Application to Export Electric Energy; Emera Energy Services, Inc.
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: February 19, 2002 (Volume 67, Number 33)]
[Notices]
[Page 7362]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr19fe02-53]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket Nos. EA-257]
Application to Export Electric Energy; Emera Energy Services,
Inc.
AGENCY: Office of Fossil Energy, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Emera Energy Services, Inc. (EES) has applied to export
electric energy from the United States to Canada, pursuant to section
202(e) of the Federal Power Act.
DATES: Comments, protests or requests to intervene must be submitted on
or before March 21, 2002.
ADDRESSES: Comments, protests or requests to intervene should be
addressed as follows: Office of Coal & Power Import/Export (FE-27),
Office of Fossil Energy, U.S. Department of Energy, 1000 Independence
Avenue, SW., Washington, DC 20585-0350 (FAX 202-287-5736).
FOR FURTHER INFORMATION CONTACT: Xavier Puslowski (Program Office) 202-
586-4708 or Michael Skinker (Program Attorney) 202-586-6667.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated and require authorization
under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.
Sec. 824a(e)).
On January 10, 2002, EES applied to the Department of Energy
(``DOE) for authority to export electric energy from the Unites States
to Canada. EES, a Delaware corporation with its principal place of
business in Bangor, Maine, is a wholly-owned indirect subsidiary of
Emera Incorporated, a Nova Scotia corporation that is a diversified
energy and services company. EES does not own or control any electric
generation or transmission facilities nor does it have a franchised
service area. Emera Incorporated owns and operates transmission
facilities in the United States through its operating divisions. EES
will be engaged in the marketing of power as both a broker and as a
marketer of electric power at wholesale. EES plans to purchase the
power that it will sell from cogeneration facilities, federal power
marketing agencies, electric utilities and exempt wholesale generators
within the United States.
In FE Docket No. EA-257, EES proposes to export electric energy to
Canada and to arrange for the delivery of those exports to Canada over
the international transmission facilities owned by Citizens Utilities,
Eastern Maine Electric Cooperative, Joint Owners of the Highgate
Project, Maine Electric Power Company, Maine Public Service Company and
Vermont Electric Transmission Company.
The construction of each of the international transmission
facilities to be utilized by EES has previously been authorized by a
Presidential permit issued pursuant to Executive Order 10485, as
amended.
Procedural Matters: Any person desiring to become a party to this
proceeding or to be heard by filing comments or protests to this
application should file a petition to intervene, comment or protest at
the address provided above in accordance with Secs. 385.211 or 385.214
of the FERC's Rules of Practice and Procedures (18 CFR 385.211,
385.214). Fifteen copies of each petition and protest should be filed
with the DOE on or before the date listed above.
Comments on the EES application to export electric energy to Canada
should be clearly marked with Docket EA-257. Additional copies are to
be filed directly with Calvin Bell, Emera Energy Services, Inc., One
Cumberland Place, Suite 102, Bangor, ME 04401, Michael E. Small, Wendy
N. Reed, Wright & Talisman, P.C., 1200 G Street, NW., Suite 600,
Washington, DC 20005 AND Mr. Richard J. Smith, Secretary and General
Counsel, Emera Incorporated, 1894 Barington Street, 18th Floor,
Barrington Tower, PO Box 910, Halifax, Nova Scotia, CANADA B3J 2W5.
A final decision will be made on this application after the
environmental impact has been evaluated pursuant to the National
Environmental Policy Act of 1969, and a determination is made by the
DOE that the proposed action will not adversely impact on the
reliability of the U.S. electric power supply system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above or by
accessing the Fossil Energy Home Page at http://www.fe.doe.gov.
Upon
reaching the Fossil Energy Home page, select ``Regulatory'' Programs,''
then ``Electricity Regulation,'' and then ``Pending Proceedings'' from
the options menus.
Issued in Washington, DC, on February 8, 2002.
Anthony J. Como,
Deputy Director, Electric Power Regulation, Office of Coal & Power
Import/Export, Office of Coal & Power Systems, Office of Fossil Energy.
[FR Doc. 02-3887 Filed 2-15-02; 8:45 am]
BILLING CODE 6450-01-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)