Proposed Rates for Pick-Sloan Missouri Basin Program-Eastern Division
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: June 13, 2003 (Volume 68, Number 114)]
[Notices]
[Page 35402-35404]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr13jn03-72]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Western Area Power Administration
Proposed Rates for Pick-Sloan Missouri Basin Program-Eastern Division
AGENCY: Western Area Power Administration, DOE.
ACTION: Notice of proposed rates.
-----------------------------------------------------------------------
SUMMARY: The Western Area Power Administration (Western) is proposing
revised rates for Pick-Sloan Missouri
[[Page 35403]]
Basin Program-Eastern Division (P-SMBP-ED) firm electric and firm
peaking power service. Current rates, under Rate Schedules P-SED-F6 and
P-SED-FP6, have been extended through March 31, 2004. The proposed
rates will provide sufficient revenue to pay all annual costs,
including interest expense, and repayment of required investment within
the allowable period. The rate impacts will be detailed in a brochure
to be made available to all interested parties. The proposed rates,
under Rate Schedules P-SED-F7 and P-SED-FP7, are scheduled to go into
effect on January 1, 2004, and will remain in effect through December
31, 2008. Publication of this Federal Register notice begins the formal
process for the proposed rates.
DATES: The consultation and comment period begins today and will end
September 11, 2003. Western will present a detailed explanation of the
proposed rates at public information forums. The public information
forum dates are:
1. July 14, 2003, 1 p.m. to 4 p.m. MDT, Denver, CO.
2. July 15, 2003, 9 a.m. to 12 noon CDT, Lincoln, NE.
3. July 16, 2003, 9 a.m. to 12 noon CDT, Sioux Falls, SD.
4. July 17, 2003, 9 a.m. to 12 noon CDT, Fargo, ND.
Western will receive oral and written comments at public comment
forums. The public comment forums will be held on the following dates:
1. August 6, 2003, 1 p.m. to 4 p.m. MDT, Denver, CO.
2. August 7, 2003, 9 a.m. to 12 noon CDT, Sioux Falls, SD.
Western will receive written comments anytime during the
consultation and comment period.
ADDRESSES: Written comments should be sent to Robert J. Harris,
Regional Manager, Upper Great Plains Region, Western Area Power
Administration, 2900 4th Avenue North, Billings, MT 59101-1266, email:
ugp2004rateadj@wapa.gov. Information pertaining to the rate process
will be posted on our Web site at http://www.wapa.gov/ugp/rates/
2004RateAdj/Default.html. Official comments received via letter and e-
mail, will be posted to our Web site after the close of the comment
period. Western must receive written comments by the end of the
consultation and comment period to be assured consideration.
The public information forum locations are:
1. Denver--Radisson Stapleton Plaza, 3333 Quebec Street, Denver,
CO.
2. Lincoln--Southeast Community College (1st Floor of the Energy
Plaza), 11th and O Street, Lincoln, NE.
3. Sioux Falls--Ramkota Hotel and Conference Center, 2400 North
Louise Avenue, Sioux Falls, SD.
4. Fargo--Doublewood Inn, 3333 13th Avenue South, Fargo, ND.
The public comment forum locations are:
1. Denver--Radisson Stapleton Plaza, 3333 Quebec Street, Denver,
CO.
2. Sioux Falls--Ramkota Hotel and Conference Center, 2400 North
Louise Avenue, Sioux Falls, SD.
FOR FURTHER INFORMATION CONTACT: Mr. Robert F. Riehl, Power Marketing
Manager, Upper Great Plains Region, Western Area Power Administration,
2900 4th Avenue North, Billings, MT 59101-1266, telephone (406) 247-
7394, email: riehl@wapa.gov.
SUPPLEMENTARY INFORMATION: The proposed rates for P-SMBP-ED firm
electric and firm peaking service are designed to recover an annual
revenue requirement that includes investment repayment, interest,
purchase power, operation and maintenance expense, and other expenses.
The projected annual revenue requirement for firm electric service is
allocated equally between capacity and energy.
The Department of Energy (DOE) Deputy Secretary approved Rate
Schedules P-SED-F6 and P-SED-FP6 for P-SMBP-ED firm electric and firm
peaking service on January 6, 1994 (Rate Order No. WAPA-60, 59 FR 3348,
January 21, 1994), and the Federal Energy Regulatory Commission (FERC)
confirmed and approved the rate schedules on July 14, 1994, under FERC
Docket No. EF94-5031-000 (68 FERC 62,040). Rate Schedules P-SED-F6 and
P-FED-FP6 were approved for a 5-year period beginning on February 1,
1994, ending on January 31, 1999. Rate Order No. WAPA-83 extended the
rate for 2 years, beginning February 1, 1999, through January 31, 2001.
Rate Order No. WAPA-90 extended the rate again beginning February 1,
2001, through September 30, 2003. Rate Order No. WAPA-102 extended the
rate a third time beginning October 1, 2003, through March 31, 2004.
Under Rate Schedule P-SED-F6 , the second step of the composite
rate effective on October 1, 1994, is 14.23 mills per kilowatthour
(mills/kWh), the energy rate is 8.32 mills/kWh and the capacity rate is
$3.20 per kilowattmonth (kW month). Under Rate Schedule P-SED-F7, the
proposed rates for P-SMBP-ED firm electric service will result in an
overall composite rate increase of approximately 15.4 percent and the
firm peaking rate will increase approximately 15.6 percent effective on
January 1, 2004. The proposed rates for P-SMBP-ED firm electric and
firm peaking service are listed in Table 1.
Table 1.--Proposed Firm Electric Service Revenue Requirement and Rates
----------------------------------------------------------------------------------------------------------------
Percent
Firm electric service Existing rates Proposed rates Jan. 1, 2004 change
----------------------------------------------------------------------------------------------------------------
P-SMBP-ED Revenue Requirement............ $135.2 million.............. $159.2 million.............. 17.8
P-SMBP-ED Composite Rate................. 14.23 mills/kWh............. 16.42 mills/kWh............. 15.4
Firm Capacity............................ $3.20/kW month.............. $3.70/kW month.............. 15.6
Firm Energy.............................. 8.32 mills/kWh.............. 9.57 mills/kWh.............. 15.0
Tiered £ 60 Percent Load Factor 3.38 mills/kWh.............. 7.23 mills/kWh.............. 113.9
Firm Peaking Capacity.................... $3.20/kW month.............. $3.70/kW month.............. 15.6
Firm Peaking Energy\1\................... 8.32 mills/kWh.............. 9.57 mills/kWh.............. 15.0
----------------------------------------------------------------------------------------------------------------
\1\ Firm Peaking Energy is normally returned. This rate will be assessed in the event Firm Peaking Energy is not
returned.
Although a one-step rate adjustment is the option being proposed,
Western is interested in receiving comments on a two-step rate
adjustment option. Under a two-step adjustment, the rates for P-SMBP-ED
firm electric service will result in an overall composite rate increase
of approximately 12.3 percent effective on January 1, 2004, and another
3.3 percent effective on October 1, 2004, for a total increase of
approximately 15.6 percent. The rates under this option for P-SMBP-ED
firm electric service are listed in Table 2.
[[Page 35404]]
Table 2.--Two-Step Option--Firm Electric Service Revenue Requirement and Rates
----------------------------------------------------------------------------------------------------------------
First step rates Percent Second step rates Percent
Firm electric service Existing rates Jan. 1, 2004 change Oct. 1, 2004 change
----------------------------------------------------------------------------------------------------------------
P-SMBP-ED Revenue Requirement.. $135.2 million.... $154.9 million.... 14.6 $159.5 million... 3.4
P-SMBP-ED Composite Rate....... 14.23 mills/kWh... 15.98 mills/kWh... 12.3 16.45 mills/kWh.. 3.3
Firm Capacity.................. $3.20/kW month.... $3.60/kW month.... 12.5 $3.71/kW month... 3.4
Firm Energy.................... 8.32 mills/kWh.... 9.31 mills/kWh.... 11.9 9.58 mills/kWh... 3.3
Tiered £ 60 Percent 3.38 mills/kWh.... 7.23 mills/kWh.... 113.9 7.23 mills/kWh... 0.0
Load Factor.
Firm Peaking Capacity.......... $3.20/kW month.... $3.60/kW month.... 12.5 $3.71/kW monrh... 3.4
Firm Peaking Energy\1\......... 8.32 mills/kWh.... 9.31 mills/kWh.... 11.9 9.58 mills/kWh... 3.3
----------------------------------------------------------------------------------------------------------------
\1\ Firm Peaking Energy is normally returned. This rate will be assessed in the event Firm Peaking Energy is not
returned.
Since the proposed rates constitute a major adjustment as defined
by the procedures for public participation in general rate adjustments,
as cited below, Western will hold both a public information forum and a
public comment forum. After review of public comments, and possible
amendments or adjustments, Western will recommend the proposed rates
for approval on an interim basis by the DOE Deputy Secretary.
These firm electric service rates for P-SMBP-ED are being
established pursuant to the Department of Energy Organization Act, 42
U.S.C. 7101-7352; the Reclamation Act of 1902, ch. 1093, 32 Stat. 388,
as amended and supplemented by subsequent enactments, particularly
section 9(c) of the Reclamation Project Act of 1939, 43 U.S.C. 485h(c);
and other acts specifically applicable to the projects involved.
By Delegation Order No. 00-037.00, approved December 6, 2001, the
DOE Secretary of Energy delegated: (1) The authority to develop power
and transmission rates on a nonexclusive basis to Western's
Administrator; (2) the authority to confirm, approve, and place such
rates into effect on an interim basis to the Deputy Secretary; and (3)
the authority to confirm, approve, and place into effect on a final
basis, to remand, or to disapprove such rates to FERC. Existing DOE
procedures for public participation in power rate adjustments (10 CFR
part 903) became effective on September 18, 1985 (50 FR 37835).
Availability of Information
All brochures, studies, comments, letters, memorandums, or other
documents made or kept by Western in developing the proposed rates are
available for inspection and copying at the Upper Great Plains Regional
Office, located at 2900 4th Avenue North, Billings, Montana. Many of
these documents and supporting information are also available on our
Web site under the ``2004 Rate Adjustment'' section located at
http://www.wapa.gov/ugp/rates/2004RateAdj/Default.htm.
Regulatory Procedure Requirements
Regulatory Flexibility Analysis
The Regulatory Flexibility Act of 1980 (5 U.S.C. 601, et seq.)
requires Federal agencies to perform a regulatory flexibility analysis
if a final rule is likely to have a significant economic impact on a
substantial number of small entities and there is a legal requirement
to issue a general notice of proposed rulemaking. This action does not
require a regulatory flexibility analysis since it is a rulemaking
involving rates or services applicable to public property.
Environmental Compliance
In compliance with the National Environmental Policy Act of 1969
(NEPA) (42 U.S.C. 4321, et seq.); Council on Environmental Quality
Regulations (40 CFR parts 1500-1508); and DOE NEPA Regulations (10 CFR
part 1021), Western has determined that this action is categorically
excluded from preparing an environmental assessment or an environmental
impact statement.
Determination Under Executive Order 12866
Western has an exemption from centralized regulatory review under
Executive Order 12866; so this notice requires no clearance by the
Office of Management and Budget.
Small Business Regulatory Enforcement Fairness Act
Western has determined that this rule is exempt from congressional
notification requirements under 5 U.S.C. 801 because the action is a
rulemaking of particular applicability relating to rates or services
and involves matters of procedure.
Dated: May 30, 2003.
Michael S. Hacskaylo,
Administrator.
[FR Doc. 03-14949 Filed 6-12-03; 8:45 am]