Jump to main content.


Environmental Impact Statement: Waukesha County, WI

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: December 5, 2001 (Volume 66, Number 234)]
[Notices]
[Page 63289]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr05de01-139]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
 
Environmental Impact Statement: Waukesha County, WI

AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Supplemental notice of intent.

-----------------------------------------------------------------------

SUMMARY: The FHWA is issuing this notice to advise the public that an 
environmental impact statement will be prepared for transportation 
improvements in the State Trunk Highway (STH) 83 corridor between 
County Trunk Highway (CTH) ``NN'' at the north limits of the Village of 
Mukwonago and STH 16, Waukesha County, Wisconsin. The north terminus 
was extended since the notice of intent was published in the Federal 
Register on March 26, 2001 (66 FR 16520).

FOR FURTHER INFORMATION CONTACT: Mr. Richard C. Madrzak, Field 
Operations Engineer, Federal Highway Administration, 567 D'Onofrio 
Drive, Madison, Wisconsin, 53719-2814; telephone: (608) 829-7510. You 
may also contact Ms. Carol Cutshall, Director, Bureau of Environment, 
Wisconsin Department of Transportation, P.O. Box 7965, Madison, 
Wisconsin, 53707-7965; telephone: (608) 266-9626.

SUPPLEMENTARY INFORMATION:

Electronic Access

    An electronic copy of this document may be downloaded by using a 
computer, modem and suitable communications software from the 
Government Printing Offices' Electronic Bulletin Board Service at (202) 
512-1661. Internet users may reach the Office of Federal Register's 
home page at: http://www.nara.gov/fedreg Exit E.P.A. and the Government Printing 
Offices' database at: http://www.access.gpo.gov/nara. Exit E.P.A.

Background

    The FHWA, in cooperation with the Wisconsin Department of 
Transportation, will prepare a Draft Environmental Impact Statement 
(EIS) on a proposal to provide safety, operational and capacity 
improvements on an approximate 27 kilometer (17 mile) section of STH 83 
between CTH ``NN'' at the north limits of the Village of Mukwonago and 
STH 16, Waukesha County.
    This notice is supplementary to the notice of intent, which was 
published in the Federal Register on March 26, 2001 at 66 FR 16520. The 
purpose of the supplemental notice of intent is to extend the project 
limits about 6 kilometers (4 miles) at the north terminus. The previous 
north terminus was Interstate Highway 94. The revised north terminus is 
STH 16.
    To ensure that the full range of issues related to this proposed 
action are addressed, and all substantive issues are identified, 
comments and suggestions are invited from all interested parties. 
Comments or questions concerning this proposed action and the EIS 
should be directed to FHWA or the Wisconsin Department of 
Transportation at the addresses provided in the caption FOR FURTHER 
INFORMATION CONTACT.

(Catalog of Federal Domestic Assistance Program Number 20.205, 
Highway Planning and Construction. The regulations implementing 
Executive Order 12372 regarding intergovernmental consultation on 
Federal programs and activities apply to this program)

    Authority: 23 U.S.C. 315; 49 CFR 1.48.

    Issued on: November 29, 2001.
Richard C. Madrzak,
Field Operations Engineer, Federal Highway Administration, Madison, 
Wisconsin.
[FR Doc. 01-30086 Filed 12-4-01; 8:45 am]
BILLING CODE 4910-22-M 

 
 


Local Navigation


Jump to main content.