Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


 [Federal Register: March 19, 2001 (Volume 66, Number 53)]
[Notices]
[Page 15418-15419]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19mr01-51]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting Motions
To Intervene and Protests

March 13, 2001.
    Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: P-11884-000.
    c. Date Filed: February 7, 2001.
    d. Applicant: City of Twin Falls, Idaho.
    e. Name of Project: Auger Falls Project.
    f. Location: On the Snake River, in Twin Falls County, Idaho. No
federal facilities or land would be used.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Secs. 791(a)-
825(r).
    h. Applicant Contact: Mr. Tom Courtney, City Manager, 321 Second
Avenue East, P.O. Box 1907, Twin Falls, Idaho 83303-1907, (208) 735-
7271.
    i. FERC Contact: Any questions on this notice should be addressed
to Robert Bell at (202) 219-2806.
    j. Deadline Date: 60 days from the issuance date of this notice.
    k. Competing Application: Project No. 11871-000, Date Filed:
January 11, 2001, Due Date: April 12, 1999.
    All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments recommendation,
interventions, and protests, may be electronically filed via the
internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's web site at
http://www.ferc.fed.us/efi/doorbell.htm.
    The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
    l. Description of Project: The proposed project would consist of:
(1) A proposed 340-long, 12-foot-high concrete diversion structure; (2)
a proposed impoundment having a surface area of 50 acres with
negligible storage and a normal water surface elevation of 2,118 feet
msl; (3) a three proposed 670-foot-long, 12-foot-diameter steel
penstocks; (4) a proposed powerhouse containing three generating units
having a total installed capacity of 43.6 MW; (5) a proposed 0.75-mile-
long, 138 kV transmission line; and (6) appurtenant facilities.
    Applicant estimates that the average annual generation would be
157.6 GWh and would be sold to local utility.
    m. Locations of the application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Washington, DC 20426,
or by calling (202) 208-1371. This filing may be viewed on the web at
http://www.ferc.fed.us/online/rims.htm (call (202) 208-2222 or
assistance). A copy is also available for inspection and reproduction
at the address in item h above.
    n. Preliminary Permit--Public notice of the filing of the initial
preliminary permit application, which has already been given,
established the due date for filing competing preliminary permit
applications or notices of intent. Any competing preliminary permit or
development application or notice of intent to file a competing
preliminary permit or development application must be filed in response
to and in compliance with the public notice of the initial preliminary
permit application. No competing applications or notices of intent to
file competing applications may be filed in response to this notice. A
competing license application must conform with 18 CFR 4.30 (b) and
4.36.
    o. Proposed Scope of Studies under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
    p. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a

[[Page 15419]]

party to the proceeding. Any comments, protests, or motions to
intervene must be received on or before the specified comment date for
the particular application.
    q. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', ``MOTION TO INTERVENE'', as applicable, and the Project
Number of the particular application to which the filing refers. Any of
the above-named documents must be filed by providing the original and
the number of copies provided by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. An additional copy must be sent to Director,
Division of Project Review, Federal Energy Regulatory Commission, at
the above-mentioned address. A copy of any notice of intent, competing
application or motion to intervene must also be served upon each
representative of the Applicant specified in the particular
application.
    r. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.

David P. Boergers,
Secretary.
[FR Doc. 01-6657 Filed 3-16-01; 8:45 am]