Berkeley Electric Cooperative, Inc; Notice of Availability of an Environmental Assessment

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: May 19, 2000 (Volume 65, Number 98)]
[Notices]
[Page 31878]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19my00-34]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Rural Utilities Service


Berkeley Electric Cooperative, Inc; Notice of Availability of an
Environmental Assessment

AGENCY: Rural Utilities Service, USDA.

ACTION: Notice of aailability of an Environmental Assessment.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given that the Rural Utilities Service (RUS)
is issuing an Environmental Assessment (EA) with respect to the
potential environmental impacts related to the construction of a 115/
24.9 kV electric distribution substation by Berkeley Electric
Cooperative. RUS may provide financing assistance for the project.

FOR FUTHER INFORMATION CONTACT:  Bob Quigel, RUS, Engineering and
Environmental Staff, Stop 1571, 1400 Independence Avenue, SW,
Washington, DC 20250-1571, telephone: (202) 720-0468. Bob's e-mail
address is bquigel@rus.usda.gov. Information is also available from Tom
Meyers, Vice President of Engineering, at Berkeley Electric
Cooperative, P.O. Box 1234, Monks Corner, South Carolina, 29461-1234,
telephone (843) 761-8200.

SUPPLEMENTARY INFORMATION: The project consists of the construction of
a 115/24.9 kV electric distribution substation located in Dorchester
County, South Carolina, on the southern side of Ridge Road
approximately 1000 feet east of the intersection of Parkers Ferry Road
and Ridge Road. The fenced area for the substation will be
approximately 7.5 acres. The fence surrounding the substation will be 7
feet high and topped with 3 strands of barbed wire. A short gravel road
will be constructed from Ridge Road to the substation site.
Approximately 500 feet of overhead 115 kV transmission line will
connect the substation to an existing transmission line south of
Parkers Ferry Road. Three underground distribution feeder lines will
connect the substation to Berkeley Electric Cooperative's electric
distribution system.
    Berkeley Electric Cooperative submitted to RUS an environmental
report which describes the project further and considers its potential
environmental impacts. RUS has conducted an independent evaluation of
the environmental report and believes that it accurately assesses the
impacts of the proposed project. No adverse impacts are expected with
the construction of the project. RUS has accepted the document as its
Environmental Assessment and is making it available for public review.
    The EA can be reviewed at Berkeley Electric Cooperative's
Headquarters Office at 414 North Highway 52, Moncks Corner, South
Carolina 29461 and their Johns Island District Office located at 3351
Maybank Highway, Johns Island, South Carolina 29455.
    Questions and comments should be sent to RUS at the address
provided. RUS should receive comments on the EA in writing within 30
days of the publication date of this notice to ensure that the comments
are taken into consideration prior to RUS making its environmental
determination.
    Any final action by RUS related to the proposed project will be
subject to, and contingent upon, compliance with all relevant Federal
environmental laws and regulations and completion of environmental
review procedures as prescribed by the Council on Environmental Quality
Regulations and RUS Environmental Policies and Procedures.

    Dated: May 15, 2000.
Glendon D. Deal,
Acting Director, Engineering and Environmental Staff.
[FR Doc. 00-12653 Filed 5-18-00; 8:45 am]
BILLING CODE 3410-15-U 

 
 