Intent To Prepare a Draft Supplemental Environmental Impact Statement (DSEIS) for Proposed Changes to the Chickamauga Lock Project, Hamilton County, TN
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: August 14, 2001 (Volume 66, Number 157)]
[Notices]
[Page 42639-42640]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr14au01-38]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Intent To Prepare a Draft Supplemental Environmental Impact
Statement (DSEIS) for Proposed Changes to the Chickamauga Lock Project,
Hamilton County, TN
AGENCY: U.S. Army Corps of Engineers, DoD.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: The Corps of Engineers, Nashville District, and the Tennessee
Valley Authority (Cooperating Agency) will prepare a Draft Supplemental
Environmental Impact Statement (DSEIS) to the 1996 Environmental Impact
Statement titled Chickamauga Dam--Navigation Lock Project Final
Environmental Impact Statement (FEIS). This supplement is necessary to
provide information unknown and not required at the time the FEIS was
completed.
DATES: Written comments must be received by the Corps of Engineers on
or before September 10, 2001.
ADDRESSES: Written comments on issues to be considered in the SEIS
shall be mailed to: Wayne Easterling or Patty Coffey, Project Planning
Branch, Nashville District Corps of Engineers, P.O. Box 1070 (PM-P),
Nashville, Tennessee 37202-1070.
FOR FURTHER INFORMATION CONTACT: For additional information concerning
the notice and meeting announcement, please contact Wayne Easterling,
Environmental Team, (615) 736-7847, or Patty Coffey, Environmental
Team, (615) 736-7865.
SUPPLEMENTARY INFORMATION:
1. The intent of the Supplemental EIS is to provide National
Environmental Policy Act coverage for the Chickamauga Lock project that
were unknown or not required when the original EIS was prepared. The
original EIS for Chickamauga Lock was completed in 1995 and a Record of
Decision signed in 1996. The original EIS considered four alternatives
including no action (closing the existing lock), constructing a new 110
x 600 foot lock (preferred alternative), constructing a new 60 x 360
foot lock (replacement in kind) and constructing a new 75 x 400 foot
lock. The SEIS now proposed
[[Page 42640]]
will cover cumulative effects and compliance with Section 106 of the
Historic Preservation Act. Coordination with the U.S. Fish and Wildlife
Service will include a Biological Assessment/Opinion for Endangered
Species Act and a Fish and Wildlife Coordination Act Report.
2. This notice serves to solicit comments from the public; federal,
state and local agencies and officials; Indian Tribes; and other
interested parties in order to consider and evaluate the impacts of
this proposed activity. Any comments received by us will be considered
during the preparation of this Supplemental Environmental Impact
Statement.
Luz D. Ortiz,
Army Federal Register Liaison.
[FR Doc. 01-20380 Filed 8-13-01; 8:45 am]
BILLING CODE 3710-GF-M
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)