Colorado Interstate Gas Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Fort Morgan Storage Field Expansion Project and Request for Comments on Environmental Issues
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: November 27, 2000 (Volume 65, Number 228)]
[Notices]
[Page 70708-70710]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr27no00-49]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP01-1-000]
Colorado Interstate Gas Company; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Fort Morgan Storage Field
Expansion Project and Request for Comments on Environmental Issues
November 20, 2000.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Fort Morgan Storage Field
Project involving construction and operation of facilities by Colorado
Interstate Gas Company (CIG) in Weld, Adams and Morgan Counties,
Colorado and Morton County Kansas.\1\ These facilities would consist of
about 53.2 miles of 24 inch-diameter pipeline and 2,825 horsepower (hp)
of compression. This EA will be used by the Commission in its decision-
making process to determine whether the project is in the public
convenience and necessity.
---------------------------------------------------------------------------
\1\ CIG's application was filed with the Commission under
Section 7 of the Natural Gas Act and Part 157 of the Commission's
regulations.
---------------------------------------------------------------------------
If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the proposed facilities.
The pipeline company would seek to negotiate a mutually acceptable
agreement. However, if the project is approved by the Commission, that
approval conveys with it the right of eminent domain. Therefore, if
easement negotiations fail to produce an agreement, the pipeline
company could initiate condemnation proceedings in accordance with
state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice CIG provided to landowners. This fact sheet addresses a
number of typically asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings. It is
available for viewing on the FERC Internet website (www.ferc.fed.us).
Summary of the Proposed Project
CIG proposes to construct, operate, and abandon facilities in
Colorado and Kansas to increase the maximum daily storage withdrawal
quantity and increase capacity on its transmission system. CIG seeks
authority to:
Drill one injection well/withdrawal well and convert one
observation well to a salt water disposal well at the Fort Morgan
Storage Field and upgrade two segments of the Fort Morgan Storage Field
gathering system from an MAOP of 1,800 and 2,000 to an MAOP of 2,160
psig;
Increase Fort Morgan Storage Field allowed maximum storage
gas in place from 14,322 MMcf to 14,858 MMcf, and increase the average
shut-in reservoir bottom hole pressure to a maximum of 2,390 psia;
Add 4 injection/withdrawal wells and convert 8 injection/
withdrawal wells to observation wells at the Boehm Storage Field;
Install a 600 horsepower compressor along with hydrogen
sulfide treatment and appurtenant facilities at the Boehm Storage Field
to remove Keyes Sands Reservoir base gas. The compressor would be used
until the pressure in the Keyes Sand Reservoir is too low to be
effectively utilized. CIG would then abandon the compressor and the
Keyes Sands Reservoir;
Construct 26.2 miles of 24-inch-diameter pipeline loop
adjacent to CIG's existing pipeline which would run between CIG's
existing Cheyenne Compressor Station and Ault Meter Station in Weld
County, Colorado;
Construct new Fort Lupton Compressor Station consisting of
three natural gas-fired reciprocating engines each rated at 2,225
horsepower and appurtenant facilities in Weld County, Colorado;
Construct 27 miles of 24-inch-diameter pipeline loop and
appurtenant facilities from CIG's proposed Fort
[[Page 70709]]
Lupton Compressor Station in Weld County, Colorado to CIG's existing
Watkins Compressor Station in Adams County, Colorado; and
Install miscellaneous facilities within the Watkins
Compressor Station that include yard piping, pipe valves, fittings,
controls and regulation and measurement equipment.
CIG states that these facilities would increase its storage pool
deliverability from 775 MMcf to 877 MMcf per day and increase capacity
from the Cheyenne Compressor Station.
The general location of the project facilities is shown in appendix
1.
Land Requirements for Construction
Construction of CIG's proposed facilities would require about 780
acres of land. Following construction, about 413 acres would remain as
permanent right-of-way. The remaining 367 acres of land would be
restored and allowed to revert to its former use.
The nominal construction right-of-way for the Ault to Cheyenne Loop
(5C North) would be 85 feet wide, with 50 feet retained as permanent
right-of-way. About 75.5 percent of the route of the loop would abut or
overlap existing easements. The loop would deviate away from existing
rights-of-way in multiple segments, totaling 6.44 miles, because of the
Pawnee National Grassland Center or to avoid existing facilities.
The nominal construction right-of-way for the Watkins to Fort
Lupton Loop (5C South) would be 85 feet wide (75 feet through wetland
areas), with 50 feet retained as permanent right-of-way. About 97.8
percent of the route of the loop would abut or overlap existing
easements. The loop would deviate away from existing rights-of-way in
multiple segments, totaling 0.69 miles, because of archaeological
sites, or to avoid existing facilities.
Construction of the new Fort Lupton Compressor Station would
disturb about 11 acres, of which 10 acres would be required for
operation of the facility and 1 acre for the access road. The proposed
Boehm Storage Field Enhancement would consist of a 400 square foot
dehydration plant which would affect approximately 6.7 acres within the
Cimarron National Grassland with 3.67 acres required for the facility.
Additional minor land disturbances would be associated with pig
launching facilities and valves. These disturbances would be limited to
existing meter stations, compressor stations, or within the proposed
permanent right-of-way.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. We call this ``scoping''. The main goal of the scoping
process is to focus the analysis in the EA on the important
environmental issues. By this Notice of Intent, the Commission requests
public comments on the scope of the issues it will address in the EA.
All comments received are considered during the preparation of the EA.
State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
---------------------------------------------------------------------------
\2\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils;
Water resources, fisheries, and wetlands;
Vegetation and wildlife;
Endangered and threatened species;
Public safety;
Land use;
Cultural resources;
Air quality and noise;
Hazardous waste.
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section beginning on page 6.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by CIG. This preliminary list of
issues may be changed based on your comments and our analysis.
Geology and Soils
--Shallow topsoil depth
--Erosion prone soils
Water Resources and Wetlands
--Crossing 5 perennial and 3 intermittent streams
--Crossing 13 wetlands
Threatened and Endangered Species
--Potential impacts on 6 federally listed species, including the
Bald eagle, Preble's meadow jumping mouse, Ute ladies'-tresses,
Whooping crane, Least tern, and Piping plover
Land Use
--Impacts on about 9 miles of public lands
--Impacts on about 25 miles of rangeland
--Impacts on about 23 miles of agricultural land
Air and Noise Quality
--Impacts on local air quality and noise environment as a result of
the new Fort Lupton Compressor Station
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal and measures to avoid or lessen
environmental impact. The more specific your comments, the more useful
they will be. Please carefully follow these instructions to ensure that
your comments are received in time and properly recorded:
Send an original and two copies of your letter to: David
P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 First
St., NE., Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas/
Hydro Group PJ-11.3.
Reference Docket No. CP01-001-000.
Mail your comments so that they will be received in
Washington, DC on or before December 21, 2000. Comments and protests
may be filed electronically
[[Page 70710]]
via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's web site at http://
www.ferc.fed.us/efi/doorbell.htm.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding known as an
``intervenor''. Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must provide 14 copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding. If
you want to become an intervenor you must file a motion to intervene
according to Rule 214 of the Commission's Rules of Practice and
Procedure (18 CFR 385.214) (see appendix 2). Only intervenors have the
right to seek rehearing of the Commission's decision.
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by starting that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Additional information about the proposed project is available from
the Commission's Office of External Affairs at (202) 208-0004 or on the
FERC website (www.ferc.fed.us) using the ``RIMS'' link to information
in this docket number. Click on the ``RIMS'' link, select ``Docket #''
from the RIMS Menu, and follow the instructions. For assistance with
Access to RIMS, the RIMS helpline can be reached at (202) 208-2222.
Similarly, the ``CIPS'' link on the FERC Internet website provides
access to the texts of formal documents issued by the Commission, such
as orders, notices, and rulemakings. From the FERC Internet website,
click on the ``CIPS'' link, select ``Docket #'' from the CIPS menu, and
follow the instructions. For assistance with access to CIPS, the CIPS
helpline can be reached at (202) 208-2474.
David P. Boergers,
Secretary.
[FR Doc. 00-30068 Filed 11-24-00; 8:45 am]
BILLING CODE 6717-01-M
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)