Environmental Impact Statement: Los Angeles County, CA
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: June 5, 2003 (Volume 68, Number 108)]
[Notices]
[Page 33757]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr05jn03-127]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Environmental Impact Statement: Los Angeles County, CA
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: The FHWA is issuing this notice to advise the public that an
environmental impact statement (EIS) will be prepared for the proposed
1st Street Bridge Widening and Road Realignment project in the city and
county of Los Angeles, California in accordance with the National
Environmental Policy Act of 1969 (NEPA).
FOR FURTHER INFORMATION CONTACT: Cesar Perez, Senior Transportation
Engineer, Federal Highway Administration, 980 Ninth St., Suite 400,
Sacramento, CA, Telephone: (916) 498-5860.
SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with Caltrans, will
prepare an EIS on a proposal to widen the 1st Street Bridge and realign
1st Street in the city and county of Los Angeles, California. The
proposed improvements would involve construction over the Los Angeles
River between Vignes Street and Clarence Street for a distance of
approximately 1.25 miles (1.6 kilometers).
The study will determine the type of facility required to meet the
transportation needs of this traffic corridor. Existing and proposed
industrial, commercial and residential development along the 1st Street
corridor is expected to induce traffic demand in excess of the capacity
of the existing east-west transportation corridor. The proposed EIS
will discuss the sufficiency rating of the bridge in terms of its
functional serviceability and the realignment 1st Street to accommodate
construction of the Metropolitan Transportation Authority (MTA) Los
Angeles Eastside Corridor Light Rail Transit (LRT) line in the median,
while maintaining the existing four traffic lanes and adding shoulders
on the bridge. Also included in the proposal is the realignment and
lowering of local streets at Santa Fe Avenue and Myers Street meet
vertical and horizontal clearance requirements. Alternatives under
consideration include (1) no-build; (20 widen bridge on the north side;
and (3) construct a separate structure on the north side of existing
bridge.
The public information program and project development team
meetings will continue throughout the design and environmental process.
There will be ongoing project development team meetings that involve
concerned parties such as the city of Los Angeles and the Metropolitan
Transportation Agency (MTA). The draft EIS will be available for public
and agency review and comment. A public hearing will be held to discuss
alternatives and impacts of the proposed action. Public notice will
given for the time and place of the public hearing. To ensure that the
full range of issues related to this proposed action are addressed and
all significant concerns are identified, comments and are invited from
all interested parties. Comments or questions about this proposed
action and the EIS should be directed to FHWA at the address indicated
herein.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Planning and construction. The regulations implementing
Executive Order 12372 regarding intergovernmental consultation on
Federal programs and activities apply to this program.)
Issued: May 30, 2003.
Cesar E. Perez,
Senior Transportation Engineer.
[FR Doc. 03-14137 Filed 6-4-03; 8:45 am]
BILLING CODE 4910-22-M
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)