Duke Energy Corporation; Notice of Availability of Draft Environmental Assessment
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: January 24, 2003 (Volume 68, Number 16)]
[Notices]
[Page 3523-3524]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr24ja03-64]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2232-428--North Carolina and South Carolina]
Duke Energy Corporation; Notice of Availability of Draft
Environmental Assessment
January 17, 2003.
In accordance with the National Environmental Policy Act of 1969,
as amended, and the Federal Energy Regulatory Commission's (Commission)
regulations (18 CFR part 380), Commission staff have reviewed a
proposed Revised Shoreline Management Plan (SMP) for the Catawba-
Wateree Project (FERC No. 2232), and have prepared a draft
Environmental Assessment on the proposed plan. The project is located
on the Catawba River in North Carolina and South Carolina.
Specifically, the project licensee (Duke Energy Corporation) has
requested Commission approval of the SMP. The proposed SMP is intended
to supercede the approved SMP including the classification maps. The
draft EA addresses proposed revisions to SMP for the Catawba-Wateree
Project. The SMP and maps address the allowable uses of 1,727 miles of
shoreline for the 11 project reservoirs located in North Carolina and
South Carolina. In the draft EA, Commission staff have analyzed the
probable environmental effects of implementing the proposed SMP and
have concluded that approval of the proposed SMP, with appropriate
environmental measures, would not constitute a major Federal action
significantly affecting the quality of the human environment.
Copies of the draft EA are available for review in Public Reference
Room 2-A of the Commission's offices at 888 First Street, NE.,
Washington, DC. The draft EA also may be viewed on the Commission's
Internet Web site (http://www.ferc.gov)
using the ``FERRIS''
link. Additional information about the project is available from the
Commission's Office of External Affairs, at (202) 502-6088 or on the
Commission's Web site using the FERRIS link. Click on the FERRIS link,
enter the docket number excluding the last three digits in the Docket
Number field. Be sure you have selected an appropriate date range. For
assistance with FERRIS, contact FERCOnlineSupport@ferc.gov or call
toll-free at (866) 208-3676, or for TTY contact (202) 502-8659. The
FERRIS link on the FERC's Internet Web site also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Any comments on the draft EA should be filed within 30 days of the
date of this notice and should be addressed to Magalie R. Salas,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. Please reference ``Catawba-Wateree Hydroelectric
Project, FERC Project No. 2232-428'' on all comments. Comments may be
filed electronically via the
[[Page 3524]]
Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under the ``e-Filing'' link.
Magalie R. Salas,
Secretary.
[FR Doc. 03-1617 Filed 1-23-03; 8:45 am]
BILLING CODE 6717-01-P
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)