Saltville Gas Storage Company L.L.C.; Notice of Intent To Prepare an Environmental Assessment for the Proposed Saltville Storage Project and Request for Comments on Environmental Issues
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: December 24, 2003 (Volume 68, Number 247)]
[Notices]
[Page 74572-74574]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr24de03-75]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP04-13-000]
Saltville Gas Storage Company L.L.C.; Notice of Intent To Prepare
an Environmental Assessment for the Proposed Saltville Storage Project
and Request for Comments on Environmental Issues
December 16, 2003.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Saltville Storage Project
involving the construction of a limited number of new facilities and
operation of existing facilities by Saltville Gas Storage Company
L.L.C. (Saltville) in Smyth and Washington Counties, Virginia.\1\
Saltville is currently developing a new 8.2 billion cubic feet (Bcf),
underground natural gas storage facility using depleted salt caverns
that was previously authorized for construction and operation by the
Virginia State Corporation Commission. Saltville has received all
necessary state regulatory approvals to construct and operate its
storage facility. See Appendix 1 for a list of the facilities and their
construction status. The EA will focus its analysis on the facilities
that still need to be constructed, and on restoration of the areas
previously disturbed or currently being disturbed by on-going
construction activities. This EA will be used by the Commission in its
decision-making process to determine whether the project is in the
public convenience and necessity.
---------------------------------------------------------------------------
\1\ Saltville's application was filed with the Commission under
section 7(c) of the Natural Gas Act and part 157 of the Commission's
regulations. The Commission determined that the project should be
subject to Federal regulation. Therefore, Saltville has filed for
approval to complete construction of the project and to operate it
pursuant to Federal regulatory requirements.
---------------------------------------------------------------------------
The Saltville Storage Project is located entirely on land that is
either already owned by Saltville or over which it already holds all
necessary rights-of-
[[Page 74573]]
way. Saltville does not require additional property rights from
landowners in the vicinity of the project. The 6.7-mile-long, 24-inch-
diameter natural gas pipeline has already been constructed and is in
service. All of the facilities that remain to be constructed by
Saltville would be located within its 650-acre property. Saltville
commenced limited customer service on August 1, 2003.
Summary of the Project
Saltville wants to develop and operate up to four salt storage
caverns with a total capacity of 8.2 Bcf. Caverns 1 and 2 have been
completed and are in service. Well conversion work remains to be
completed on well 23 in Cavern 3 and this conversion work is in
progress. Saltville has also substantially completed all of the
pipelines and other facilities necessary to operate this storage field
with the exception of the following facilities that will be examined in
the EA:
? Construction of a second 5,250 horsepower electric-motor
driven reciprocating compressor and associated dehydrators and heaters
at the existing compressor station;
? Development of Cavern 4 (recomplete Well 24) that would
have a capacity of about 0.2 Bcf and associated gas and brine piping
(about 500 and 200 feet, respectively) and controls;
? Installation of Cavern 3's de minimus associated gas and
brine piping connections between the already installed gas and brine
mainlines that are currently in-place adjacent to Wells 18, 19, 21, 22,
and 23 and controls; and
? A new office building.
All of these facilities are within Saltville's property. No
nonjurisdictional facilities are needed. The EA would also address any
facility removal activities.
The location of the project facilities is shown in appendix 2.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices, other
than appendix 1 (maps), are available on the Commission's website at
the ``eLibrary'' link or from the Commission's Public Reference and
Files Maintenance Branch, 888 First Street, NE., Washington, DC
20426, or call (202) 502-8371. For instructions on connecting to
``eLibrary'' refer to the last page of this notice. Copies of the
appendices were sent to all those receiving this notice in the mail.
---------------------------------------------------------------------------
Land Requirements for the Project
No new land is required. All of the facilities that remain to be
constructed would be located in previously disturbed areas that are
within Saltville's 650-acre property. These areas are mostly covered
with gravel or broken native rock at this time.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from its action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\3\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping''. The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice of intent, the Commission requests
public comments on the scope of the issues it will address in the EA.
All comments received are considered during the preparation of the EA.
State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
---------------------------------------------------------------------------
\3\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
? Geology and soils
? Land use
? Water resources, fisheries, and wetlands
? Cultural resources
? Vegetation and wildlife
? Air quality and noise
? Public safety
? Endangered and threatened species
We will also evaluate possible alternatives to the proposed
project, and make recommendations on how to lessen or avoid impacts on
the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission(s official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section below.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Saltville and stakeholders.
This preliminary list of issues may be changed based on your comments
and our analysis.
? Noise from compressor station operations.
? Public safety.
? Saltville fault.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, and measures to avoid or lessen environmental impact. The
more specific your comments, the more useful they will be. Please
carefully follow these instructions to ensure that your comments are
received in time and properly recorded:
? Send an original and two copies of your letter to: Magalie
R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First
St., NE., Room 1A, Washington, DC 20426.
? Label one copy of the comments for the attention of Gas
Branch 2.
? Reference Docket No. CP04-13-000.
? Mail your comments so that they will be received in
Washington, DC on or before January 14, 2004.
Please note that we are continuing to experience delays in mail
deliveries from the U.S. Postal Service. As a result, we will include
all comments that we receive within a reasonable time frame in our
environmental analysis of this project. However, the Commission
strongly encourages electronic filing of any comments or interventions
or protests to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site at http://www.ferc.gov
under the ``e-Filing'' link and the link to the User's Guide. Before you
can file comments you will need to create a free account which can be
created on-line.
We may mail the EA for comment. If you are interested in receiving
it, please return the Information Request (appendix 4). If you do not
return the Information Request, you will be taken off the mailing list.
[[Page 74574]]
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding known as an
``intervenor''. Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must provide 14 copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding. If
you want to become an intervenor you must file a motion to intervene
according to Rule 214 of the Commission(s rules of practice and
procedure (18 CFR 385.214) (see Appendix 3).\4\ Only intervenors have
the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------
\4\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (http://www.ferc.gov)
using the
eLibrary link. Click on the eLibrary link, click on ``General Search''
and enter the docket number excluding the last three digits in the Docket
Number field. Be sure you have selected an appropriate date range. For
assistance with ``eLibrary'', the eLibrary helpline can be reached at
1-866-208-3676, TTY (202) 502-8659, or at ferconlinesupport@ferc.gov.
The eLibrary link on the FERC Internet Web site also provides access to
the texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to http://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at http://www.ferc.gov/EventCalendar/
EventsList.aspx
along with other related information.
Magalie R. Salas,
Secretary.
[FR Doc. E3-00630 Filed 12-23-03; 8:45 am]
BILLING CODE 6717-01-P