Environmental Impact Statement: Waukesha County, WI
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: December 5, 2001 (Volume 66, Number 234)]
[Notices]
[Page 63289]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr05de01-139]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Environmental Impact Statement: Waukesha County, WI
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Supplemental notice of intent.
-----------------------------------------------------------------------
SUMMARY: The FHWA is issuing this notice to advise the public that an
environmental impact statement will be prepared for transportation
improvements in the State Trunk Highway (STH) 83 corridor between
County Trunk Highway (CTH) ``NN'' at the north limits of the Village of
Mukwonago and STH 16, Waukesha County, Wisconsin. The north terminus
was extended since the notice of intent was published in the Federal
Register on March 26, 2001 (66 FR 16520).
FOR FURTHER INFORMATION CONTACT: Mr. Richard C. Madrzak, Field
Operations Engineer, Federal Highway Administration, 567 D'Onofrio
Drive, Madison, Wisconsin, 53719-2814; telephone: (608) 829-7510. You
may also contact Ms. Carol Cutshall, Director, Bureau of Environment,
Wisconsin Department of Transportation, P.O. Box 7965, Madison,
Wisconsin, 53707-7965; telephone: (608) 266-9626.
SUPPLEMENTARY INFORMATION:
Electronic Access
An electronic copy of this document may be downloaded by using a
computer, modem and suitable communications software from the
Government Printing Offices' Electronic Bulletin Board Service at (202)
512-1661. Internet users may reach the Office of Federal Register's
home page at: http://www.nara.gov/fedreg
and the Government Printing
Offices' database at: http://www.access.gpo.gov/nara.
Background
The FHWA, in cooperation with the Wisconsin Department of
Transportation, will prepare a Draft Environmental Impact Statement
(EIS) on a proposal to provide safety, operational and capacity
improvements on an approximate 27 kilometer (17 mile) section of STH 83
between CTH ``NN'' at the north limits of the Village of Mukwonago and
STH 16, Waukesha County.
This notice is supplementary to the notice of intent, which was
published in the Federal Register on March 26, 2001 at 66 FR 16520. The
purpose of the supplemental notice of intent is to extend the project
limits about 6 kilometers (4 miles) at the north terminus. The previous
north terminus was Interstate Highway 94. The revised north terminus is
STH 16.
To ensure that the full range of issues related to this proposed
action are addressed, and all substantive issues are identified,
comments and suggestions are invited from all interested parties.
Comments or questions concerning this proposed action and the EIS
should be directed to FHWA or the Wisconsin Department of
Transportation at the addresses provided in the caption FOR FURTHER
INFORMATION CONTACT.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Planning and Construction. The regulations implementing
Executive Order 12372 regarding intergovernmental consultation on
Federal programs and activities apply to this program)
Authority: 23 U.S.C. 315; 49 CFR 1.48.
Issued on: November 29, 2001.
Richard C. Madrzak,
Field Operations Engineer, Federal Highway Administration, Madison,
Wisconsin.
[FR Doc. 01-30086 Filed 12-4-01; 8:45 am]
BILLING CODE 4910-22-M
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)