Notice of Application Accepted for Filing and Soliciting Comments, Protests, and Motions To Intervene

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: June 13, 2001 (Volume 66, Number 114)]
[Notices]
[Page 31903-31904]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr13jn01-49]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
 
Notice of Application Accepted for Filing and Soliciting 
Comments, Protests, and Motions To Intervene

June 7, 2001.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: 12009-000.
    c. Date filed: April 26, 2001.
    d. Applicant: Symbiotics, LLC.
    e. Name and Location of Project: The Mathews Dam Project would be 
located on the Santa Ana River in Riverside County, California. The 
project would be located on an existing dam owned by the Metropolitan 
Water District.
    f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    g. Applicant contact: Mr. Brent L. Smith, President, Northwest 
Power Services, Inc., P.O. Box 535, Rigby, ID 83442, (208) 745-8630, 
fax (208) 745-7909.
    h. FERC Contact: Tom Papsidero, (202) 219-2715.
    i. Deadline for filing comments, protests, and motions to 
intervene: 60 days from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE, Washington, DC 20426. Motions to intervene, protests, 
and comments may be fled electronically via the internet in lieu of 
paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's web site at http://www.ferc.fed.us/efi/doorbell.htm.
    Please include the projected number (P-12009-000) on any comments 
or motions filed. The Commission's Rules of Practice and Procedure 
require all interveners filing documents with the Commission to serve a 
copy of that document on each person in the official service list for 
the project. Further, if an intervener files comments or documents with 
the Commission relating to the merits of an issue that may affect the

[[Page 31904]]

responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    j. Description of Project: The proposed project would use the 
existing Mathews Reservoir which has a surface area of 2,750 acres and 
a storage capacity of 182,000 acre-feet at 1,404 feet msl and include: 
(1) A proposed powerhouse with a total installed capacity of 4.4 
megawatts; (2) a proposed 200-foot-long, 10-foot-diameter penstock; (3) 
a proposed 5-mile-long, 15 kv transmission line; and (4) appurtenant 
facilities. The project would operate in a run-of-river mode and would 
have an average annual generation of 29.5 GWh.
    k. A copy of the application is available for inspection and 
reproduction at the Commission's Public Reference Room, located at 888 
First Street, NE, Room 2A, Washington, DC 20426, or by calling (202) 
208-1371. The application may be viewed on http://www.ferc.fed.us/
online/rims.htm (call (202) 208-2222 for assistance). A copy is also 
available for inspection and reproduction at the address in item g 
above.
    l. Preliminary Permit--Anyone desiring to file a competing 
application for preliminary permit for a proposed project must submit 
the competing application itself, or a notice of intent to file such an 
application, to the Commission on or before the specified comment date 
for the particular application (see 18 CFR 4.36). Submission of a 
timely notice of intent allows an interested person to file the 
competing preliminary permit application no later than 30 days after 
the specified comment date for the particular application. A competing 
preliminary permit application must conform with 18 CFR 4.30(b) and 
4.36.
    m. Preliminary Permit--Any qualified development applicant desiring 
to file a competing development application must submit to the 
Commission, on or before a specified comment date for the particular 
application, either a competing development application or a notice of 
intent to file such an application. Submission of a timely notice of 
intent to file a development application allows an interested person to 
file the competing application no later than 120 days after the 
specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    n. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    o. Proposed Scope of Studies under Permit--A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    p. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    q. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT 
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', 
``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, and the Project 
Number of the particular application to which the filing refers. Any of 
the above-named documents must be filed by providing the original and 
the number of copies provided by the Commission's regulations to: The 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, 
Washington, DC 20426. An additional copy must be sent to Director, 
Division of Hydropower Administration and Compliance, Federal Energy 
Regulatory Commission, at the above-mentioned address. A copy of any 
notice of intent, competing application or motion to intervene must 
also be served upon each representative of the Applicant specified in 
the particular application.
    r. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

David P. Boergers,
Secretary.