Notice of Additional Public Hearing in the City of Washington, NC (Beaufort County) and Extension of Public Comment Period for the Draft Environmental Impact Statement and Draft Clean Air Act Conformity Determination for Introduction of F/A-18 E/F (Super Hornet) Aircraft to the East Coast of the United States
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: September 11, 2002 (Volume 67, Number 176)]
[Notices]
[Page 57583]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr11se02-35]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Navy
Notice of Additional Public Hearing in the City of Washington, NC
(Beaufort County) and Extension of Public Comment Period for the Draft
Environmental Impact Statement and Draft Clean Air Act Conformity
Determination for Introduction of F/A-18 E/F (Super Hornet) Aircraft to
the East Coast of the United States
AGENCY: Department of the Navy, DOD.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: Pursuant to section 102(2) of the National Environmental
Policy Act, of 1969 and the regulations implemented by the Council on
Environmental Quality (40 CFR parts 1500-1508), the Department of the
Navy prepared and filed a Draft Environmental Impact Statement (DEIS)
and Draft Clean Air Act (CAA) Conformity Determination with the
Environmental Protection Agency on July 26, 2002. An announcement of
public hearing dates and locations was published in the Federal
Register (Volume 67, Number 148) on August 1, 2002, and a Notice of
Availability was published in the Federal Register (Volume 67, Number
149) on August 2, 2002. At the public hearing held on August 29, 2002,
in Plymouth, NC, it was requested that another meeting be held in the
City of Washington in Beaufort County, NC. This notice announces the
date and location of an additional public hearing on the DEIS.
DATES AND ADDRESSES: A public hearing has been scheduled for September
26, 2002, at Washington High School, 400 Slatestown Road, Washington,
NC. An open information session will precede the scheduled public
hearing and will allow individuals to review the data presented in the
DEIS. The open information session is scheduled from 4:30 p.m. to 6:30
p.m., followed by the public hearing from 7 p.m. to 9:30 p.m.
Federal, State, and local agencies, as well as interested parties
are invited and urged to be present or represented at the hearing. Oral
statements will be heard and transcribed by a stenographer; however, to
ensure the accuracy of the record, all statements should be submitted
in writing. All statements, both oral and written, will become part of
the public record on the DEIS and Draft CAA Conformity Determination
and will be responded to in the Final Environmental Impact Statement
(EIS). Equal weight will be given to both oral and written statements.
In the interest of available time and to ensure all who wish to
give an oral statement have the opportunity to do so; each speaker's
comments will be limited to three (3) minutes. If a longer statement is
to be presented, it should be summarized at the public hearing and the
full text submitted in writing either at the hearing, mailed, or faxed
to the contact.
The Department of the Navy also announces that the public comment
period for the DEIS and Draft CAA Conformity Determination has been
extended from October 2, 2002, to October 11, 2002. The Notice of
Availability provided for a 60-day comment period on the DEIS which
would have ended on October 2, 2002. However, due to the fact that an
additional pubic hearing has been scheduled for September 26, 2002, the
Navy has extended the public comment period on the DEIS and Draft CAA
Conformity Determination to October 11, 2002. All comments on the DEIS
must be postmarked on or before October 11, 2002, to be considered in
the Final EIS. Comments may be mailed to: Commander, Atlantic Division,
Naval Facilities Engineering Command, Attn: Fred Pierson (Code BD32FP),
1510 Gilbert Street, Norfolk, VA 23511-2699, Fax (757) 322-4894.
A copy of the DEIS was distributed to the following library:
Beaufort County Library, 122 Van Norden, Washington, NC. An electronic
copy is also available for public viewing at: http://
www.efaircraft.ene.com.
FOR FURTHER INFORMATION CONTACT: Mr. Pierson, Atlantic Division, Naval
Facilities Engineering Command, Norfolk, VA at (757) 322-4935. A
limited number of single copies of the DEIS, Executive Summary, and
Draft CAA Conformity Determination are available upon request by
contacting Mr. Pierson.
Dated: September 9, 2002.
R.E. Vincent II,
Lieutenant Commander, Judge Advocate General's Corps, U.S. Navy,
Federal Register Liaison Officer.
[FR Doc. 02-23243 Filed 9-10-02; 8:45 am]
BILLING CODE 3810-FF-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)