Environmental Impact Statements and Regulations; Availability of EPA Comments
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: July 18, 2003 (Volume 68, Number 138)]
[Notices]
[Page 42705-42706]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18jy03-96]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6642-2]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 4, 2003 (68 FR
16511).
Draft EISs
ERP No. D-AFS-K65249-CA Rating EC2, Stream Fire Restoration
Project, Implementation, Plumas National Forest, Mt. Hough Ranger
District, Plumas County, CA.
Summary: EPA expressed environmental concern that the output
guidelines developed for Alternative C may be inconsistent with the
overall management strategy embodied in the Sierra Nevada Forest Plan
Amendment. EPA also expressed concern that the Forest Service has not
identified road decommissioning opportunities as part of Alternatives B
and C.
ERP No. D-AFS-L65423-ID Rating NS, Big Bend Ridge Vegetation
Management Project and Timber Sale, Provision of Forest Products on a
Sustained Yield Basis, Caribou-Targhee National Forest, Ashton/Island
Park Ranger District, Fremont County, ID.
Summary: EPA Region 10 used a screening tool to conduct a limited
review of this action. Based upon this screen, EPA does not foresee
having any environmental objections to the proposed action. Therefore,
EPA will not be conducting a detailed review.
ERP No. D-FHW-G40173-TX Rating EC2, Grand Parkway/TX-99 Improvement
Project, I-10 to US 290, Funding, Right-of-Way Grant and U.S. Army COE
Section 404 Permit Issuance, Harris County, TX.
Summary: EPA has environmental concerns with the DEIS and proposed
action, specifically relating to air quality impacts and conformity
issues. EPA is also concerned with jurisdictional wetland delineations
and mitigation, particularly the applicants interpretation of Galveston
District Corps of Engineers policy as well as recent SWANC decisions.
Final EISs
ERP No. F-AFS-J65338-UT Uinta National Forest Revised Land and
Resource Management Plan, Implementation, Juab, Sanpete, Tooele, Utah
and Wasatch Counties, UT.
Summary: No formal comment letter was sent to the preparing agency.
ERP No. F-AFS-L39057-OR Rimrock Ecosystem Restoration Project,
Promotion of Healthy and Sustainable Watershed Conditions,
Implementation, Umatilla National Forest, Heppner Ranger District,
Grant, Morrow and Wheeler Counties, OR.
Summary: No formal comment letter was sent to the preparing agency.
ERP No. F-DOE-L09815-00 Fish and Wildlife Implementation Plan,
Policy Directions for Fish and Wildlife Mitigation and Recovery,
Implementation and Funding, Pacific Northwest, AZ, CA, ID, MT, NV, NM,
OR, UT, WY and British Columbia.
Summary: No formal comment letter was sent to the preparing agency.
ERP No. F-NRC-E05099-FL Generic EIS--License Renewal of Nuclear
Plants for the St. Lucie Units 1 and 2, Supplement 11, NUREG-1437,
[[Page 42706]]
Implementation, Hutchinson Island, St. Lucie County, FL.
Summary: EPA has environmental concerns about some aspects of the
project, but notes that the EIS indicates that the plant will continue
radiological monitoring of effluents and the appropriate storage and
disposition of radioactive waste during the license renewal period.
ERP No. F-USN-K52004-CA Advanced Amphibious Assault Vehicle (AAAV)
Development, Replacement and Establishment, Implementation, Del Mar
Basin Area of Marine Corps Base (MCB) Camp Pendelton, San Diego County,
CA
Summary: No formal comment letter was sent to the preparing agency.
Dated: July 15, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-18290 Filed 7-17-03; 8:45 am]
BILLING CODE 6560-50-M
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)