DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Intent To Prepare a Draft Environmental Impact Statement (DEIS),
Lock and Dam 3 Mississippi River Navigation Safety and Embankments
Projects

AGENCY: U.S. Army Corps of Engineers, DoD.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: Lock and Dam 3 is a navigation dam and lock on the Mississippi
River six miles upstream from Red Wing, Minnesota. The lock and dam was
built on a bend in the river, and completed in 1938. Its position on a
bend in the river makes downbound navigation difficult, because of an
outdraft current that tends to sweep towboats and barges away from the
lock toward the gated part of the dam. The outdraft condition has
resulted in a number of accidents, and has been cause for concern for
many years. A related problem with Lock and Dam 3 is maintaining the
structural integrity of a set of three earthen embankments that connect
the gated part of the dam to high ground on the Wisconsin side. The
upstream embankment is federally-owned and contains a series of rock
overflow sections. The intermediate and downstream embankments are
privately owned. These embankments impound Marsh and Gantenbein Lakes,
and separate them from the Mississippi River. The three Wisconsin side
embankments divide the eight-foot head at the dam into three steps, and
work together as part of Lock and Dam 3. The downstream embankment is
eroding and is expected to fail in the next decade or two. Failure of
the downstream embankment would threaten the intermediate and upstream
embankments.

FOR FURTHER INFORMATION CONTACT: Questions pertaining to the issues
about the DEIS may be addressed to Mr. Robert Whiting, Chief,
Environmental and Economic Analysis Branch, St. Paul District, U.S.
Army Corps of Engineers, 190 5th Street East, St. Paul, MN 55101,
Telephone: (651) 290-5264.

SUPPLEMENTARY INFORMATION:
    1. The potential exists for towboat operators to lose control of
their tows because of the outdraft current. Barges have broken loose
and lodged in the dam gate bays, rendering the dam gates inoperable,
causing the water level in the navigation pool to rise, overflowing the
earthen embankment. This kind of event occurred in 1993, resulting in
significant erosion in the upper embankment near the gated part of the
dam and in the lower embankment.
    2. Two projects to address the navigation safety and embankments
concerns have been proposed by the St. Paul District and approved by
Corps of Engineers Headquarters. A ported guardwall was proposed to
guide downbound towboats into the lock. This project has not been
funded. The St. Paul District also recommended reconstructing the
Wisconsin-side embankment, following a downstream alignment along the
tailwater and the southern boundary of Gantenbein Lake. Recent surveys
in the tailwater identified the presence of a species-rich mussel bed,
including state-listed endangered species. In an effort to address the
navigation safety and embankment concerns at Lock and Dam 3, the St.
Paul District is conducting a re-evaluation of these related problems.
    3. Significant resources and issues to be addressed in the DEIS
will be determined through coordination with Federal, State, and local
agencies, the general public; interested private organizations,
industry, and the Prairie Island Dakota Community. Anyone who has an
interest in participating in the development of the DEIS is invited to
contact the St. Paul District, Corps of Engineers.
    4. Major issues identified to date for discussion in the DEIS are:
    a. Structural integrity and operational reliability of Lock and Dam
3.
    b. Risk of navigation accidents, erosion of embankments, and
accidental drawdown of Pool 3.
    c. Recreational boating opportunity and safety.
    d. Natural resources including the fishery, native mussels,
wildlife, aquatic and floodplain habitats.
    e. Water quality, contaminants, and sediment transport processes.
    5. Additional issues of interest may be identified through public
and agency meetings. A notice of those meetings will be provided to
interested parties and to local news media.
    6. The effort to jointly address the related navigation safety and
embankments problems at Lock and Dam 3 is considered major in scope.
Depending on the alternative plan proposed, the project could have
significant effects on navigation, public safety, regional economics,
floodplain wetlands, the fishery, native mussels and wildlife.
    7. An environmental review will be conducted according to National
Environmental Policy Act of 1969, Council of Environmental Quality

[[Page 52995]]

Regulations, and applicable laws and regulations. The DEIS will be
available to the public in the summer of 2001.

Gregory D. Showalter,
Army Federal Register Liaison Officer.
[FR Doc. 00-22223 Filed 8-30-00; 8:45 am]
BILLING CODE 3710-CY-P 

 
 