Environmental Impact Statement: Rankin County, Mississippi
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: December 5, 2000 (Volume 65, Number 234)]
[Notices]
[Page 76002-76003]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr05de00-125]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Environmental Impact Statement: Rankin County, Mississippi
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: The FHWA is issuing this notice to advise the public that an
environmental impact statement will be prepared for the proposed
extension of Airport Parkway from Old Brandon Road south to I-20 along
Highway 475 in Rankin County, Mississippi.
FOR FURTHER INFORMATION CONTACT: Cecil Vick, Environmental Coordinator,
Federal Highway Administration, 666 North Street, Suite 105, Jackson,
MS 39202-3199, Telephone: (601) 965-4217. Contacts at the State and
local level, respectively are: Mr. Claiborne Barnwell, Environmental/
Location Division Engineer, Mississippi Department of Transportation,
P.O. Box 1850, Jackson, MS, 39215-1850, telephone: (601) 359-7920; and
Mr. William R. May, District Engineer, Mississippi Department of
Transportation, 7759 Highway 80 W., Newton, MS, 39345, telephone (601)
683-3341.
SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the
Mississippi Department of Transportation (MDOT), will prepare an
Environmental Impact Statement (EIS) for the proposed extension of
Airport Parkway from Old Brandon Road south to I-20 along Highway 475
in Rankin County, Mississippi.
The project as proposed would be a facility with full access
controls. The study area for the proposed project is bounded by Old
Brandon Road to the north, Interstate 20 to the south, and extends a
sufficient distance beyond these boundaries to allow for alternative
concepts. The boundaries will extend to the vicinity of Fox Hall Drive
on the west and approximately 300 meters (1,000 feet) east of the
existing roundabout at the airport. Alternatives under consideration
include (1) taking no action and (2) build alternative.
A scoping process will be initiated that involves all appropriate
federal and state agencies. This will continue throughout the study as
an ongoing process. A formal scoping meeting will be held for the
project. Coordination will be continued with federal, state, and local
agencies, and with private organizations and citizens who express or
are known to have interest in this proposal. A formal public
involvement process will be initiated, and public meetings will be held
as appropriate. The draft EIS will be available for public and agency
review and comment prior to the official public hearing.
To ensure that the full range of issues related to this proposed
action are addressed and all significant issues identified, comments,
and suggestions are invited from all interested parties.
[[Page 76003]]
Comments or questions concerning this proposed action and the EIS
should be directed to the FHWA or MDOT at the addresses provided above.
Andrew H. Hughes,
Division Administrator, Jackson, Mississippi.
[FR Doc. 00-30839 Filed 12-4-00; 8:45 am]
BILLING CODE 4910-22-M
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)