Environmental Impact Statements and Regulations; Availability of EPA Comments
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: August 15, 2003 (Volume 68, Number 158)]
[Notices]
[Page 48900-48901]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15au03-57]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6642-9]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under Section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 4, 2003 (68 FR 16511).
Draft EISs
ERP No. D-AFS-E65061-SC Rating EC2, Sumter National Forest Revised
Land and Resource Management Plan, Implementation, Oconee, Chester,
Fairfield, Laurens, Newberry, Union-Abbeville, Edgefield, Greenwood,
McCormick and Saluda Counties, SC.
Summary: EPA has environmental concerns related primarily to water
quality improvement goals and objectives for the National Forest. EPA
recommends inclusion of several forest-wide goals, objectives and
standards to improve water quality and identified several individual,
watershed-specific, management prescriptions for implementation.
ERP No. D-AFS-E65062-TN Rating EC2, Cherokee National Forest
Revised Land and Resource Management Plan, Implementation, Carter,
Cocke, Greene, Johnson, McMinn, Monroe, Polk, Sullivan and Unicoil, TN.
Summary: EPA has environmental concerns related primarily to water
quality improvement goals and objectives for the National Forest. EPA
recommends inclusion of several forest-wide goals, objectives and
standards to improve water quality and identified several individual,
watershed-specific, management prescriptions for implementation.
ERP No. D-AFS-E65063-GA Rating EC2, Chattahoochee-Oconee National
Forests Revised Land and Resource Management Plan, Implementation,
several Counties, GA.
Summary: EPA has environmental concerns related primarily to water
quality improvement goals and objectives for the National Forest. EPA
recommends inclusion of several forest-wide goals, objectives and
standards to improve water quality and identified several individual,
watershed-specific, management prescriptions for implementation.
ERP No. D-AFS-E65064-AL Rating EC2, Alabama National Forests
Revised Land and Resource Management Plan, Implementation, Bankhead
National Forest, Lawrence, Winston and Franklin Counties, AL.
Summary: EPA has environmental concerns related primarily to water
quality improvement goals and objectives for the National Forest. EPA
recommends inclusion of several forest-wide goals, objectives and
standards to improve water quality and identified several, watershed-
specific, management prescriptions for implementation.
ERP No. D-AFS-J65382-SD Rating EC2, Elk Bugs and Fuels Project,
Vegetation Management to Reduce the Spread of Mountain Pine Beetles and
the Threat and Severity of Potential Wildfires, Black Hills National
Forest Land and Resource Management Plan, Implementation, Northern
Hills Ranger District, Black Hills National Forest, Lawrence and Meade
Counties, SD.
Summary: EPA expressed environmental concerns about adverse impacts
of erosion on water quality and riparian habitat, sedimentation of
streams and water-storage reservoirs, fish and wildlife impacts to
sensitive species; and noxious weeds. EPA recommended focusing fire
reducing treatments to wildland-private land interface, allowing large,
fire-resistant trees to remain for wildlife habitat in the back
country, and maximizing use of existing roads and reducing new roads
near private lands.
ERP No. D-BLM-J01080-WY Rating EC2, West Hay Creek Coal Lease
Application, Federal Coal Leasing, Buckskin Mine, Powder River Basin,
Campbell County, WY.
Summary: EPA expressed environmental concerns with potential
impacts to air quality in the Powder River Basin, nitrogen oxides from
blasting and wetlands loss.
ERP No. D-DOD-A09832-00 Rating LO, Mercury Management Project, Site
Selection and Implementation of a Long-Term (i.e., 40 Years) Management
Plan for the Defense Stockpile of Elemental Mercury, Hawthore, NV; New
Haven, IN; Oak Ridge, TN; Romulus, NY; Somerville, NJ; Tooele, UT and
Warren, OH.
Summary: EPA had no objection to the proposed action.
ERP No. D-DOD-A10075-00 Rating LO, Programmatic EIS--Chemical and
Biological Defense Program, Protection of our Soldiers, Sailors,
Marines and Airmen on the Battlefield, United States and other
Countries.
Summary: EPA had no objection to the proposed action.
ERP No. D-DOE-C22003-NY Rating LO, West Valley Demonstration
Project, Waste Management, Onsite Management and Offsite Transportation
of Radioactive Waste, West Valley, Cattaraugus County, NY.
Summary: EPA has no objections to the implementation of the
proposed project.
ERP No. D-DOE-L91018-OR Rating LO, Northeast Oregon Hatchery
Program, Grande Ronde--Imnaha Spring Chinook Hatchery Modification
[[Page 48901]]
and Modernization of Two Existing Hatchery Facilities and Construction
of Three New Auxiliary Hatchery Facilities, Wallowa County, OR.
Summary: EPA requested additional information in the final EIS to
support the need for the hatchery facilities. EPA also requested
clarification on: cumulative impacts collection, maintenance and
operation criteria; future facility plans and consultation with Native
American Tribes.
ERP No. D-FHW-F40412-OH Rating EC1, OH-161/37 Improvement, from OH-
161 (New Albany Bypass) to west of OH-161/37 Interchange with OH-16,
Funding, Franklin and Licking Counties, OH.
Summary: EPA has environmental concerns with the preferred
alternative, specifically with impacts to wetlands, floodplains/
streams, and groundwater resources. EPA recommends that the FEIS
include specific mitigation measures to minimize these impacts.
ERP No. D-FTA-E54012-FL Rating EC1, MIC/Earlington Heights
Connector Study, Earlington Heights Metrorail Station to the Miami-Dade
Intermodal Center (MIC) Transit Improvements, Funding and NPDES, U.S.
Army COE Section 10 and U.S. Coast Guard Bridge Permits Issuance,
Miami-Dade County, FL.
Summary: EPA has environmental concerns with the proposed project
regarding potential impacts to floodplains, aquatic resources, and
wildlife and aquatic habitat as well as concerns regarding visual and
noise impacts.
ERP No. D-NRC-E05101-SC Rating EC1, H.B. Robinson Steam Electric
Plant, Unit No. 2 (RNP), Application for Operating License Renewal of
Nuclear Plants for 20-Years, Supplement 13, located on the Shore of
Lake Robinson, Darlington and Chesterfield Counties, SC.
Summary: EPA notes that radiological monitoring of all plant
effluents, and appropriate storage and disposition of radioactive
waste, will be necessary during the license renewal period.
ERP No. D-USA-C11021-NY Rating LO, Thomas Jefferson Hall and Other
Construction Activities in the Cadet Zone of the United States Military
Academy, Implementation, West Point, Hudson River Valley, Orange and
Putnam Counties, NY.
Summary: EPA has no objections to the implementation of the
proposed project.
ERP No. DC-NOA-B91017-00 Rating LO, Atlantic Sea Scallop Fishery
Management Plan (FMP), Amendment 10, Introduction of Spatial Management
of Adult Scallops, Essential Fish Habitat (EFH), from the Gulf of Maine
and Georges Banks to Cape Hatteras, NC.
Summary: While EPA has no objection to the proposed action, it was
suggested that public comments and additional data on protected species
be included in the final document.
ERP No. DS-DOE-A06178-00 Rating LO, Programmatic EIS--Stockpile and
Management for a Modern Pit Facility (MPF) Construction and Operation,
Site Location: Savannah River Site, SC; Los Alamos Site, NM; Nevada
Test Site; Carlsbad Site, NM; and Pantex Site, TX, and Plutonium Pit
Manufacturing Capabilities Upgrading at Los Alamos National Laboratory
(LANL), NM.
Summary: EPA does not object to the proposed action, but requests
that the final EIS address several technical comments.
Final EISs
ERP No. F-AFS-H65014-MO, Pineknot Woodland Restoration Project,
Open Shortleaf Pine Woodland Restoration, Implementation, Doniphan/
Eleven Point Ranger District, Mark Twain National Forest, Carter
County, MO.
Summary: EPA's concerns regarding old growth designations, water
quality and soil protection, and a smoke/fire management plan have been
adequately addressed.
ERP No. F-COE-G39034-TX, Bayport Channel Container/Cruise Terminal
Project, Marine Terminal Complex Construction and Operation, Bayport
Ship Channel, U.S. Army COE Section 10 and 404 Permits Issuance, Harris
County, TX.
Summary: EPA expressed environmental concern that impacts to
wetlands should be fully mitigated and that a mitigation plan be
incorporated in the Record of Decision and be made a condition to the
Section 10/404 Corps of Engineers permit.
ERP No. F-FHW-E50293-00, Louisville-Southern Indiana Ohio River
Bridges Project, Cross-River Mobility Improvement between Jefferson
County, KY and Clark County, ID, Coast Guard Bridge and U.S. Army COE
Section 10 and 404 Permits Issuance, Jefferson County, KY and Clark
County, IN.
Summary: EPA has environmental concerns with the proposed project
regarding traffic noise, environmental justice issues, surface water
quality, upland forest losses, and loss of agricultural lands. Air
quality conformity is a particular area of concern. EPA recommends that
all reasonable and feasible mitigation measures be identified in the
Record of Decision.
ERP No. F-FRC-J03015-00, Grasslands Pipeline Project, Interstate
Natural Gas Pipeline System Construction and Operation, Docket No.
CP02-037-000, WY, ND and MT.
Summary: FERC and the project proponent made some revisions in
response to EPA's comments, to reduce wetland and aquatic impacts. The
project proponent agreed to directionally drill its Sandstone Creek
crossing, to eliminate water quality impacts to that sensitive,
perennial stream. EPA requested that a plan be developed to prevent and
monitor noxious weed introduction and spread before project
construction begins. EPA expressed concerns that cumulative
environmental impacts from related gas production projects were not
addressed in the EIS.
ERP No. F-NOA-E91010-00, Amendment 13 to the Fishery Management
Plan for Summer Flounder, Scup, and Black Sea Bass, Implementation, in
the Western Atlantic Ocean, from Cape Harteras, NC, northward to the
US-Canadian Border.
Summary: While EPA has no objection to the proposed action, EPA did
request some clarification information regarding wet storage of fishing
pots/traps and the tag program.
ERP No. FS-COE-E67003-FL, PCS Phosphate--White Springs Mine
Continuation Mining Operations, Proposal to Discharge Dredged/ Fill
Material into 1,858 Acres of Jurisdictional Wetlands, Applications of
``Life of Mine'' Permits, Hamilton County, FL.
Summary: EPA noted that although most of its requests for technical
data were provided, there were some environmental concerns that some
data was not readily available in the Final EIS and had to be obtained
from a project Web site.
Dated: August 12, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-20901 Filed 8-14-03; 8:45 am]
BILLING CODE 6560-50-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)