Notice of Paper Scoping and Soliciting Scoping Comments
Note: EPA no longer updates this information, but it may be useful as a reference or resource.
[Federal Register: March 13, 2003 (Volume 68, Number 49)]
[Notices]
[Page 12066-12067]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr13mr03-77]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Paper Scoping and Soliciting Scoping Comments
March 6, 2003.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: New Minor License.
b. Project No.: 1273-009.
c. Date filed: November 15, 2002.
d. Applicant: Parowan City.
e. Name of Project: Center Creek Hydroelectric Project.
f. Location: At the confluence of Center Creek (aka Parowan Creek)
and Bowery Creek (a tributary to Parowan Creek) near the City of
Parowan, in Iron County, Utah. The project occupies 21.43 acres of land
managed by the U.S. Department of the Interior, Bureau of Land
Management.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Alden C. Robinson, P.E., Sunrise Engineering,
Inc., 25 East 500 North, Fillmore, Utah 84631, (435) 743-6151 and/or
Clark Gates II, City Manager, Parowan City, PO Box 576, Parowan, Utah
84761, (435) 477-3331.
i. FERC Contact: Gaylord Hoisington, (202) 502-6032,
gaylord.hoisington@ferc.gov.
j. Deadline for filing scoping comments is April 4, 2003. All
documents (original and eight copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
Scoping comments may be filed electronically via the Internet in
lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on
the Commission's web site, http://www.ferc.gov,
under the
``e-Filing'' link.
k. This application is not ready for environmental analysis at this
time.
l. Description of the Project: (1) a 15-foot-high, 54-foot-long
concrete overflow type diversion dam; (2) a radial gate; (3) trash
racks; (4) a 19.9 acre-foot de-silting pond; (5) an 18 to 26-inch-
diameter, 19,300-foot-long steel penstock; (5) a 600-kilowatt
powerhouse; and (6) appurtenant facilities.
m. A copy of the application is on file with the Commission and is
available for public inspection. This filing is available for review at
the Commission or may be viewed on the Commission's Web site at http://
www.ferc.gov,
using the ``FERRIS'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY,
contact (202) 502-8659. A copy is also available for inspection and
reproduction at the address in item h above.
n. Scoping Process--Scoping is intended to advise all parties
regarding the proposed scope of the environmental analysis and to seek
additional information pertinent to this analysis. The Commission
intends to prepare an environmental assessment (EA) for the project in
accordance with the National Environmental Policy Act. The EA will
consider both site-specific and cumulative environmental impacts and
reasonable alternatives to the proposed action.
At this time, the Commission staff do not propose to conduct any
formal public or agency meetings or an on-site visit. Instead, we will
solicit comments, recommendations, information, and alternatives by
conducting paper scoping through issuing Scoping Document 1 (SD1).
Copies of SD1 outlining the subject areas to be addressed in the EA
were distributed to the parties on the Commission's mailing list.
Copies of SD1 are available for review at the Commission or may be
viewed on the Commission's Web site at http://www.ferc.gov,
using the ``FERRIS'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at (866) 208-3676, or for TTY, contact (202) 502-8659.
As part of scoping the staff will: (1) summarize the environmental
issues tentatively identified for analysis in the EA; (2) solicit from
comments all available information, especially quantifiable data, on
the resources at issue; (3) encourage comments from experts and the
public on issues that
[[Page 12067]]
should be analyzed in the EA, including viewpoints in opposition to, or
in support of, the staff's preliminary views; (4) determine the
resource issues to be addressed in the EA; and (5) identify those
issues that require a detailed analysis, as well as those issues that
do not require a detailed analysis. Consequently, interested entities
are requested to file with the Commission any data and information
concerning environmental resources and land uses in the project area
and the subject project's impacts to the aforementioned.
o. The tentative schedule for preparing the Center Creek EA is:
Major Milestone--Target Date
Ready for Environmental Analysis Notice--April 23, 2003
Draft EA Issued--July 16, 2003
Final EA Issued--September 17, 2003
Note: The schedule is going to vary depending upon the
circumstances of the project (deficiencies, additional information,
etc.) See Guidance for Publishing Hydro Licensing Schedules.
Magalie R. Salas,
Secretary.
[FR Doc. 03-6024 Filed 3-12-03; 8:45 am]
BILLING CODE 6717-01-P