Environmental Impact Statements and Regulations; Availability of EPA Comments
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: April 25, 2003 (Volume 68, Number 80)]
[Notices]
[Page 20386]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr25ap03-41]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6639-7]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in the Federal Register dated April 1, 2003 (68 FR 16511).
Draft EISs
ERP No. D-AFS-F65037-MI Rating LO, Interior Wetlands Project,
Timber Harvest, White Pine Trees Pruning, Growth System Adjustment,
Wildlife Openings Creation and Maintenance and Transportation System
Improvements, Hiawatha National Forest, Eastside Administrative Unit,
Chippewa County, MI.
Summary: EPA did not identify any potential environmental impacts
requiring substantive changes to the 2 main project alternatives. EPA
believes that A5 would better accomplish old growth stand improvement
and road conversion to forests and wetlands.
ERP No. D-AFS-J65371-WY Rating EC2, Medicine Bow National Forest
Revised Draft Land and Resource Management Plan, Implementation,
Albany, Carbon and Laramie Counties, WY.
Summary: EPA expressed environmental concerns that without
specifically outlining the baseline by which future projects are tiered
from this Plan, potential impacts to ecosystem processes, water and
habitat quality may occur.
ERP No. D-AFS-K61158-CA Rating EC2, Silver Pearl Land Exchange
Project, Proposal to Exchange 2,153 Acres of National Forest System
(NFS) Land for up to 3,963 Acres of Sierra Pacific Industries (SPI)
Land within the boundary of Eldorado National Forest, Eldorado and
Placer Counties, CA.
Summary: EPA expressed environmental concerns and requested
additional information regarding impacts to threatened and endangered
species and Forest Service sensitive species. EPA also requested
additional information on cumulative impacts.
ERP No. D-SFW-K99032-CA Rating EC2, Western Riverside County
Multiple Species Habitat Conservation Plan (MSHCP), Implementation,
Incidental Take Permits Issuance, Riverside and Orange County, CA.
Summary: EPA raised environmental concerns that information from
other regional plans has not been fully integrated with the analysis
and conclusions of the MSHCP. Other EPA concerns are the assumptions
regarding the level of species protection provided by Public/Quasi-
Public lands, the scientific basis of MSHCP assumptions and
conclusions, enforcement, and consultation with and evaluation of
potential impacts on Indian Tribes. EPA also recommended the Service
provide future opportunities for public and agency input, and consult
with Indian Tribes on a government-to-government basis.
ERP No. DS-COE-C36031-NY Rating LO, Irondequoit Creek at Panorama
Valley Flood Damage Reduction Project, New Information concerning
Resumption and Evaluation of a Flood Damage Reduction Project, Town of
Penfield, Monroe County, NY.
Summary: EPA has no objections to the implementation of the
proposed project.
ERP No. DS-DOE-L08055-WA Rating EC2, Kangley--Echo Lake
Transmission Line Project, New 500 Kilovolt (kV) Transmission Line
Construction, Updated Information concerning Re-evaluating Alternatives
not Analyzed, U.S. Army COE Section 10 and 404 Permits Issuance, King
County, WA.
Summary: EPA expressed environmental concerns with the lack of
clearly defined mitigation measures to protect drinking water sources
and ensure the integrity of the City of Seattle's Habitat Conservation
Plan. EPA recommended that the EIS not be finalized until such
mitigation has been determined. EPA also recommended that the final EIS
more clearly identify the significance of predicted effects of the
project.
Final EISs
ERP No. F-AFS-E65053-NC Croatan National Forest Revised Land and
Resource Management Plan (1986), Implementation, Carteret Craven and
Jones Counties, NC.
Summary: The final EIS is responsive to issues raised in the draft
EIS and EPA has no objections to the proposed action.
ERP No. F-AFS-J82016-MT Bitterroot National Forest Noxious Weed
Treatment Project, Ground and Aerial Herbicides Application,
Mechanical, Biological and Cultural Weed Treatment and Public Awareness
Measures, Implementation, Stevensville Ranger District, Bitterroot
National Forest, Ravalli County, MT.
Summary: EPA's review has not identified potential environmental
impacts requiring substantive changes to the proposal.
ERP No. F-AFS-L65403-WA Quartzite Watershed Management Project,
Watershed Management Activities including Vegetation Management,
Riparian/Wetland Management and Road Management, Colville National
Forest, Thomason Sherwood-Cottonwood Creek, Three Rivers Ranger
District, Stevens County, WA.
Summary: No formal comment letter was sent to the preparing agency.
ERP No. F-DOE-L08059-WA Schultz-Hanford Transmission Line Project,
New 500 kilovolt (kV) Transmission Line Construction, Central
Washington north of Hanford connecting to an existing line at the
Schultz Substation, Kittitas, Yakima, Grant and Benton Counties, WA.
Summary: No formal comment letter was sent to the preparing agency.
Dated: April 22, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-10273 Filed 4-24-03; 8:45 am]