Environmental Impact Statements; Notice of Availability
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: April 25, 2003 (Volume 68, Number 80)]
[Notices]
[Page 20386-20387]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr25ap03-42]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6639-6]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed April 14, 2003,
through April 18, 2003, pursuant to 40 CFR 1506.9.
[[Page 20387]]
EIS No. 030172, Final EIS, FTA, NC, South Corridor Light Rail Project
to Provide Light Rail Service between the Town of Pineville and
Downtown Charlotte, City of Charlotte, Charlotte-Mecklenburg County,
NC, Wait Period Ends: May 19, 2003, Contact: Alex McNeil (404) 562-
3511. The above FTA EIS should have appeared in the 04/18/03 Federal
Register. The 30-day Wait Period is Calculated from 04/18/2003.
EIS No. 030173, Final EIS, FRC, ID, Bear River Hydroelectric Project,
Application for a New License (Relicense) for Three Existing
Hydroelectric Projects: Soda (FERC No. 20-019), Grace-Cove (FERC No.
2401-007) and Oneida (FERC No. 472-017), Bear River Basin, Caribou and
Franklin Counties, ID, Wait Period Ends: May 27, 2003, Contact: Susan
O'Brian (202) 502-8449. This document is available on the Internet at:
http://www.ferc.gov.
EIS No. 030174, Final EIS, FHW, RI, Sakonnet River Bridge
Rehabilitation or Replacement Project, Portsmouth & Tiverton, Newport
County, RI, Wait Period Ends: May 27, 2003, Contact: Daniel J. Berman
(401) 528-2503.
EIS No. 030175, Final EIS, FHW, WV, KY, Appalachian Corridor I-66
Highway Construction, US 23/119 south of Pikeville, KY eastward to the
King Coal Highway southeast of Matewan, Funding and U.S. Army COE
Section 404 Permits Issuance, Pike County, KY and Mingo County, WV,
Wait Period Ends: May 27, 2003, Contact: Jose Sepulveda (502) 223-6720.
EIS No. 030176, Final EIS, FHW, NY, U.S. 219 between Springville to
Salamanca, Improvements from NY 39 to NY 17, PIN 5101.53, Funding and
U.S. Army COE Section 404 Permit, Erie and Cattaraugus Counties, NY,
Wait Period Ends: May 27, 2003, Contact: Robert E. Arnold (518) 431-
4127.
EIS No. 030177, Draft EIS, TVA, TN, 500 kV Transmission Line in Middle
Tennessee Project, Construct and Operation, Proposed Transmission Line
would Connect Cumberland Fossil Plant in Stewart County with either
Montgomery 500 kV Substation Montgomery County, or Davidson 500 kV
Substation Davidson County, Stewart, Houston, Montgomery, Dickerson,
Cheatham, TN, Comment Period Ends: June 10, 2003, Contact: Charles P.
Nicholson (865) 632-3582. This document is available on the Internet
at: http://www.tva.gov/environment/reports/index.htm.
EIS No. 030178, Draft EIS, FHW, WA, I-90 Two-Way Transit and HOV
Operation Project, To Provide Reliable Transportation between Seattle
and Bellevue, Sound Transit Regional Express, U.S. Coast Guard Permit
and U.S. Army Corps Nationwide Permit, King County, WA, Comment Period
Ends: June 9, 2003, Contact: James A. Leonard (360) 753-9408. This
document is available on the Internet at: http://www.soundtransit.org/
stplans/eastling/I_90.htm.
EIS No. 030179, Final EIS, FHW, KY, IN, Louisville-Southern Indiana
Ohio River Bridges Projects, To Improve Cross-River Mobility between
Jefferson County, KY and Clark County, ID, Coast Guard Bridge and U.S.
Army COE Section 10 and 404 Permits Issuance, Jefferson County, KY and
Clark County, IN, Comment Period Ends: June 25, 2003, Contact: John
Ballantyme (502) 223-6747.
EIS No. 030180, Draft EIS, NPS, CA, Whiskeytown Fire Management Plan,
Implementation, Whiskeytown National Recreation Area, Klamath
Mountains, Shasta County, CA, Comment Period Ends: June 24, 2003,
Contact: Paul DePrey (530) 242-3445. This document is available on the
Internet at: http://www.nps.gov/whis/exp/fireweb/firehomepage.htm.
EIS No. 030181, Draft EIS, AFS, AK, Greens Creek Tailings Disposal
Project, To Authorize Construction of Additional Dry Tailings Disposal
Storage, Admiralty National Monument, Tongass National Forest, AK,
Comment Period Ends: June 9, 2003, Contact: Pete Griffin (907) 586-
8800. This document is available on the Internet at:
http://www.greenscreekeis.com.
EIS No. 030182, Final Supplement, FHW, UT, U.S. Highway 189, Wildwood
to Heber Valley, between the junctions with Ut-92 and U.S. Highway 40,
Utah and Wasatch Counties, UT, Wait Period Ends: May 27, 2003, Contact:
Michael Morrow, P.E. (801) 963-0182.
Amended Notices
EIS No. 030080, Draft EIS, AFS, SC, Sumter National Forest Revised Land
and Resource Management Plan, Implementation, Oconee, Chester,
Fairfield, Laurens, Newberry, Union-Abbeville, Edgefield, Greenwood,
McCormick and Saluda Counties, SC, Comment Period Ends: June 21, 2003,
Contact: Jerome Thomas (803) 561-4000. Revision of FR Notice Published
on 3/14/2003: CEQ Comment Period Ending 6/21/2003 has been Extended to
7/3/2003.
EIS No. 030104, Draft EIS, AFS, TN, Cherokee National Forest Revised
Land and Resource Management Plan, Implementation, Carter, Cocke,
Greene, Johnson, McMinn, Monroe, Polk, Sullivan and Unicoil, TN,
Comment Period Ends: July 3, 2003, Contact: Terry McDonald (423) 476-
9700. Revision of FR Notice Published on 3/21/2003: CEQ Comment Period
Ending 6/16/2003 has been Extended to 7/3/2003.
EIS No. 030106, Draft EIS, AFS, VA, KY, WV, Jefferson National Forest
Revised Land and Resource Management Plan, Implementation, Mount Rogers
National Recreation Area, Clinch, Glenwood, New Castle, and New River
Valley Rangers Districts, VA, WV and KY, Comment Period Ends: July 3,
2003, Contact: Nancy Ross (540) 265-5172. Revision of FR Notice
Published on 3/21/2003: CEQ Comment Period Ending on 6/19/2003 has been
Extended to 7/3/2003.
EIS No. 030134, Draft EIS, COE, FL, Miami Harbor Navigation Improvement
Project, Provide Greater Navigation Safety and Accommodating Larger
Vessels, Port of Miami, Miami-Dade County, FL, Comment Period Ends: May
19, 2003, Contact: James McAdams (904) 232-2117. The above EIS was
inadvertently published in the 4/4/2003 FR. The Correct Notice of
Availability was published in the 3/14/2003 FR. The CEQ is
#030092. Comments are due back to the preparing agency on May 4, 2003.
EIS No. 030171, Draft EIS, AFS, UT, Prima East Clear Creek Federal No.
22-42 Gas Exploration Well, Application for Permit to Drill and
(Surface Use Plan of Operations) Castle Valley Ridge, Ferron/Price
Ranger District, Manti-La Sal National Forest, Carbon and Emery
Counties, UT, Comment Period Ends: June 9, 2003, Contact: Karl Boyer
(435) 637-2817.
Revision of FR Notice Published on 04/18/2003: CEQ Comment Period
Ending 06/02/2003 has been Reestablished to 06/09/2003. Due to
Incomplete Distribution of the DEIS at the time of Filing with USEPA
under Section 1506.9 of the CEQ Regulations.
Dated: April 22, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-10274 Filed 4-24-03; 8:45 am]
BILLING CODE 6560-50-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)