Notice of Issuance of Amendment to Materials License SNM-2507 Virginia Electric and Power Company; North Anna Independent Spent Fuel Storage Installation
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: November 12, 1999 (Volume 64, Number 218)]
[Notices]
[Page 61673-61674]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr12no99-142]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 72-16]
Notice of Issuance of Amendment to Materials License SNM-2507
Virginia Electric and Power Company; North Anna Independent Spent Fuel
Storage Installation
The U.S. Nuclear Regulatory Commission (NRC or the Commission) has
issued Amendment 1 to Materials License SNM-2507 held by Virginia
Electric and Power Company (VA Power) for the receipt, possession,
transfer, and storage of spent fuel at the North Anna Independent Spent
Fuel Storage Installation (ISFSI), located in Louisa County, Virginia.
The amendment is effective as of the date of issuance.
By application dated April 5, 1999, as supplemented on August 27,
1999, VA Power requested to amend its ISFSI license to permit the
storage of burnable poison rod assemblies and/or thimble plug devices
within the TN-32 casks used at North Anna. This amendment complies with
the standards and requirements of the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in
[[Page 61674]]
10 CFR Chapter I, which are set forth in the license amendment.
In accordance with 10 CFR 72.46(b)(2), a determination has been
made that the amendment does not present a genuine issue as to whether
public health and safety will be significantly affected. Therefore, the
publication of a notice of proposed action and an opportunity for
hearing or a notice of hearing is not warranted. Notice is hereby given
of the right of interested persons to request a hearing on whether the
action should be rescinded or modified.
Also in connection with this action, the Commission prepared an
Environmental Assessment (EA) and Finding of No Significant Impact
(FONSI). The EA and FONSI were published in the Federal Register on
October 15, 1999 (64 FR 55994).
Documents related to this action are available for public
inspection at the Commission's Public Document Room located at the
Gelman Building, 2120 L Street, NW, Washington, DC 20555, and at the
Local Public Document Room at the Alderman Library, the University of
Virginia, Charlottesville, VA 22903.
Dated at Rockville, Maryland, this 30th day of October 1999.
For the Nuclear Regulatory Commission.
E. William Brach,
Director, Spent Fuel Project Office, Office of Nuclear Material Safety
and Safeguards.
[FR Doc. 99-29575 Filed 11-10-99; 8:45 am]
BILLING CODE 7590-01-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)