Notice of Intent; NV
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: November 7, 2001 (Volume 66, Number 216)]
[Notices]
[Page 56337]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr07no01-95]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[NV-930-1430-ER]
Notice of Intent; NV
AGENCY: Bureau of Land Management, Interior.
ACTION: Amended notice of intent to prepare an environmental impact
statement (EIS) to consider the Toquop Energy Project/Lincoln County
well field, water pipeline, power plant site, and access road rights-
of-way in southeastern Lincoln County, Nevada and related exchange of
public land in Lincoln County, Nevada for private land in Washoe
County, Nevada and to amend the Caliente Management Framework Plan to
address the proposed exchange of public land in Lincoln County, Nevada
(to be used in part as the site of the Toquop Energy Project) for
private land in Washoe County, Nevada.
-----------------------------------------------------------------------
SUMMARY: On July 27, 2001, notice was published in the Federal Register
(Volume 66, Number 145, Page 39193) announcing the intent of the Bureau
of Land Management to prepare an EIS to consider the Toquop Energy
Project/Lincoln County well field, water pipeline, and access road
rights-of-way in southeastern Lincoln County, Nevada. The public
comment period on the scope of the EIS closed on September 10, 2001. As
a result of public comments received during the scoping period, the
Bureau of Land Management intends to incorporate a proposed exchange of
public land in Lincoln County, Nevada (to be used in part as the site
of the Toquop Energy Project) for private land in Washoe County, Nevada
within the scope of the EIS. Previously, the land exchange was being
considered in a separate environmental assessment. In addition, the
Bureau of Land Management will prepare an amendment to the Caliente
Management Framework to address the proposed land exchange.
ADDRESSES: Written comments should be addressed to Bureau of Land
Management, Gene A. Kolkman, Ely Field Manager, HC 33, Box 33500, Ely,
Nevada 89301-9408.
FOR FURTHER INFORMATION: Daniel R. Netcher, Team Leader for Lands and
Minerals, at the above address or telephone (775) 289-1872.
SUPPLEMENTARY INFORMATION: Toquop Energy has proposed an 1100 megawatt
electrical generation facility fueled by natural gas from the Kern
River gas pipeline. The facility is proposed to be located at T. 11 S.,
R. 69 E., Section 36, Mount Diablo Meridian. The facility would be
located on lands which are currently public lands and would be the
subject of a land exchange. Nevada Land and Resource Company has
proposed to exchange private land in Washoe County, Nevada for public
land in Lincoln County, Nevada, a portion of which will be used as the
site for the power plant. Toquop Energy has submitted an application
for a Federal Land Policy and Management Act right-of-way for the power
plant site, road access, well field, and water pipeline access to the
facility. The Bureau of Land Management will prepare a proposed
amendment to the Caliente Management Framework Plan to address the land
exchange. This EIS will evaluate the proposed Management Framework Plan
amendment, the proposed land exchange and the proposed right-of-way
action. The EIS will consider a No Action alternative and other
alternatives including alternate locations and alignment of the well
field, water pipelines, power plant site, and access road.
Public Involvement: Public informational meetings for the Toquop
Energy Project EIS were held July 11, 2001, in Caliente, Nevada and
July 12, 2001, in Mesquite, Nevada. A scoping meeting for the Toquop
Energy Project EIS was held August 15, 2001, in Las Vegas, Nevada.
Public scoping meetings for the Pah Rah/Toquop Land Exchange were held
July 11, 2001, in Mesquite, Nevada and July 12, 2001, in Reno, Nevada.
The public is encouraged to provide additional written comments on the
Bureau of Land Management's intent to prepare a proposed amendment to
the Caliente Management Framework plan and to address the proposed
amendment and related land exchange in the EIS for the Toquop Energy
Project. The comment period for the scoping of the EIS will commence
with the publication of the Notice. Those who have comments on the EIS
should respond in writing within 30 days from the date of publication
of the Notice. The Notice will be distributed by mail on or about the
date of publication of the Notice in the Notice publication. Release of
the draft amendment to the Caliente Management Framework Plan and the
draft EIS regarding the amendment, the related land exchange and the
Toquop Energy Project will be announced in the local news media, as
these dates are established.
Dated: October 4, 2001.
Eric K. Luse,
Associate Field Manager.
[FR Doc. 01-27926 Filed 11-6-01; 8:45 am]