Environmental Impact Statements; Notice of Availability
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: June 15, 2001 (Volume 66, Number 116)]
[Notices]
[Page 32616-32617]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15jn01-58]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6618-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency
Office of Federal Activities, General Information (202)564-7167
http://es.epa.gov/oeca/main/offices/ofa.html receipt of Environmental Impact
Statements Filed June 04, 2001 Through June 08, 2001 Pursuant to 40 CFR
1506.9.
EIS No. 010204, FINAL SUPPLEMENT, EPA, MO, Lower Meramec Basin
Wastewater Management Plan, Proposed New Regional Wastewater Treatment
Plan and Associated Facilities, St. Louis and JeffersonCounties, MO,
Wait Period Ends: July 16, 2001,Contact: Joe Cothern (913) 551-7148.
EIS No. 010205, FINAL EIS, NPS, NJ, Maurice National Scenic and
Recreational River (NS&RR) Comprehensive Management Plan,
Implementation, Atlantic and Cumberland Counties, NJ, Wait Period Ends:
July 16, 2001, Contact: Mary Vaura (215) 597-9175.
EIS No. 010206, FINAL EIS, NRC, GA, Generic EIS--Edwin I. Hatch Nuclear
Plant, Unit 1 and 2,License Renewal of Nuclear Plants, Supplement 4 to
NUREG-1437, Altamaha River, Appling County, GA,Wait Period Ends: July
16, 2001, Contact: Andrew J. Kugler (301) 415-2828.
EIS No. 010207, DRAFT EIS, GSA, CA, Los Angeles Federal Building--U. S.
Courthouse, Construction of a New Courthouse in the Civic Center, City
of Los Angeles, Los Angeles County, CA, Comment Period Ends: July 30,
2001, Contact: Javad Soltani (415) 522-3493.
EIS No. 010208, DRAFT EIS, NPS, TX, Lake Meredith National Recreation
Area and Alibates Flint Quarries National Monument Oil and Gas
Management Plan, Hutchinson, Moore and Potter Counties, TX, Comment
Period Ends: August 15, 2001, Contact: John C. Benjamin (806) 857-3151.
EIS No. 010209, FINAL EIS, USN, CA, Naval Station(NAVSTA) San Diego
Replacement Pier and DredgingImprovements, Construction, Dredging and
DredgedMaterial Disposal, San Diego Naval Complex, SanDiego, CA, Wait
Period Ends: July 16, 2001, Contact: Grace S. Penafuerte (619) 556-
7773.
EIS No. 010210, DRAFT EIS, TVA, TN, Addition of Electric Generation
Baseload Capacity, Proposes to Construction a Natural Gas Fired
Combined Cycle Power Plant, Franklin County, TN, Comment Period Ends:
July 30, 2001, Contact: Bruce L. Yeager (865) 632-8051.
EIS No. 010211, DRAFT EIS, FRC, WA, Cowlitz River Hydroelectric Project
(No. 2016-044), Relicensing of the Existing 462-megawatt, Cowlitz
River, City of Tacoma, WA, Comment Period Ends: July 30, 2001, Contact:
David Turner (202) 219-2844.
EIS No. 010212, FINAL EIS, USN, VA, Marine Corps Heritage Center (MCHC)
Complex, Construction and Operation at Marine Corps Base (MCB)
Quantico, VA, Wait Period Ends: July 16, 2001, Contact: Hank Riek (202)
685-3064.
EIS No. 010213, DRAFT SUPPLEMENT, UMC, AZ, CA, Yuma Training Range
Complex Management, Additional Information on the Cumulative Impacts of
Activities on the Sonoran
[[Page 32617]]
pronghorn (Antilocapra americana sonorienisis), Marine Corps Air
Station Yuma, Goldwater Range, Yuma and La Paz Cos., AZ and Chocolate
Mountain Range,Imperial and Riverside, CA, Comment Period Ends: July
30, 2001,Contact: Deb Theroux (619) 532-1162.
Amended Notices
EIS No. 010184, FINAL EIS, FHW, TX, US Highway 183 Alternate Project,
Improvements from RM-620 to Approximately Three Miles North of the City
of Leander, Williamson County, TX, Due: July 16, 2001, Contact: Patrick
Bauer (512) 536-5950. Revision of Federal Register Notice Published on
05/25/2001: CEQ Review Period Ending 06/25/2001 has been Extended to
07/16/2001, also correction to contact telephone number.
EIS No. 010092, DRAFT EIS, AFS, ID, Clean Slate Ecosystem Management
Project, Aquatic and Terrestrial Restoration, Nez Perce NationalForest,
Salmon River Ranger District, IdahoCounty ID, Due: June 20, 2001,
Contact: BillShields (208) 839-2211. Revision of Federal Register
Notice Published on 05/23/2001: CEQ Review Period Ending 05/07/2001 has
been extended to 06/20/2001.
EIS No. 010131, Draft EIS, UAF, VA, Initial F-22 Operational Wing
Beddown Replacing the Existing F-15C at Langley (AFB) or one of the
Four Alternative Locations, VA, Due: June 25, 2001, Contact: Brenda
Cook (757) 764-5007. Revision of FR Notice Published on 04/27/2001: CEQ
Review Period Ending 06/11/2001 has been extended to 06/25/2001.
EIS No. 010161, Draft EIS, USA, CO, Pueblo Chemical Depot, Destruction
of Chemical Munitions, Design, Construction, Operation and Closure of a
Facility, Pueblo County, CO, Due: August 09, 2001, Contact: Penny
Robitaille (410) 436-4178. Revision of FR Notice Published on 05/11/
2001: CEQ Review Period Ending 06/25/2001 has been extended to 08/09/
2001.
EIS No. 010162, Draft EIS, DOD, AL, CO, AR, KY, Assembled Chemical
Weapons Destruction Technologies at One or More Sites: Design,
Construction and Operation of One or More Pilot Test Facilities,
Anniston Army Depot, AL; Pine Bluff Arsenal, AR; Blue Grass Army Depot,
KY and Pueblo Chemical Depot, CO, Due: August 09, 2001, Contact: Jon
Ware (410) 436-2210. Revision of FR Notice Published on 05/11/2001: CEQ
Review Period Ending on 06/25/2001 has been Extended to 08/09/2001.
Dated: June 12, 2001.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 01-15169 Filed 6-14-01; 8:45 am]
BILLING CODE 6560-50-U
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)