Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: January 25, 2000 (Volume 65, Number 16)]
[Notices]
[Page 3955-3956]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr25ja00-41]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions
To Intervene and Protests
January 19, 2000.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: New Major License.
b. Project No.: 2589-024.
c. Date filed: July 29, 1999.
d. Applicant: Marquette Board of Light and Power.
e. Name of Project: Marquette Hydroelectric Project.
f. Location: On the Dead River near the City of Marquette,
Marquette County, Michigan. The project would not use federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Secs. 791(a)-
825(r).
h. Applicant Contact: Mr. David E. Hickey, Marquette Board of Light
and Power, 2200 Wright Street, Marquette, MI 49855, (906) 228-0322.
i. FERC Contact: Lee Emery, lee.emery@ferc.fed.us, or (202) 219-
2778.
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Status of environmental analysis: This application is not ready
for environmental analysis at this time.
l. Description of the Project: The project consists of the
following two existing facilities: The Marquette Development No. 2
includes (1) Forestville Reservoir with a surface area of 110 acres and
a storage volume of 2,900 acre-feet, impounded by (2) a 202-foot-long,
62-foot high, concrete-capped Cyclopean masonry dam with crest
elevation 771.0 feet NGVD, which acts as a spillway under extremely
high flows, with (a) a 197-foot-long concrete retaining wall, (b) a 75-
foot-long training wall, and (c) a 33-foot-wide intake structure, with
inclined trashracks, which discharges into (3) a 90-inch-diameter,
wood-stave penstock, about 4,200 feet long, which conveys the water to
(4) a concrete surge tank. From the surge tank, the water is carried by
(5) two 440-foot-long, 78-inch-diameter steel penstocks to (6)
Powerhouse No. 2, which is a 40-foot by 96-foot reinforced concrete and
brick structure containing (7) two, two-phase, 60-cycle horizontal
turbine-generator sets with a combined generating capacity of 3,200
kilowatts, which transmits power to the 12,500 kV power distribution
system.
The Marquette Development No. 3 includes (8) Tourist Park Reservoir
with a surface area of 100 acres and a storage volume of 875 acre-feet,
impounded by (9) a dam composed of (a) a 37-foot-long left spillway
dike with a crest elevation of 642.84 feet NGVD, (b) an 80-foot long,
21-foot high, uncontrolled concrete ogee-shaped overflow spillway, with
a crest elevation of 638.84 feet NGVD, (c) a gated spillway with two
electric-hoist-operated, 10-foot-high by 10-foot-wide Taintor gates
with a crest elevation of 629.84 feet NGVD, (d) a 758-foot-long right
dike, with a reinforced concrete core wall with a crest elevation of
642.84 feet NGVD, and (e) a reinforced concrete intake structure with
inclined trash racks, located 123 feet from the right end of the right
dike, and having a single 20-foot-wide by 17-foot high bay. This bay
controls water flowing into (10) an 8-foot-diameter, 150-foot long
steel penstock, supported on nine reinforced-concrete pedestals spaced
16 feet apart, which carries water to (11) Powerhouse No. 3, which is a
28-foot by 40-foot reinforced concrete and brick structure containing
(12) one two-phase, 60-cycle vertical turbine-generator set with a
generating capacity of 700 kW, which transmits power to the 12,500kV
power distribution system.
m. Locations of the application: A copy of the application for
inspection and reproduction at the Commission's Public Reference Room,
located at 888 First Street, NE, Room 2A, Washington, DC 20246, or by
calling (202) 208-1371. The application may be viewed on the web at
http://www.ferc.fed.us/online/rims.htm (call (202) 208-2222 for
assistance). A copy is also available for inspection and reproduction
at the address in item h. above.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
Protests or Motions to Intervene--Anyone may submit a protest or a
motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
Filing and Service of Responsive Documents--The application is not
ready for environmental analysis at this time; therefore, the
Commission is not now requesting comments, recommendations, terms and
conditions, or prescriptions.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. Any of these documents must be filed by providing the
original and the number of copies required by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington DC 20426. An additional copy must be
sent to Director, Division of Project Review, Office of Hydropower
Licensing, Federal Energy Regulatory Commission, at the above address.
A copy of any protest or motion to intervene must be served upon each
[[Page 3956]]
representative of the applicant specified in the particular
application.
David P. Boergers,
Secretary.
[FR Doc. 00-1692 Filed 1-24-00; 8:45 am]
BILLING CODE 6717-01-M