Jump to main content.


Environmental Impact Statements; Notice of Availability

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: June 15, 2001 (Volume 66, Number 116)]
[Notices]
[Page 32616-32617]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15jn01-58]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6618-9]

Environmental Impact Statements; Notice of Availability

Responsible Agency

    Office of Federal Activities, General Information (202)564-7167 
http://es.epa.gov/oeca/main/offices/ofa.html receipt of Environmental Impact 
Statements Filed June 04, 2001 Through June 08, 2001 Pursuant to 40 CFR 
1506.9.
EIS No. 010204, FINAL SUPPLEMENT, EPA, MO, Lower Meramec Basin 
Wastewater Management Plan, Proposed New Regional Wastewater Treatment 
Plan and Associated Facilities, St. Louis and JeffersonCounties, MO, 
Wait Period Ends: July 16, 2001,Contact: Joe Cothern (913) 551-7148.
EIS No. 010205, FINAL EIS, NPS, NJ, Maurice National Scenic and 
Recreational River (NS&RR) Comprehensive Management Plan, 
Implementation, Atlantic and Cumberland Counties, NJ, Wait Period Ends: 
July 16, 2001, Contact: Mary Vaura (215) 597-9175.
EIS No. 010206, FINAL EIS, NRC, GA, Generic EIS--Edwin I. Hatch Nuclear 
Plant, Unit 1 and 2,License Renewal of Nuclear Plants, Supplement 4 to 
NUREG-1437, Altamaha River, Appling County, GA,Wait Period Ends: July 
16, 2001, Contact: Andrew J. Kugler (301) 415-2828.
EIS No. 010207, DRAFT EIS, GSA, CA, Los Angeles Federal Building--U. S. 
Courthouse, Construction of a New Courthouse in the Civic Center, City 
of Los Angeles, Los Angeles County, CA, Comment Period Ends: July 30, 
2001, Contact: Javad Soltani (415) 522-3493.
EIS No. 010208, DRAFT EIS, NPS, TX, Lake Meredith National Recreation 
Area and Alibates Flint Quarries National Monument Oil and Gas 
Management Plan, Hutchinson, Moore and Potter Counties, TX, Comment 
Period Ends: August 15, 2001, Contact: John C. Benjamin (806) 857-3151.
EIS No. 010209, FINAL EIS, USN, CA, Naval Station(NAVSTA) San Diego 
Replacement Pier and DredgingImprovements, Construction, Dredging and 
DredgedMaterial Disposal, San Diego Naval Complex, SanDiego, CA, Wait 
Period Ends: July 16, 2001, Contact: Grace S. Penafuerte (619) 556-
7773.
EIS No. 010210, DRAFT EIS, TVA, TN, Addition of Electric Generation 
Baseload Capacity, Proposes to Construction a Natural Gas Fired 
Combined Cycle Power Plant, Franklin County, TN, Comment Period Ends: 
July 30, 2001, Contact: Bruce L. Yeager (865) 632-8051.
EIS No. 010211, DRAFT EIS, FRC, WA, Cowlitz River Hydroelectric Project 
(No. 2016-044), Relicensing of the Existing 462-megawatt, Cowlitz 
River, City of Tacoma, WA, Comment Period Ends: July 30, 2001, Contact: 
David Turner (202) 219-2844.
EIS No. 010212, FINAL EIS, USN, VA, Marine Corps Heritage Center (MCHC) 
Complex, Construction and Operation at Marine Corps Base (MCB) 
Quantico, VA, Wait Period Ends: July 16, 2001, Contact: Hank Riek (202) 
685-3064.
EIS No. 010213, DRAFT SUPPLEMENT, UMC, AZ, CA, Yuma Training Range 
Complex Management, Additional Information on the Cumulative Impacts of 
Activities on the Sonoran

[[Page 32617]]

pronghorn (Antilocapra americana sonorienisis), Marine Corps Air 
Station Yuma, Goldwater Range, Yuma and La Paz Cos., AZ and Chocolate 
Mountain Range,Imperial and Riverside, CA, Comment Period Ends: July 
30, 2001,Contact: Deb Theroux (619) 532-1162.

Amended Notices

EIS No. 010184, FINAL EIS, FHW, TX, US Highway 183 Alternate Project, 
Improvements from RM-620 to Approximately Three Miles North of the City 
of Leander, Williamson County, TX, Due: July 16, 2001, Contact: Patrick 
Bauer (512) 536-5950. Revision of Federal Register Notice Published on 
05/25/2001: CEQ Review Period Ending 06/25/2001 has been Extended to 
07/16/2001, also correction to contact telephone number.
EIS No. 010092, DRAFT EIS, AFS, ID, Clean Slate Ecosystem Management 
Project, Aquatic and Terrestrial Restoration, Nez Perce NationalForest, 
Salmon River Ranger District, IdahoCounty ID, Due: June 20, 2001, 
Contact: BillShields (208) 839-2211. Revision of Federal Register 
Notice Published on 05/23/2001: CEQ Review Period Ending 05/07/2001 has 
been extended to 06/20/2001.
EIS No. 010131, Draft EIS, UAF, VA, Initial F-22 Operational Wing 
Beddown Replacing the Existing F-15C at Langley (AFB) or one of the 
Four Alternative Locations, VA, Due: June 25, 2001, Contact: Brenda 
Cook (757) 764-5007. Revision of FR Notice Published on 04/27/2001: CEQ 
Review Period Ending 06/11/2001 has been extended to 06/25/2001.
EIS No. 010161, Draft EIS, USA, CO, Pueblo Chemical Depot, Destruction 
of Chemical Munitions, Design, Construction, Operation and Closure of a 
Facility, Pueblo County, CO, Due: August 09, 2001, Contact: Penny 
Robitaille (410) 436-4178. Revision of FR Notice Published on 05/11/
2001: CEQ Review Period Ending 06/25/2001 has been extended to 08/09/
2001.
EIS No. 010162, Draft EIS, DOD, AL, CO, AR, KY, Assembled Chemical 
Weapons Destruction Technologies at One or More Sites: Design, 
Construction and Operation of One or More Pilot Test Facilities, 
Anniston Army Depot, AL; Pine Bluff Arsenal, AR; Blue Grass Army Depot, 
KY and Pueblo Chemical Depot, CO, Due: August 09, 2001, Contact: Jon 
Ware (410) 436-2210. Revision of FR Notice Published on 05/11/2001: CEQ 
Review Period Ending on 06/25/2001 has been Extended to 08/09/2001.

    Dated: June 12, 2001.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 01-15169 Filed 6-14-01; 8:45 am]
BILLING CODE 6560-50-U 

 
 