Intent To Prepare a Draft Environmental Impact Statement (DEIS) for Missouri River Flood Plain Developments Between Missouri River Miles 29.6 to 38.4, St. Louis County, Missouri
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: January 26, 2000 (Volume 65, Number 17)]
[Notices]
[Page 4234-4235]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr26ja00-52]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Intent To Prepare a Draft Environmental Impact Statement (DEIS)
for Missouri River Flood Plain Developments Between Missouri River
Miles 29.6 to 38.4, St. Louis County, Missouri
AGENCY: U.S. Army Corps of Engineers, St. Louis District, DOD.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: St. Louis District, U.S. Army Corps of Engineers (SLD) is
issuing this notice that an Environmental Impact Statement (EIS) will
be prepared to address cumulative and future impacts to the Missouri
River flood plain, resulting from permitted actions evaluated under
Section 404 of the Clean Water Act. The study area is from approximate
Missouri River mile 29.6 to 38.4, along the right descending bank of
the Missouri River in St. Louis County, Missouri. Most of this area of
flood plain is currently protected by the Howard Bend Levee, which
connects to the Riverport Levee. No pending regulatory permits are
required at this time for proposed development projects within this
area. However, it is the intent of SLD to prepare an EIS to address the
cumulative impacts that have occurred to the aquatic resources in this
area from permitted activities, as well as to address the impacts to
the environment for several large projects forecast in the future, that
may require Section 404 permits.
ADDRESSES: U.S. Army Corps of Engineers, St. Louis District,
Construction-Operations Readiness Division, Regulatory Branch, 1222
Spruce Street, St. Louis, MO 63103-2833.
FOR FURTHER INFORMATION CONTACT: Mr. Danny McClendon, (314) 331-8580
or Danny D. Mcclendon@mvs02.usace.army.mil
[[Page 4235]]
SUPPLEMENTARY INFORMATION: During the last 25 years, the Missouri
River flood plain between approximate Missouri River miles 27.0 (Earth
City Levee) and 47.0 (Monarch-Chesterfield Levee) in St. Louis County,
Missouri, has been subjected to extensive levee construction and
development for agricultural, industrial, and commercial purposes.
These activities have impacted the aquatic environment and fish and
wildlife resources in this reach of flood plain. Construction of the
Earth City Levee to a 500-year level of protection in 1972,
construction of the Riverport Levee to a 500-year level of protection
in 1988, reconstruction and recertification of the Monarch-Chesterfield
Levee to a 100-year level of protection in 1997 and current proposal to
raise this levee to a 500+-year level of protection, reconstruction of
a portion of the Howard Bend Levee to a 100-year level of protection in
1966 and current proposal to raise this levee to a 500+-year level of
protection, current construction of the Page Avenue Extension Project,
and resultant commercial and industrial development and agricultural
conversions has resulted in a disjointed analysis of natural resource
impacts in relation to Section 404 of the Clean Water Act. Prior to
February 1995, the regulatory responsibility for Section 404 permits in
the Missouri River flood plain in St. Louis County, Missouri were with
the Kansas City District, Corps of Engineers (KCD). As of February 1,
1995, this responsibility was transferred to the St. Louis District,
Corps of Engineers (SLD). The Earth City Levee, Riverport Levee, and
Page Avenue Extension Project involved legal challenges, which resulted
in certain limitations and special conditions for future Corps permit
actions. In addition, KCD recognized the piecemeal development of the
levee protected areas within the Monarch-Chesterfield flood plain and
placed a moratorium on individual developments without the preparation
of an environmental analysis. The SLD continued this moratorium on
development in the protected areas within the Monarch-Chesterfield
flood plain until late 1996 and late 1997, upon which time the SLD
issued Section 404 permits for the remaining wetlands within the levee
protected area based upon two consolidated permit applications and
environmental analysis. Large-scale mitigation was required for these
permit actions. In 1997, the SLD initiated a study to determine the
feasibility of raising the Monarch-Chesterfield Levee. The SLD is
currently preparing an EIS for this project. In addition, the Missouri
Department of Transportation completed an EIS for the Page Avenue
Extension Project in 1992, and the National Park Service completed a
Supplemental EIS for the Page Avenue Extension Project in 1995.
Therefore, the scope of this current EIS will focus on the section of
Missouri River flood plain between the Monarch-Chesterfield Levee and
Interstate 70, and a north/south connector road corridor running
through the Howard Bend flood plain, with a beginning point at
Interstate 70 and a terminus at Olive Boulevard, between Route 141
(Woods Mill Road) and Creve Coeur Mill Road (to be known at the Howard
Bend Flood Plain EIS). This EIS will not reevaluate the Page Avenue
Extension Project, the Monarch-Chesterfield Levee Project, the
Riverport or Earth City Levees, or any other previously approved or
permitted projects by the Corps of Engineers located in the study area.
However, the EIS will take into account the cumulative and secondary
impacts of these projects on the remaining aquatic resources within the
study area, and address any special conditions or requirements of these
previous projects.
Alternatives
The Corps of Engineers has 3 alternative courses of action
available:
1. The ``no action'' alternative would be to not grant any future
Section 404 permits within the study area.
2. Continue to process Section 404 permit applications on a case-
by-case basis for future developments within the Howard Bend Flood
Plain study area, without developing a Strategic Area Management Plan
(SAMP).
3. Evaluate the environmental effects of future developments within
the Howard Bend Flood Plain study area leading to the development of a
Strategic Area Management Plan (SAMP) to address the cumulative and
secondary impacts of developments in this area, and develop a
comprehensive plan to protect or mitigate important aquatic resources
due to permitted activities.
Scoping and Public Involvement
Public involvement will be sought during scoping and conduct of the
study in accordance with NEPA procedures. A public scoping process will
help to clarify issues of major concern, identify any information
sources that might be available to analyze and evaluate impacts, and
obtain public input on the range and acceptability of alternatives. The
Notice of Intent formally commences the scoping process under NEPA. As
part of the scoping process, all Federal, State and local agencies,
Indian Tribes, and other interested private organizations, including
environmental groups, are invited to comment on the scope of the EIS.
Comments are requested concerning project alternatives, mitigation
measures, probable significant environmental impacts and permits or
other approvals that may be required.
Key areas to be analyzed in-depth in the draft EIS will include the
flood plain, wetlands, water quality, fisheries, wildlife, parks,
infrastucture, cultural resources, socioeconomic resources, recreation,
transportation, and cumulative and secondary enviromental impacts.
Other Environmental Review and Coodination Requirements
All review and coordination requirements will be fulfilled via this
NEPA process. On-going permit actions and studies are continually
coordinated with agencies and interested publics.
Scoping Meeting
A scoping meeting for this EIS will be held in conjunction with a
public workshop that will be held in March 2000. The exact date has not
been set and can be requested by calling (314) 331-8580.
Availability of Draft EIS
The draft EIS is scheduled for release in late 2000 to early 2001.
Michael R. Morrow,
COL, EN, Commanding.
[FR Doc. 00-1823 Filed 1-25-00; 8:45 am]
BILLING CODE 3710-GS-M