Northwest Pipeline Corporation; Notice of Application

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: December 22, 2000 (Volume 65, Number 247)]
[Notices]
[Page 80850-80851]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr22de00-70]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP01-49-000]


Northwest Pipeline Corporation; Notice of Application

December 18, 2000.
    Take notice that on December 8, 2000, Northwest Pipeline
Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah, 84158,
filed in Docket No. CP01-49-000, an application, pursuant to Section
7(c) of the Natural Gas Act and Part 157 of the Federal Energy
Regulatory Commission's Regulations for a certificate of public
convenience and necessity authorizing Northwest to construct and
operate certain facilities in Snohomish County, Washington, all as more
fully set forth in the application which is on file with the Commission
and open to public inspection. This filing may be viewed on the web at
http://www.ferc.fed.us/online/rims.htm. (Call 202-108-2222 for
assistance.)
    Specifically, Northwest proposes to construct and operate: (1)
approximately 9 miles of 20-inch diameter delivery lateral pipeline in
Snohomish County (Everett Delta Lateral), extending from an
interconnect with Northwest's existing mainline and mainline loop north
of the City of Lake Stevens to the proposed Northwest Power Company,
LLC (NPC) power plant near Everett, Washington; and (2) two delivery
meter stations at the terminus of the lateral, the Everett Delta Meter
Station for deliveries to NPC and the Preston Point Meter Station for
deliveries to the distribution system of Puget Sound Energy, Inc.
(PSE).
    Northwest states that the Everett Delta Lateral will have a design
capacity of approximately 133,000 Dth per day. Further, Northwest avers
that the proposed facilities will be used to deliver natural gas to NPC
to fuel its planned Everett Delta Power Plant and to PSE to accommodate
increased demand for natural gas in its local distribution area.
    Northwest estimates the cost of the proposed facilities at
approximately $17.2 million and states that all costs will be
reimbursed by NPC and PSE pursuant to the delivery facilities
reimbursement provisions of Northwest's FERC Gas Tariff. Northwest
requests that the FERC issue a preliminary determination on non-
environmental aspects of its requested authorizations by June 30, 2001
and issue a final certificate order herein no later than the end of
year 2001, to allow adequate time for construction of the proposed
delivery facilities before August 15, 2002, the date NPC estimates it
will require test gas for its new power generating plant.
    Any questions regarding this application should be directed to Gary
Kotter, Manager, Certificates, at (801) 584-7117, Northwest Pipeline
Corporation, P.O. Box 58900, Salt Lake City, Utah 84158.
    There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party of the proceedings for this project should, on or
before January 8, 2001, file with the Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426, a motion to
intervene in accordance with the requirements of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 385.214) and the
regulations under the Natural Gas Act (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 14 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
    Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental comments will be
placed

[[Page 80851]]

on the Commission's environmental mailing list, will receive copies of
environmental documents, and will be able to participate in meetings
associated with the Commission's environmental review process. Comments
will not be required to serve copies of filed documents on all other
parties. However, Commenters will not receive copies of all documents
filed by other parties or issued by the Commission, and will not have
the right to seek rehearing or appeal the Commission's final order to a
Federal court.
    The Commission may issue a preliminary determination on non-
environmental issues prior to the completion of its review of the
environmental aspects of the project. This preliminary determination
typically considers such issues as the need for the project and its
economic effect on existing customers of the applicant, on other
pipelines in the area, and ion landowners and communities. For example,
the Commission considers the extent to which the applicant may need to
exercise eminent domain to obtain rights-of-way for the proposed
project and balances that against the non-environmental benefits to be
provided by the project. Therefore, if a person has comments on
community and landowner impacts from this proposal, it is important to
file comments or to intervene as early in the proceeds as possible.
    Comments and protests may be filed electronically via the internet
in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the Commission's
website at http://www.ferc.fed.us/efi/doorbell.htm.
    If the Commission decides to set the application for a formal
hearing before an Administrative Law Judge, the Commission will issue
another notice describing that process. At the end of the Commission's
review process, a final Commission order approving or denying a
certificate will be used.

David P. Boergers,
Secretary.
[FR Doc. 00-32687 Filed 12-21-00; 8:45 am]
BILLING CODE 6717-01-M 

 
 