Rehabilitation of Floodwater Retarding Structure No. 3C of the East Fork Above Lavon Watershed of the Trinity River Watershed, Collin County, TX
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: August 27, 2002 (Volume 67, Number 166)]
[Notices]
[Page 54999]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr27au02-29]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Natural Resources Conservation Service
Rehabilitation of Floodwater Retarding Structure No. 3C of the
East Fork Above Lavon Watershed of the Trinity River Watershed, Collin
County, TX
AGENCY: Natural Resources Conservation Service, USDA.
ACTION: Notice of a finding of no significant impact.
-----------------------------------------------------------------------
SUMMARY: Pursuant to section 102(2)(c) of the National Environmental
Policy Act of 1969; the Council on Environmental Quality Regulations
(40 CFR part 1500); and the Natural Resources Conservation Service
Regulations (7 CFR part 650); the Natural Resources Conservation
Service, U.S. Department of Agriculture, gives notice that an
environmental impact statement is not being prepared for the
rehabilitation of Floodwater Retarding Structure No. 3C of the East
Fork Above Lavon Watershed of the Trinity River Watershed.
FOR FURTHER INFORMATION CONTACT: Tomas M. Dominquez, Acting State
Conservationist, Natural Resources Conservation Service, 101 South
Main, Temple, Texas 76501-7682, Telephone (254) 742-9800.
SUPPLEMENTARY INFORMATION: The environmental assessment of this
federally assisted action indicates that the project will not cause
significant local, regional, or national impacts on the environment. As
a result of these findings, Tomas M. Dominquez, Acting State
Conservationist, has determined that the preparation and review of an
environmental impact statement is not needed for this project.
The project will rehabilitate Floodwater Retarding Structure No. 3C
to maintain the present level of flood control benefits and comply with
the current performance and safety standards.
Rehabilitation of the site will require the disturbance of 3.59
acres. A new 30 inch principal spilllway and an additional auxiliary
spillway 180 feet wide will be installed. The disturbed areas will be
planted to plants that have wildlife values. The proposed work will not
affect any prime farmland, endangered or threatened species, wetlands,
or cultural resources.
Federal assistance will be provided under authority of the Small
Watershed Rehabilitation Amendments of 2000 (Section 313, Pub. L. 106-
472). Total project costs is estimated to be $1,215,700, of which
$790,205 will be paid from the Small Watershed Rehabilitation funds and
$425,495 from local funds.
The notice of a Finding of No Significant Impact (FONSI) has been
forwarded to the Environmental Protection Agency and to various
Federal, State, and local agencies and interested parties. A limited
number of copies of the FONSI are available to fill single copy
requests at the above address. Basic data developed during the
environmental assessment are on file and may be reviewed by contacting
Tomas M. Dominquez, Acting State Conservationist.
No administrative action on implementation of the proposal will be
taken until 30 days after the date of this publication in the Federal
Register.
Dated: August 13, 2002.
Tomas M. Dominquez,
Acting State Conservationist.
[FR Doc. 02-21715 Filed 8-26-02; 8:45 am]
BILLING CODE 3410-16-P