muscogee and Chattahoochee Counties, GA, Due: 
December 14, 1998, Contact: John Brent (706) 545-4766. Published FR-10-
30-98 EIS Status. Correction. Changed from Preliminary DEIS to DEIS.
EIS No. 980453, DRAFT EIS, NPS, TX, Lyndon B. Johnson National 
Historical Park, Package 227, General Management Plan, Implementation, 
Blanco and Gillespie Counties, TX, Due: December 28, 1998, Contact: 
Leslie Starhart (830) 868-7128 ext. 226. Published FR 11-13-98 
Correction to Telephone Number.
EIS No. 980460, DRAFT EIS, AFS, MT, Clancy-Unionville Vegetation 
Manipulation and Travel Management Project, Implementation, Helene 
National Forest, Helena Ranger District, Lewis and Clark and Jefferson 
Counties, MT, Due: February 01, 1999, Contact: Dave Turner (406) 449-
5490.
    Published FR-11-13-98--Review Period Extended.

    Dated: December 8, 1998.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 98-33004 Filed 12-10-98; 8:45 am]
BILLING CODE 6560-50-P 

 
 


Local Navigation


Jump to main content.