Jump to main content.


Alabama Electric Cooperative; Notice of Finding of No Significant Impact

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: February 7, 2000 (Volume 65, Number 25)]
[Notices]
[Page 5853-5854]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr07fe00-46]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Rural Utilities Service


Alabama Electric Cooperative; Notice of Finding of No Significant
Impact

AGENCY:  Rural Utilities Service, USDA.

ACTION:  Notice of finding of no significant impact.

-----------------------------------------------------------------------

SUMMARY:  Notice is hereby given that the Rural Utilities Service (RUS)
has made a finding of no significant impact (FONSI) with respect to a
request from Alabama Electric Cooperative for financing assistance to
finance the construction of the a 496 megawatt combined cycle electric
generation plant in Covington County, Alabama.

FOR FURTHER INFORMATION CONTACT:  Bob Quigel, Environmental Protection
Specialist, Engineering and Environmental Staff, RUS, Stop 1571, 1400
Independence Avenue, SW, Washington, DC 20250-1571, telephone (202)
720-0468, e-mail at bquigel@rus.usda.gov.

SUPPLEMENTARY INFORMATION:  The proposed plant will be constructed on a
site adjacent to the existing Alabama Electric Cooperative's McWilliams
Plant located near Gantt in Covington County, Alabama. It will be made
up of two combustion turbines which have the potential to generate 166
megawatts each. The exhaust gas from each

[[Page 5854]]

combustion turbine will be fed to a heat recovery steam generator. The
output from each heat recovery steam generator will be fed to a single
steam turbine that has the potential to generate 164 megawatts. Each
heat recover steam generator will incorporate a selective catalytic
reduction system to remove nitrogen oxides from the combustion
turbine's exhaust gas. The combustion turbines units will be shop-built
and shipped to the site as modules that will be installed on steel-
reinforced concrete foundations. Related improvements will include the
construction of a new electric transmission station and an 18.6-mile,
230 kV transmission line circuit between the Gantt Plant and the Opp
Switching Station. The Southeast Alabama Gas District will construct a
60-mile-long, 20-inch diameter natural gas pipeline from Flomaton,
Alabama, to the Gantt site to provide the natural gas to power the
plant. RUS will not provide financing assistance for the natural gas
pipeline.
    Based on its environmental assessment of the project, RUS has
concluded that the construction and operation of the 496 megawatt plant
at the Gantt site would have no significant impact to the quality of
the human environment. Therefore, RUS will not prepare an environmental
impact statement for its action related to this project.
    Copies of the FONSI are available from RUS at the address provided
herein or from Mike Noel, Alabama Electric Cooperative, P.O. Box 550,
Andalusia, Alabama 36420-0550, telephone (334) 427-3248. Mike's e-mail
address is: mike.noel@powersouth.com.

    Dated: January 31, 2000.
Blaine D. Stockton, Jr.,
Assistant Administrator, Electric Program.
[FR Doc. 00-2692 Filed 2-4-00; 8:45 am]
BILLING CODE 3410-15-P 

 
 